Objective : I have keenness for bigger responsibilities and still wider canvas to work upon. Experience (Total – 27 Years) :
A) June 2006 – Present (14 years):
UNIT - THERMAL POWER PLANT OF M/s BANSWARA SYNTEX LTD., BANSWARA (Raj.). Sr. General Manager. (Electrical & Instrument)
Successfully installed and commissioned 33MW (18+15 MW) Coal Based Thermal Power Plant in Year 2007 another one in Year 2011.
Successfully installed and commissioned 2x1.25 MW Diesel Generator in Year 2011.
Successfully installed and commissioned 2.5 MW Roof-Top Solar Plant in Year 2016 & 2019.
Thermal Power Plant Project consulted by ARK Consultant, TIRCHI.
Successfully installed and commissioned Effluent Water Treatment Plant like MBBR, Industrial RO Plants, Evaporator, etc.,
Currently Working on new 132/11 KV EHT Yard Installation project and 132 KV EHT Cable Laying of approx. 7 KMs From 220 KV GSS to our Premises
This is independent charge for Electrical, Electronic & Instrument Deptt. of all 6 Units of M/s BSL and reporting to Vice President (Engg) (Please see job profile – enclosed) B) Sep.1994 to June 2006 (11 Years 9 month):
M/s MAHARAJA SHREE UMAID MILLS LTD., PALI-MARWAR, RAJASTHAN. Executive Engineer (Electrical)
Successfully installed and commissioned of 3.8 MW x 2nos. & 2.71 MW x 1no. FO Base Power Plant of MAN B&W (Denmark) makes.
Successfully installed and commissioned of all machines which related to Textile Mill.
Always commissioned the above plant before schedule.
Project consulted by M/s Powerika.
Managed a 36 member of Electrical & Electronic team (Details in job profile)
Page: 1/4
C) Nov. 1993 – Aug. 1994 (10months):
M/s Mukul Electric & Electronic Training Institute, Mirganj, Gopalgang, BIHAR. Electrical Instructor
Worked in Teaching Institution.
Job involved daily teaches to two to four classes.
Strength of Each Class was 45.
Strength of institution was 710.
Qualification :
2004-07 : VBS Purvanchal University Jaunpur, U.P. “B.Tech. in Electrical Engineering with 61.83 %”
1988-91 : Board of Technical Education Patna, Bihar. “Three Years Diploma in Electrical Engineering with 74.14 %”.
Feb. 1993 : F.T.I. Jamshedpur, Bihar. Foremen Training course in “INDUSTRIAL ELCTRONIC & P.L.C.”
Feb. 1990 : R.I.T. Jamshedpur, Bihar. “Entrepreneurship Development Cell”. Special Skills :
Have proven Computer & Communication Skills
Drafting skills in MS Office.
Enterprise resource planning software (SAP).
Posses good Man- Management skills.
Other Information :
I believe in healthy living style and high energy levels. Apart from my mother tongue, Hindi, I can also communicate (oral & written) effectively in Hindi & English with equal ease. I am married & have Twenty years old single child and he is studying in MBBS 1st Year. Date of Birth : 28th Sep. 1970 (50yrs.)
Fathers Name : Shri Binod Kumar Sinha (Ex. Navy)
Spouse : Smt. Shivani Sinha (B.A., B.Ed.)
Passport No. : R 1013275
Physical Standard : Height- 163cm, Weight- 73 Kg.
Supervisory Lic. No.: "4263", issued from Govt. of Rajasthan, Valid up to: 27/9/2020. Drawn Salary : 22.25 Lacs + CL(10) + PL(30) + Well furnished accommodation. Expected Salary : Negotiable
Place : Banswara (Rajasthan) Date : 2020 (Prabhat Kumar Sinha)
Page: 2/4
JOB PROFILE
Prabhat Kumar Sinha
I had opportunity to work on very interesting projects and added a great deal of skill from each assignment. I am detailing some of my past project and the related environment. Current Completed Project ( June 2006 onwards = 14 yrs.): Sr. General Manager (Engg.) of all six units of M/s Banswara Syntex Ltd., Banswara, (Raj.)
