CHARLES
DERIT
PROJECT MANAGER
PROFILE
Highly dynamic, proactive, and result-
oriented professional having more
than 20 - years plus in-depth
experience in engineering,
procurement, construction, and
project management for housing to a
high rise building and horizontal
construction, oil, and gas, and
industrial constructions.
Analyze, manage and resolve any
type of complex and multiple
challenges with ease, foresight,
planning, diligence, integrity, and
commitment within specified
parameters of safety, quality, time, and
cost (SQTC).
OBJECTIVES
To work pragmatically in an
organization where I can show my
talent and enhance my skills to meet
company goals and objectives with full
integrity and zest.
CONTACT
PHONE:
EMAIL:
adh18d@r.postjobfree.com
SKILLS
o Project Management
o Engineering Design
o Ship Building, Conversion, and
Balancing
o Proficient in Microsoft Office
Application
WORK EXPERIENCE
ABOITIZ CONSTRUCTION INC. - PROJECT MANAGER
Tipolo, Mandaue City, Cebu, Philippines
April 23, 2019 – Present
PROJECT HANDLED
Amoa Housing Project, 750 – House Units Enclave 1 & 4 Brgy. Tamiao, Compostela, Cebu
DUTIES & RESPONSIBILITIES
Manage and Identify project objectives in line with the corporate objective and cascade to project personnel,
Identify, recommend and implement strategic action plans in line with corporate and group action plan,
Set an example to the team in compliance with EHS and Ethics Policies,
Lead the Project Team to implement company vision and mission objectives,
Responsible for setting the company’s Quality Standards, Policies, and Procedures on Project Site,
Manage different Project Supervisors to ensure projects are executed on-time, of the correct quality, within established budget and no lost-time accident,
Coordinate to a different department to resolve the escalated issues from the project site,
Identifying procedures and processes to ensure proper installation according to plan, approved budget, schedule, specifications, and safety without compromising quality and to minimize warranty claims,
Ensure that all site issues and concerns are all attended in a timely manner either deciding on the issue or escalating to the proper channel.
o AutoCAD 2D, Primavera, and
Microsoft Project
HOBBIES
o Reading Engineering
Books
o Practicing Martial Arts
o Watching Action Movies
DAYCHA ENGINEERING & KONSTRACT - DIRECTING MANAGER 1036 Villa Fatima, V. Rava Ave., Guadalupe, Cebu City, Philippines July 25, 2017 – October 20, 2018
PROJECT UNDERTAKEN:
Design & Construction/ Project Management:
Design evaluation on High Point Properties & Realty Development Corp., Escario St., Kamagong, Cebu City o High Point Tower a 19-Storey Office and Residential Building
Design evaluation on CIA 2ND Campus Project, Dap-dap Rd., Mactan, Lapu Lapu City, Cebu
o 2-Storey IDP Building
o 4-Storey Admin and Cultural Building
o 7-Storey School and Dormitory Building
Structural Engineering & Construction:
CITP Super Bloc, Zone-4 Building, 28-Storey – Makati Development Corp.
