DIPAK D
DAS
Coal
fired
powe
r pla
nt, S
team
Turbi
ne, B
oiler
, HRS
G and
Hydr
o Ele
ctric
Powe
r Pla
nt Sp
ecial
ist
M: +91-891******* E-mail: adgixc@r.postjobfree.com Kolkata 700052, WB, India LinkedIn: https://www.linkedin.com/in/dipak- das-19013932 Skype ID: dipak_das4 SUMMARY: B.E(M), MBA(Operations), BOE certified, experienced power plant professional over 37 years in coal fired power plant (steam turbine, boiler & BOP) - unit capacity: 87.5 to 800MW, HRSG - unit capacity: 30 to 250MW and hydro electric power plant – 35MW. Accomplished on-time completion of projects, erection, commissioning, PG test inspection & witness, spearheaded O&M, enhanced PLF, eliminated excess manpower, optimized fuel consumption, currently looking to leverage IPP & CPP in India as well as overseas TARGET ROLE: VP/ Director/ CEO/ Plant Head/ O&M Head/ Operations Head/ Technical Head/ Project Head/ Contract Head/ Construction Head/ Commissioning Head/ Reliability Head/ Technical Advisor.
WORK EXPERIENCE:
Tata Consulting Engineers Ltd: Since July 2008
Maximum team size handled: 50 employees
Designation:
General Manager, Power Business Unit: April 2013 to till date DGM, Power Business Unit: April 2012 to March 2013 Chief Manager, Power Business Unit: July 2008 to March 2011 Job Description:
Supervised commissioning of 6x225 HRSG & 6x225 steam turbine at Qurayyah IPP, KSA
Conducted commissioning & fuel optimization of 2x600MW at DB Power, Chhattisgarh
Executed Pre-commissioning, commissioning, PG test witness for 2x525MW Maithon TPP
Assisted pre-commissioning and commissioning of 5x800MW power plant at Mundra, India
Managed O&M audit 350 MW CPP HMEL refinery, Bhatinda, Punjab, India
Succeeded project management & engineering Support to CESC Budge Budge 250MW TPP 2
Performed contract & commercial management including claim management for Punj Lloyd
– EPC vendor for 2X300MW TPP of Haldia Energy Limited.
Achieved plant betterment & PG test witness of HM-Coke TPP (2X45MW + 1X30MW)
Composed DPR for 2X68 MW combined cycle power plant, Agartala, Tripura, India
Directed commissioning of Co-gen power plant (4MW) of Cabot India, Thane, Mumbai
Prepared commissioning checklist for BTG & BOP
Imparted training on BTG & BOP
Organized and implemented ISO 9001:2008 audit
Produced project & process audit check list
Reviewed technical documents and developed standard operating procedures (SOP)
Participated walk down, consolidated punch list items and resolved the issues
Administered the function of Quality Management System Coordinator
Initiated Balanced Score Card (BSC) implementation for functional heads
Implemented Tata Business Excellence Model (TBEM)
Analyzed departmental need and developed plan for imparting training to engineers
Interviewed engineering candidates for recruitment through on & off campus Achievements
Honoured for PG test inspection & witness of 2x525 MW Maithon thermal power plant
Awarded for betterment of 120MW Hooghly Met-Coke power plant
Appreciated for exceptional contribution as QMSC
Accelerated innovation contest participation
On-time completion of 2x300 MW coal fired power project of Haldia Energy Limited WBPDCL & WBSEB: July 1983 to June 2008
Maximum Team Size Handled: 500 employees
DESIGNATION:
Sr. Manager: April 2004-June 2008
Manager: August 2002 to April 2004
D.E-April 2001 to August 2002
D.E (A)-July 1999 to April 2001
A.E. -July 1984 to July 1999
GET –July 1983 to July 1984
3
Job Description:
Spearheaded power generation
Expedited erection, commissioning and O& M of BTG and BOP (water sys., CHP & AHP)
Mastered the assignment of Control Engr., Shift Charge Engineer, Manager & Sr. Manager
Pioneered in trouble shooting of BTG & BOP (water system, CHP & AHP)
Streamlined inspection, pre-commissioning & commissioning
Managed coal fired power plants: Santaldihi TPP: 4X120 + 2X250 MW, Bandel TPS: 4 X 87.5 MW + 210 MW, Kolaghat TPP: 6x210 MW & Jaldhaka Hydel Plant: 3X9 + 2X4 MW
Involved in O&M of DG set
Introduced condition monitoring of rotary equipments
Established import substitution & vendor development
Developed spare parts management
Implemented lubrication schedule
Prepared coal mill/ pulveriser maintenance schedule
Trained up, motivated, guided, led and controlled young O&M engineers
Enhanced energy efficient solutions for plants & equipment
Upheld O&M of coal handling & ash handling systems
Modified & updated O&M manual
Improved departmental administration
Administered store & purchase functions
Involved in procurement, identification, inspection, binning & codification of spare parts
Established standard time for each operational & maintenance activity
Awarded contracts to vendors
Successfully analyzed project/ activity delay
Achievements
Reduced O&M budget by 20%
Eliminated excess manpower (20% approx)
Optimized specific fuel oil consumption (25% approx) & earned award
Enhanced PLF
Bridge & Roof, India: Jul ‘82 to Jun ’83:
Graduate Engineer Trainee: Executed fabrication, erection & testing of large dia. underground urea piping at RCFC project
4
EDUCATION
1982: BE (M), IIEST, Shibpur, Howrah, India
2013: MBA (Operations) –NIBM, India
CERTIFICATION
1997: BOE- Directorate of Boiler, Kolkata, India
2009: ISO 9001:2008 Internal Auditor – NABET, India 2010: TBEM –TQMS, India
PERSONAL INFORMATION
LinkedIn: https://www.linkedin.com/in/dipak- das-19013932 Postal Address: 2B Parijat Apartment, Kaikhali Daspara, Airport, Kolkata 700052, WB, India Passport: K5212789 (Expiry: 20/09/2022)
Languages Known: English, Hindi & Bengali
Computer Skills: MS Office, Power Point, Excel & Internet Date of Birth: 1st Nov 1960