* Textile Mill & Co-Generation Captive Power Plant is promoted by Late Shri R. L. Toshniwal & group of companies at Banswara, Dahod Road, RIICO Area, Rajasthan.
* M/s Bnaswara Syntex Ltd. belonging to “Toshniwal Group” of companies added more than 1.5 Lac spindle composite unit in 1970 Banswara, Rajasthan.
* 33 MW (18 + 15 MW) Thermal Power Plant consists of
(a) 75 TPH capacity, 89 kg/cm2 working Pressure & 510 C outlet steam temperature CVPL Boiler,
(b) 16.5 MW H.T.C. China make extraction cum condensing Steam Turbine.
(c) 18MW M/s T.D.P.Ltd. make Water cooled Alternator.
(d) H.T.C. make Water cooled condenser,
(e) ESP System Thermax makes,
(f) Fuel handling systems SOLCON make,
(g) ASH handling systems of ENERGO make,
(h) Water treatment plant Thermax make,
(i) Cooling Tower system Paharpur make.
* Operation and Maintenance of 2x1.25=2.5MW Diesel Generator.
* Operation and Maintenance of 2.5 MW Roof-Top Type Solar Plant.
* Operation and Maintenance of 33/11KV & 11/0.433 KV HT/LT Switch Gears.
* Maintenance of Alternator, AC & DC Motors, Transformers, HT/LT Breakers and Switch Gears.
* Modification in control circuit (A.C. /D.C.) to suit the operational requirement.
* Prepare/Implement, preventive/predictive maintenance schedules.
* Spare parts analysis and maintaining optimum inventory.
* Responsibility for day to day maintenance (Preventive/Breakdown/shutdown) activities.
* Installation and commissioning of Power Transformer (up to 10 MVA at 33KV).
Page: 3/4
* Successfully installed and commissioned Effluent Water Treatment Plant like MBBR, Industrial RO Plants, Evaporator, Mono Belt-Press, etc..
* Currently Working on new 132/11 KV EHT Yard Installation project and 132 KV EHT Cable Laying of approx. 7 KMs from 220 KV GSS to our Premises
* I am entrusted with complete design to commissioning jobs related to the project. The work involves day by day site jobs apart from techno-commercial jobs.
* I report to the Vice President (Engg.)/Joint President of the group of companies. Sep.1994 - June 2006 (11 Year 9 month):
Executive Engineer (Electrical), M/s MAHARAJA SHREE UMAID MILLS LIMITED, PALI-MARWAR (Raj)
* M/s Maharaja Shree Umaid Mills Ltd belonging to “Banger Group” of companies added more than 1 Lac spindle composite unit in 1940 Pali-Marwar, Raj.
* I was in charge of complete Electrical installation, commissioning & testing related to Textile composite unit and reporting to Vice President/Managing Director. In my tenure all project had been successfully commissioned.
* I successfully completed electrical installation, testing, commissioning, Operation, Synchronization by SCADA system and maintenance of (F.O.Base) 2nos x 3.8MW & 1no. x 2.71MW Power Plant and related equipment namely: Siemens/ABB/Alstom Make relay, CT, PT, Siemens make VCB H.T.Breaker, Crompton make VCB H.T. Breaker, SF-6 Gas filled ABB H.T.Breaker.
Nov. 1993 – Aug. 1994 (1 Year):
Electrical Instructor M/s Mukul Electric & Electronic Training Institute, Mirgang, Gopalgang, BIHAR.
This institution was an Autonomous Institution and affiliated by Government of BIHAR. Strength of this Institution was 710.
I was posted as Electrical Instructor for teaching of Electrician and Wiremen Branch.