o 6th to 11th Floor Level, Structural Works (Formworks, Rebars, & Concreting),
Vistamar Beach & Residential Estates, Mactan, Lapu-Lapu City, Cebu
o Interior Painting Works of 25-Storey Condominium – The Reef Mactan,
Avida Riala Tower -1 Project, Asia Town I.T Park, Lahug, Cebu City
o Architectural Works at 5th to 8th Floor Level of 36 Floor
CITP Central Bloc Project, Asia Town I.T Park, Lahug, Cebu City o Retaining Walls-Formworks,
Cebu Imperial Palace Water Park Resort & SPA Amusement and Entertainment Center, Maribago, Lapu-Lapu City, Cebu o Installation of under sheeting Roof & Water Proof Asphalt Shingles at The Cebu Palace Casino,
St. Vincent Parish Church, Buanoy, Balamban, Cebu o Construction of Suspended Ceiling at SVF Parish
Church,
RYAN BERNARD GO RESIDENTIAL, Phase 8, Paseo Siegfredo, Maria Luisa Subdivision, Cebu City
o 2-story Residential Unit
JOSEPHA REALTY CORPORATION, June Ave., Capitol Site, Cebu City
o Modification of JRDC Building Entrance Slope Ramp & Basement 1 &2
Department of Public Works& Highways (DPWH) – 5thDistrict Engineering office,
V. Sotto St., Cebu City
o 186 LM Road Concreting –Manlayag, Danao City,
Cebu
o MPB Covered Court – Yati Elem. Schl, Liloan, Cebu o Expansion of 1 Storey RHU Bldg. – Pob., Sogo, Cebu o 5 Units Standard 4 Seaters Toilet & Hand Washing – Danao City, Cebu
o 9 Units Stand. 1 Seater Toilet Attach Type – DepEd Danao City, Cebu
o 1 Unit Standard 1 Seater Toilet Attach Type – DepEd Sogod, Cebu
o 1 Unit Standard 1 Seater Toilet Attach Type – DepEd Borbon, Cebu
6-Storey Building and 9-Storey Building with 1-Basement Prestigio Complex (Under JY Construction Inc.),
Mandaue, A.C. Cortez Ave., Mandaue City, Cebu
3-Storey Storage Town Project of Cokaliong, (Under JY Construction Inc.), A Sino St. Kasuntingan Mandaue City MEGAWIDE CONSTRUCTION CORPORATION - PROJECT MANAGER 20 N. Domingo St., Quezon City, 1112 Metro Manila, Philippines November 25, 2015 – July 23, 2017
PROJECT HANDLED
Mactan Cebu International Airport (MCIA) – Terminal 2 Project Mactan, Lapu lapu City, Cebu
DUTIES & RESPONSIBILITIES
Oversee and administer all construction contracts including contractor selection, contract negotiations, requests for information, change orders, change requests, and contract closeouts;
Direct the work of the operations team and related subcontractors. Establish construction schedules, cost estimates, and submit progress and summary reports to top management;
Coordinate with airport project management team and direct a multi discipline team of professional staff and outside professional firms to produce project design documents and construction bid sets;
Coordinate the design review process with all stakeholder departments and conduct development meetings during project construction;
Supervise the Airport’s environmental compliance function including compliance and permitting;
Participate in interaction with airport management, Department Of Transportation and Communication, Civil Aviation Authority of the Philippines regarding Airport construction projects;
Monitor compliance with municipal laws and regulations related to areas of responsibility;
Maintain complete knowledge of new developments and trends in the field of Airport design and construction, incorporate new advancements as appropriate into programs;
Manage and participate in the development and
implementation of goals, objective, policies, and priorities for assigned programs; recommend and administer policies and procedures;
Plan, direct, coordinate, and review work plan for staff; assign work activities, projects and programs; review and evaluate work products, methods, and procedures; meet with staff to identify and resolve problems;
Select, train, motivate and evaluate assigned personnel; provide or coordinate staff training; work with employees to correct deficiencies; implement discipline and termination procedures;
Oversee and participate in the forecast of funds needed for staffing equipment, materials, and supplies; monitor and approve expenditures; implement adjustments.
MAKATI DEVELOPMENT CORPORATION - AREA PROJECT MANAGER 1oth Flr. Ayala FGU Center, CBP, VisMin OpCen, Cebu City, Philippines April 8, 2013 – November 23, 2015
PROJECT HANDLED
Avida Towers Riala Projects, Jose Maria Del Mar Road, Cebu I.t. Park, Brgy. Apas Lahug, Cebu City
A 32 Storey High in Residential Condominium Tower 1 & 2
A 34 Storey High in Residential Condominium Tower 3 DUTIES & RESPONSIBILITIES
Manage and lead the planning and/or implementation of the project. Participate in the design and/or testing phases;
Facilitate the definition of project missions, goals, tasks, and resource requirements, resolve or assist in the resolution of conflicts within and between projects or functional areas, develop methods to monitor project or area progress, and provide corrective supervision if necessary;
Responsible for assembling the project staff; for their technical or functional development, performance, and/or termination during the project;
Manage project budget and resource allocation. Facilitate the definition of service levels and customer requirements. Interact regularly with clients to determine their needs and to develop plans for improving delivery;
Advocate on behalf of clients and represent clients' needs as appropriate to senior management. Work cross functionally to solve problems and implement changes;
Follow a defined, agreed-upon project management methodology;
Submit / Present oral and written reports defining plans, problems, and resolutions to OpCen Head – VisMin OPCEN – COG1.
