Resume

Sign in

Manager Construction

Location:
Muscat, Oman
Posted:
October 21, 2020

Contact this candidate

Resume:

GARY HOLLAND

Muscat Oman

00-968-********

adg59b@r.postjobfree.com

PROFILE Construction Manager

Proven working experience in construction management

Advanced knowledge of construction management processes, means and methods

Expert knowledge of building products, construction details and relevant rules, regulations and quality standards

Understanding of all facets of the construction process

Ability to plan and see the “big picture”

Competent in conflict and crisis management

Leadership and human resources management skills

Excellent analytical skills in planning and executing large scale multi step projects.

Managed and led projects in challenging environments and built multinational teams in various market sectors covering Oil & Gas, Commercial and Residential high-rises buidings, Airports, Hospitals, Water treatment facilities and Chemical plants, Power stations coal & combined cycle,oil fired, HVAC systems. FM200 systems E.P.C projects.

Extensive experience of pre-commissioning and commissioning of plant and equipmen, Data Centre’s.

CAREER HISTORY

Current Role – Consolidated Construction Engineering Division Muscat Jan 2019-Present.

MEP Construction Manager - Shahad Labour Camp Projec cost $ 7 Million.

Managed on site construction of 424 man labour camp in remote desert location.

Led installation and construction crew of 150 men.

Increased accomadation units construction by 60% by steamling sub contractors fabrication yard.

Coordinated the build schedule and delivered the project on time with no lost time incidents.

Responsible for budgeting, organization, implementation and scheduling of the project.

Overseeing onsite and offsite construction to monitor compliance with building and safety regulations

Coordinate and direct construction workers and subcontractors

Meet contractual conditions of performance

Review the work progress on daily basis

Prepare internal and external reports pertaining to job status

Plan ahead to prevent problems and resolve any emerging ones

Analyse, manage and mitigate risks

Ensure quality construction standards and the use of proper construction techniques

Drake & Scull Qatar http://www.drakescull.com. 2017 Feb 2018 Dec

Senior MEP Construction Manager Project cost $ 36 Billion.

Project Qatar Rail Depot, Building-14. Project cost

Data Control centre for Qatar Rail network.

Overseeing all MEP works associated with the building. CHW, HVAC Potable water AHU, FCU install.Transfered to QR main station in charge of all pressurised corridors installing the Dura steel ceiling.

Carillion in MENA Qatar http://www.carillionmena.com/mena Janl 2016 –Feb 2017

MEP Construction Manager Project cost $ 5.5 Billion.

Project: Msheireb Downtown Doha - 2 x chilled water plant rooms and site

ooversaw pipe work and hook up to the district cooling main line

ocoordinated all pressure testing flushing to final chemical addition

ofull handover and client support

Achievements

Project completed 2 months ahead of schedule

Occidental Oman Inc Oman http://www.oxy.com/OurBusinesses/OilandGas/MiddleEast/Pages/Oman.aspx May2013 –Oct 2016

Lead Refurbishment Manager

Project: Safah field, Northern Oman - refurbishments

Managed all:

Implementing design changes to reduce Opex-Capex expenditure.

osub-contractors

owork packages documentation and approved implementation- P&IDs, PFDs, PEFs, ISOs, mechanical equipment & vendor drawings – ensured constructability

oSQs and TQs - PTW documentation and signatures

owork instructions – liaised with superintendents and project engineers - scope covered:

process pipework

holding tanks & all asset integrity - pipelines above & below ground

road crossings - open trench excavations and laying <45 metre spools

traffic management

Inspection, excavation, inspection of old lines using NDT methods XRay, UT, phased array, repair pipe lines with bolted clamps,composite wrap, replacment of pipe lines coating and back fill.

Tatweer Petroleum Bahrain http://tatweerpetroleum.com/ June 2011 – March 2013

Lead Construction Manager Associated Gas

Projects:

omultiple process pipeworks – notably 8.6 kilometres, 30” A.E.G line, 7 kilometres of 2 x 10” M.G.I. lines

olinked gas line projects

Accountabilities same as with Occidental; additionally:

otransfer to E.P.C contract for liquid / gas, oil and water pipelines

opigging and hydro-testing

osupporting commissioning and close-out of outstanding PSSR punch lists

Mercury Middle East Bahrain http://mmecorp.ae/ Jan 2010 – April 2011

Site Project Manager.

As Project Manager - project - construction and installation of 2 Valarus gas compression stations

As Construction Manager – projects:

oNew building for Arcapita Bank in Bahrain Project cost $ 1.9 Billion.

oBCA project In Qatar HVAC installation Project cost $ 2.5 Billion.

As Project Manager:

ooversaw installation of mechanical pipework, plant and equipment, district cooling, potable water, and drainage and plumbing installations

omonitored and approved method statements, risk assessments

ocontrolled final installation of all MEP works and closing out inspection reports and NCRs

King Abdullah University of Science and Technology (KAUST) Saudi Arabia https://www.kaust.edu.sa/en June 2009 Jan 2010

Client Mechanical Consultant

Project: build for King Abdullah University of Science and Technology (KAUST) Project cost $ 23 Billion.

Managed:

oPre-test and commissioning checks - district cooling, domestic water systems, infrastructure, and fire suppression systems

oReporting to KAUST and the King’s representatives daily

Mercury Middle East Bahrain http://mmecorp.ae/ Feb 2007 – May 2009

Construction Manager

Project: installation of the district cooling systems for the World Trade Centre Bahrain Project cost $ 150 Billion.

otesting and commissioning

Project: Al Salam Beach - construction of a new island offshore

oroads, pavements, base course layers, asphalt, kerbing etc.

omanaged all Mercury labour

Project: new conference centre, 7 hotel and 6 royal villas

oAMEP and infrastructure

omonitored materials approval list

ocontrolled all budgets / costs and deliverables

PREVIOUS ROLES 1973 – 2008

Site Manager Q A Pipework

Site Supervisor

Sirius Marine Services Ltd https://www.siriusmarine.co.uk/

Crown House Technologies http://www.crownhouse.com/

Pickfords, http://www.pickfords.co.uk/

Hilton Hotels & Resorts http://www3.hilton.com/en/index.html

Rampton Secure Hospital https://www.nottinghamshirehealthcare.nhs.uk/

Wickersley School and Sports College https://www.wickersley.net/

Welding Supervisor – Siemens UK http://www.siemens.co.uk/en/

Coded Welder Dunn International, GEC Turbines, Lynwood Engineering

EDUCATION

University of Hertfordshire.

Bahchelor of Eng with second class honours (first division).

Sept 1989 – July 1992.



Contact this candidate