NESIC S.A. CO. LTD. - PROJECT CONTROL MANAGER / CONS’T INTERFACE COORDINATOR, (Saudi Aramco
Projects)
Al Khobar, Kingdom of Saudi Arabia
October 15, 2011 – March 27, 2013
PROJECT HANDLED
Saudi Aramco Mega Project YANBU ARAMCO SINOPIC REFINERY PROJECT (YASREF), Communication Package MC 2 & MC 8;
Flexibility between HDGP & HGP for R & H, K1 & K2, K3 & K4 Existing Well – Khurais Area;
Flexibility between HDGP, HGP, UGP & SGP – Haradh Area;
Transfer of 5 Units OTN UTMN Wells – Utmaniyah Area; DUTIES & RESPONSIBILITIES
Assist to Project Director, manage and oversees project controls for engineering,
procurement, and construction projects. Responsible for project planning and scheduling, cost estimating and monitoring resources, and quality review. Manage project control personnel;
Establish an operating procedure and policies to mitigate risk. Guide Project Managers, and interface with clients;
Responsible for developing and maintaining detailed project plans;
Identifying accurate critical path, key milestones, keeping track of resources requirements, and cost information;
Maintain close communication with project teams throughout the project lifecycle;
Regular feedback through standard reporting, including analysis of variances and potential mitigation measures, must provide to the project teams;
Undertake related tasks such as preparation of program level schedules, trend analysis, and staffing forecast;
For Construction Interface Coordinator Duties:
Manages identifies and resolves internal & external interfaces with respective Client and EPCs Contractor teams;
Ensure interface agreements are developed and all actions are implemented and closed, coordinates the identification and management of interface technical data;
Prioritizes delivery team focus to support regulatory submittals and approvals, drives the interface management process;
Own the Interface Data Register, Tie in Point Register, Action Item Register, Query Register, and Query Forms;
Regularly distributes a copy of sorted Interface Registers to relevant & concerned parties, identifies, and enters new items not already covered in IDR;
Implement continuous updates into the registers, IMS Web, and reports to the PD.
AL-ABNIAH PRECAST CONCRETE - PROJECT MANAGER
BLDG. FACTORY
Al-Khobar, Kingdom of Saudi Arabia
June 18, 2009 - September 11, 2011
PROJECT HANDLED
2,700 Sq.m 3-Storey Al-Abniah QA/QC Lab. & Maintenance Building;
5,000 Sq.M. Al-Abniah Special Elements Factory;
65 KM Al-Abniah Boundary Wall;
Royal Commission Housing, 15 Units 3-Storey Type A2 Villa, Al- Jubail, KSA;
21 KM TAMDID Pipes Boundary Wall, Dammam, 2nd Industrial, KSA;
NESMA Roots Compound Zone 1 to 10 with a total of 55-Units, 2- StoreyVilla, precast concrete (Insulated Wall, Solid Wall, Beams, Stairs and Hollow core - Jubail, KSA;
65 KM Al-Abniah Boundary Wall, Dammam 2nd Industrial, KSA;
21 Km. TAMDID Pipes Boundary Wall, Dammam 2nd Industrial, KSA;
4 – Storey Baker Hughes Technology Center, Dhahran, KSA;
200 Units 3-Storey Staff Housing Villa, King Faisal University, Al- Ahsa, KSA;
3–Storey Electronic Education Center, King Faisal University – Al Ahsa, KSA;
Phase 5&6 Precast Boundary Wall & Garage for Housing 815– C08 & C09
Royal Commission, Al-Jubail, KSA.
DUTIES & RESPONSIBILITIES:
Manage projects, Planning, and Scheduling various Precast Erection Activity as well as coordinate with production and Clients;
Monitor Manpower, Equipment, and Requirement for erection works regarding smoothly progress of the project in respect to Quality of Work;
Inquire Inventory for Material Supplier, Vendor, and Contractor for project Requirement;
Implement Quality Assurance and Quality Control System in Project;
Carried out various laboratories, field testing of material for erection, and reviewed test certificates submitted by subcontractors and suppliers;
Prepared Quality Plan and Methods of Statements for Erection work;
Planned erection activity, cranage, tendering, and estimate cost for various erection works;
Coordinate with quality inspections & develop project QAP as well as procedures;
Strong exposure to Planning for Execution of Erection works;
Good communication with excellent relationship management and interpersonal approach;
Achieved the best standards of Housing, Industrial building construction, and or Erection.
Resource Planning & Control:
Controlling project activity ad Resources using the latest computer software;
Managing and supervising entire execution of erection work of big and small projects;
Coordinate with the client, management, and contractors for the progress of the project and timely completion of the project erection.
ULB ENGINEERING & CONSTRUCTION - Operations Manager SERVICES
Arpili, Balamben, Cebu, Philippines
January 11, 2009 - June 12, 2009
PROJECT HANDLED
Tsuneishi Heavy Industries (Cebu) - Shipyards 4 & Dry Dock;
Construction of 25,430 Tonnage M/V C100 Cargo Vessels DUTIES & RESPONSIBILITIES:
Build a team to properly monitored quality, cost, schedule, and organization of construction under his jurisdiction;
Under his supervision are site engineer and site architect;
Final evaluation and approved contractor’s progress billing;
Preside coordination and design issue meeting;
Prepare all necessary project document before implementation such as work schedule, schedule of manpower, schedule of tools and equipment, ordering and delivery schedule of materials, bar cutting and bending list, temporary facilities layout;
Responsible for documentation and safekeeping of project records;
Reviewed and checking of the plan before implementation;
Define finishing specification based on inputs from client, design architect, and Marina standard specification;
Follow up designer for all queries, revisions, approvals, details, and others;
Approval of inspection and work request, purchase order, work permit, overtime permit, leak test, hydraulic test, flow test, flood test, and pouring request;
Prepare weekly summary accomplishment and material report;
Assure that all delivered materials are based on plan and specification and proper storage;
Closely monitor and coordinate site engineer supervisor, site architect, and purchaser for the timely delivery of materials, tools, and equipment and other logistic needed in project site;
Regularly update the General Manager of the entire event taking place in the project site.
PRIMARY STRUCTURES - Sr. Civil Engineer / Formworks Engineer CORPORATION Specialist – Operations Head
#333 V. Rama Ave., Cebu City, Philippines
June 6, 2005 – January 8, 2009
PROJECT HANDLED
4 – Storey Elizabeth Mall Expansion;
4 - Storey ASPAC Bank;
6 – Storey Ong King-King Warehouse Building;
5 - Storey AVON Plaza;
2 - Units, 23 – Storey Citylights Garden Condominiums Tower 3 & 4 Phase 2;
12- Storey IT Building (i2);
2400 Tonnage Steel Barge & 1300 HP Tug Boat - Concrete Solution, Inc;
19 - Storey GV Tower Hotel;
DUTIES & RESPONSIBILITIES
Assist Project Manager in accordance with drawing, specification, and management instructions;
Plan, co-ordinate and pre empt problems at the site and to ensure smooth progress;
Communicate and coordinate with customer, clarify requirement, plan, monitor, and control the project, including carrying out the implementation of the project;
Analyze, manage, and track project costs against budget;
Ensure project success with right engineering methods within the approved budget and given deadline with pre specified quality;
Perform leadership and direction within the project execution team;
Prepare overall planning and programming schedule including baseline and recovery program;
Monitor and analyze project progress;
Prepare necessary project report;
Monitor the quality control process to meet different requirements.
Supervise contractors, sub contractors, suppliers, and site staff;
Be aware of the legal and requirement and significant environment aspect/ impacts &occupational safety and health hazard/risk associated with their work activities;
Ensure that works on site are executed in accordance and comply with local authority requirements.
August 2008 - January 2009
Assign to Primary Skills, Inc. -A Subsidiary Company of Primary Structures Corp.
Operations Head
Project Handled:
Amphitheater - Doha, Qatar
Duties& Responsibilities:
Develops and maintains a pool of qualified skilled and professional for our overseas project in DOHA, QATAR – Amphitheater Project. Screens and evaluates applicants. Establish a good working relationship with the personnel of POEA, OWWA, and other government agency;
To fill up the workforce that compliments the requirement of PSI as reflected on its table of the organization;
Recommend and refer people to management who immersed in the industry, knowledgeable about the business, and are capable of adding value to the whole organization;
To set up the systems, procedures, and documentation required to expedite deployment;
To augment the PSI workforce pool of competent and deployable overseas workers;
In charge of training center;
Performs other duties and responsibilities, as deemed necessary in carrying out the above tasks, as determined by the immediate superior;
CONVEX CONSTRUCTION - Sr. Civil Engineer /
& DEVELOPMENT CORP. Planning & Control Analyst
#3 Palalan, Brgy. Itaas, Malati, Manila, Philippines July 25, 2003 – June 3, 2005
PROJECT HANDLED
Development of 24 Hectares BRIZA HOMES SUBDIVISION and Construction of 324 Units, 2 –Storey Residential Building Aboitiz Land, Inc.
Design & Conversion of 19,812 Tonnage M/V SUPER FERRY 1
(Cargo & Passenger Vessel).
Design & Conversion of 20,243 Tonnage M/V SUPER FERRY 9
(Cargo & Passenger Vessel).
Design & Conversion of 24,638 Tonnage M/V SUPER FERRY 12
(Cargo & Passenger Vessel).
Design & Conversion of 25,654 Tonnage M/V SUPER FERRY 18
(Cargo & Passenger Vessel).
Design & Conversion of 25,654 Tonnage M/V SUPER FERRY 17
(Cargo & Passenger Vessel).
Design, Lengthening, & Conversion of 22,452 Tonnage M/V SUPER FERRY 19 (Cargo &Passenger Vessel).
DUTIES & RESPONSIBILITIES
Take charge of all planning, design, scheduling, and implementing all structural, civil, and architectural works, with project cost within the budget. Enhance the quality of works for owner’s satisfaction;
To ensure that the structural and Architectural design, materials, and installation comply with the specified requirements with the Marina and DNV;
To ensure that the evacuation plan and safety measures comply with the specified requirements with the Marina and DNV,
To act independently to ensure that the quality objectives are met.
Design and implement Structural Steel Main Frames, Bulkhead, and Side Shell at Port & StarBoard and Deck modules,
Responsible for all structural, Architectural, and civil works,
Responsible for all plans, details, and specifications,
Prepare a schedule of works (PERT CPM & BAR CHART), coordinate and monitor all works or projects undertaken to facilitate a smooth flow of operation and meet required target completion date at a maximum time and least cost,
Implement consistently the plans and specification of the project,
Perform inspections of materials arriving at the site before fabrications and installations,
Monitor of the quality of work as per specification,
Monitor the installation works before submission for inspection and advises if there is any deviation from the specification,
Create and preserve a most favorable company image by conducting a function most ethically and fairly,
Uphold and promote the good name of the company in all transactions with Customers, Suppliers, co employees, and other individuals.
Authority:
Authorized to determine the compliance or otherwise of permanent works and components.
Authorized to issue non conformance reports and advise concerning the status of the works.
Authorized to signed or approved and evaluates
subcontractor's billing.
SALAZAR CONSTRUCTION & - Project Engineer In-charge& Material EQUIPMENT RESOURCES Engineer Representative
3-Flr. SIT Bldg., N. Bacalso Ave., Cebu City, Philippines March 22, 2002 - July 23, 2003
PROJECT HANDLED
DPWH National Project ADB Assisted 6th Road Project Structural Overly Component Contract Package CB A; Barili – Carcar Bato Road Project. Southwest Cebu Province, Cebu City, Philippines
DUTIES & RESPONSIBILITIES
Take charge in all planning, scheduling, systematization, monitoring, coordination, quality control, and implementing the construction of all structural and civil works including rebars and concreting works, and see to it that everything is based on the detailed plans and specification. Deliver the project in time, with project cost within the budget. Coordinate with the purchasing, engineering, architecture, and warehouse department for all project concerns.
KONSULT CONSTRUCTION CORP. - Form OJT - Project Engineer In-charge & Cost Analyst
4-Flr. Pelaes Bldg., Jones Ave., Cebu City, Philippines June 8, 2000 - March 20, 2002
PROJECT HANDLED
10,801 Sq.M. Mirabene Manufacturing, Inc. – Production Building;
3-Storey Mirabene Manufacturing, Inc. Office & Showroom Building;
4 – Storey Fortune Motor Parts& Auto Supply Building;
4 – Storey MWjj Trading Corporation Building;
San Juan Casting Inc. Ltd. Production Building.
DUTIES & RESPONSIBILITIES
Assume overall responsibility in planning and implementation of all architectural and structural works that include formworks, pre cast, rebar, and concreting works and see to it that everything is based on the approved plans and specifications. Also, systematization, monitoring, coordination, quality control, and delivering the project on time, cost within the budget, and promotes customer satisfaction.
EDUCATION
Nixon University – Online Studies
Master of Business Administration–MBA, Major in Finance Completed December 2012
Course Work:
Sale and Sales Management;
Advanced Project Management;
Project Procurement & Solicitation;
Project Budgeting & Financial Control;
Assessing & Mitigating Project Risk;
Marketing Management;
Advertising Management;
Advanced International Advertising
Electronic Project Design
University of Liverpool – Online Studies
MSc in Project Management in Construction & Infrastructure Candidate October 2011
Course Work:
Advance leading and managing large contemporary
construction and public complex infrastructures development projects;
Acquire modern advanced tools for managing risk, allocating appropriate levels of resources, developing business opportunities and financing options, approaching health and safety implications, considering national security issues, establishing communications protocols, and integrating environmental supply chain logistics and other contractual obligations into project management plans;
Project management implications associated with the technical, organizational, financial, and governmental aspects of large projects and the changing external context. Concord Technical Institute – D. Jakosalem, Cebu City, Philippines Industrial Electrical Technology - IET
Graduated OCTOBER 2008
Concentration: Industrial Electrical Technology
Course Work:
Basic Electricity and uses of different types of Electrical Instrument;
Building Wiring installation using the different types of Raceways;
Transformer Designing, Rewinding, Banking & Polarity Testing;
Phasing of Single Phase Motor & Three Phase Motor;
Installation of the different types of Motor Controllers & Troubleshooting.
University Of Cebu – Cebu City, Philippines
Bachelor of Science in Mechanical Engineering - BSME With ACADEMIC MARCH 2006
Concentration: Mechanical Engineering & Design
Course Work:
Power Plant Design (Geothermal & Diesel)
Hydraulic and Pneumatic
Mechanical Piping
Heating, Ventilation, Refrigeration, and Air conditioning
Internal Combustion Engine (ICE)
University Of Cebu – Cebu City, Philippines
Bachelor of Science in Civil Engineering - BSCE
Graduated OCTOBER 2000
Concentration: Structural Engineering, Design & Construction
Last Year perform 720 hours of Actual On The Job training.
Submitted 4 - Storey Type "C" Condominium Design, Planning, Estimates, and Project Execution Plan. Include the ff: o Structural Concrete & Steel Design
o Concrete Design
o Geotechnical Engineering
o Foundation Design
o Analysis of Framed Structures
o Steel Design
o Strength of Materials
o Construction Materials
o Concrete Chemistry
o Statics and Dynamics of Structures
o Advanced Soil Mechanics
o Theoretical Soil mechanics
CONTINUOUS EDUCATION
Department of Labor and Employment (DOLE)
Technical Education and Skills Development Authority (TESDA), Philippines
March 31, 2016
National Certificate II (NCII) Scaffold Erection, Cert. No. 160***********
Philippine Contractors Accreditation Board (PCAB)
Cebu Contractors Association, Inc. – Cebu City, Philippines October 24-25, 2013
Regional Authorized Managing Officer (AMO)
OSHA Occupational Safety, Health, and Environment Specialist Certificate
STEP- SAFE Training Center & OSHA Academy, Kingdom of Saudi Arabia January 20 – 23, 2013
OSHA Occupational Safety & Health Professional - General Industry
35 PDUs Professional Education Units for
Project Management Professional (PMP)
Project Management Institute - Arabian Gulf Chapter (PMI-AGC) Al- Khobar, KSA.
May 19 - 23, 2012
Concentration:
Know the steps required to plan and manage a project
Use the primary planning documents for implementing a project;
Understand the characteristics of a project and its deliverables;
Understand the standardized approach to the Project Management Processes Five Process Groups, Nine
Knowledge Areas and Forty Two logically grouped processes and Professional Responsibilities;
Know the most common phases of a project life cycle and the typical project management tasks associated with each
Utilize time management, decision making, and
communication skills, to successfully manage and control projects.
DOLE-BWC Prescribed 40-Hours (BOSH) Basic Occupational Safety and Health Training Course,93.50 % Average
Philippine Society of Safety Practitioner – Middle East Region, BWC Accreditation No. 1030-100518-0052, Al-Khobar, KSA. May 11, 2011, to June 10, 2011
Concentration:
Provisions of Presidential Decree No. 442 otherwise known as the Labor Code of the Philippines and Rule 1030 of the Occupational Safety and Health Standards (OSHS).
Tekla Structures – V15.0, TEKLA ME, Kingdom of Saudi Arabia February 6, 2010
Concentration:
Concrete Structures & Steel Detailing
CONDUCTED LECTURES, TRAINING & SEMINARS
IN KINGDOM OF SAUDI ARABIA:
Safety, Health & Environment (OSHA Standard) - Philippine Advocate of Safety Health and Environment (PASHE) & Arab Development Institute
(ADI), Al-Khobar, Kingdom of Saudi Arabia
May 2012 – February 2013
Course:
Personal Protective Equipment (PPE) 29 CFR 1926 & 1910;
Occupational Noise and Vibration Hazards 29 CFR 1926 & 1910
Basic Occupational Hazards 29 CFR 1926 & 1910
Hazard Analysis of Critical Control Point 29 CFR 1926 & 1910
NFPA 5000 Building Construction &Safety Code Overview 29 CFR 1926 & 1910
Behavior-Based Safety 29 CFR 1926 & 1910
Crane and Rigging Safety 29 CFR 1926 & 1910
Severe Weather Action Planning Safety 29 CFR 1926 & 1910
Scaffold Safety 29 CFR 1926 & 1910
IN CEBU CITY, PHILIPPINES:
Technical Skills with Safety Overview - Lauchangco Technical Training Center (LTTC) exclusive for Primary Groups of Company -Cebu City, Philippines
July 2006 – December 2008
Course:
Formworks Systems & Scaffoldings;
Plumbing;
Rigging & Hoisting;
Building Wiring;
Excavation Procedure & Safety
TRAINING & SEMINARS ATTENDED
Department of Trade and Industry (DTI) – Philippines DTI - Cebu Provincial Office, Cebu City
April 25, 2013
Course:
Enterprise Development Seminar
Safety Health & Environment - Philippine Advocate of Safety, Health, & Environment (PASHE), Al-Khobar, KSA
January - February 2013
Course:
Hazardous Materials (HAZMAT)
Personal Protective Equipment (PPE) for Construction & General Industry 29 CFR 1926 &1910
Occupational Noise and Vibration Hazards
Fire Safety & Prevention
Safety, Health & Environment - Philippine Society of Safety Practitioner Middle East (PSSP-MER), Al-Khobar, KSA
Course:
SMS Development & Implementation
OSHA Compliant Job Hazard Analysis
Concrete & Masonry Safety
Overview of the International Building Code
Hazard Analysis of Critical Control Points (HACCP)
Confined Space Entry Program
Safety Inspection in General Construction
Building Management System
Mobile Elevating Working Platforms
Severe Weather Action Planning Safety
Construction Safety Inspection Procedures & Checklist
Accident Investigation Training Program
Foodborne Diseases
OHSA Record-Keeping Safety Program
Scaffolding Safety
Eye Safety Awareness Program
Safe Crane and Rigging Safety
Philippine Institute of Civil Engineers Eastern Province, Saudi Arabia– International Chapter I-01(PIC - EPSA), Al-Khobar, KSA January - November 2010
Course:
Extruded Polystyrene: An Optimal Solution for Building Insulation, By CMCI Protective Coatings, KSA
Basic Paint Technology, By Bitumat, KSA
Oil & Gas Processing, By Oil