Post Job Free

Resume

Sign in

Manager Power Plant

Location:
Bhubaneswar, Odisha, India
Posted:
September 06, 2020

Contact this candidate

Resume:

Executive Profile

●Enterprising Leader with experience in executing large industrial & Infrastructure projects and site activities from conceptualization to commissioning and beyond, including technical and commercial specification while focusing on profitability & optimal utilization of resources .

● Took Lead in driving continuous improvement, Value Engineering and innovation across all projects, operations; Also, Presented to Business leaders/ Functional Experts broad project plan with credible plot plan, Lay outs, Budget estimates, and also provide input for improvisation, future improvements,,modifications, Additions or expansions, Replacements and also participate in senior management Think tank.

●Accomplished Greenfield Projects with concept to commissioning activities for

1.Material Handling, ie Wagon Tipplers, Track Hoppers, Conveyor system, Truck Hoppers, Raw Material Crushers, allied structures, electrics & automation, complete integrated system for 200 TPH(max) estimated cost of about 700 crores.

2. Railway Siding:- Earth work, Railway track, Bridges, Signaling system, Weighbridges; all related structures, buildings, equipment, complete integrated system. Installation and Commissioning of Locomotives, Rolling stock, Rerailment equipment etc. Delivered three green field Railway siding from concept to commissioning.

3. Industrial utilities and services:- Compressor Houses, Pump Houses, Inter plant Pipelines, Raw water Treatment Plant, Utility Systems. Workshops, workshop equipment, machine tools, hydraulic press etc.

4. Intake pump house and Pipelines.

5. Industrial Buildings and structures.

6. Procurement, Project Monitoring Budgeting, Estimation and Contract Closure etc.

●Planning, Design Engineering Coordination and Liaising:- Engineering coordination for Lay out finalization, Detailed drawing approval, Liaise with Statutory authorizes to obtain approvals for Railway Siding. Coordinate for Preparation of DPR, Feasibility report, Obtained approval from Competent authorities from Railway, District Administration clearances,Safety, Environment matters. Get prepared, detailed and Engineering- scale plan, detailed Project Plan in terms of activity level breakdown, timelines, Project Risks. Verifying from owners point of view for various contracts, required for the Project,; based on the BOQ document, quality levels, timelines, adequacy of installed capacity, as per the approved plan. Associated with Capitalization and closure of the Project.

● Handled Freight Transportation to the tune of 3 mtpa for Steel and Power Plant. Organize Sourcing of Raw Material. Plan and Carry out inbound and outbound Rail/Road Traffic.

● Handled Commercial function of Rail transportation viz Freight Tariff, Demurrage waiver, appeals, Claims settlement etc.

●Well-organized with track record of controlling construction projects with a flair for adopting modern methodologies; capabilities of administering project planning functions including Onsite Project Execution, Cost/Budget Control, Change and Risk Analysis and Risk Mitigation.

●Expertise in devising solutions, implementing HSE Systems for maintaining environmental and safety conditions; track record of mitigating risks relevant to the business personnel for implementing HSE/Risk Management process, Implementing Zero loss concept.

● Operation and Maintenance of Process and Mechanical Equipment-Distinguished capacities of planning & effectuating preventive, shutdown and breakdown maintenance schedules of numerous plant utilities; computerized Maintenance planning. effective in ensuring zero/minimum breakdown & maximum availability of plants, thereby resulting in increased uptime & equipment reliability. Maintenance Planning, scheduling, budgeting and monitoring. Condition monitoring. Preparation of SMPs.( Standard Maintenance Practices). MIS.

●Anchoring erection & commissioning of equipment used in projects & ensuring completion of project in minimum turnaround time & effective resource utilization to maximize output while adhering to HSE compliances

●Significant experience in evolving and executing SOPs and guidelines, driving best practices and ramping up ROI

●An effective leader with multi-functional approachcombined with excellent communication, negotiation, relationship building and manpower management skills Training and development of team members.

-HSE functions

-Training & development.

Key Skills

CommunicatorCollaborator

IntuitiveInnovator Analytical

Motivator

Team Builder

Career Timeline (Recent 7 Companies)

MP Mining & Energy Ltd - ED Operations-

Professional Experience

Dec’18- Till date with MPMining & Energy Ltd, Jasidih, Deoghar, Jharkhand- ED operations-

Looking after Overall Plant Management & All India Marketing.

Oct’16 – Jul’17 with ICS Indorama (Dario Khudous), Senegal, Africa as Head –Rail Operations & Maintenance

Jun’15 – Sept’16 with PMC Projects (I.) Pvt. Ltd./Howe Engineering Projects (I.) Put. Ltd., Ahmedabad as AVP( Rly-Proj)

Aug’10 – Jun’15 with Jindal Steel &Power Ltd., Angul, Odisha as Associate Vice President – Rail Infra

Growth Path:

Aug’10 – Mar’14 as Senior General Manager (Railway Siding)

Apr’14 – Jun’15 as Associate Vice President (Rail Infra)

Key Result Areas:

●Monitored and executed maintenance projects w.r.t. budgeted cost, demand forecasts & time overruns to ensure timely execution of the projects

●Planned& supported all technical & operational aspects of programme preparation in accordance with local authority regulations, company policies & HSEQ standards

●Deployed various methodologies to analyze processes, recommended modifications to minimize escalations & rejection, realize operational efficiencies, control costs and cycle time

●Generated preventive and corrective maintenance & commissioned work orders and established priorities determining appropriate standard procedures while ensuring availability of required materials

●Identified areas of bottlenecks/breakdowns and took steps for rectifying the equipment through application of troubleshooting tools like RCFA (Root Cause Failure Analysis)

●Supervised numerous planned and unplanned shutdowns including planning and turnaround of various project

●Worked towards material planning, purchase requisitions processing & PO follow-ups; verified material stock levels and incoming material quality

●Developed and managed departmental budget, capital expenditure and conducted forecast

●Liaised& coordinated with Railways at Zonal and Divisional level and undertook the audits, investigations, recruitment, technical evaluation, contract development and inspection activities

Highlights:

●Compiled a report on performance of process & developed new activities for improvement purposes

●Ensured complete in-process quality control and continuous improvement, foreseeing performance bottlenecks and taking corrective measures to avoid the same

●Generated suggestions for improving work processes in various areas

Previous Experience

Feb’06 – Aug’10 with Aditya Aluminum Project (A Division of HindalCo Industries Ltd.), Rayagada, Odisha as General Manager - Projects

Planned & executed infrastructure facilities for plant like rail, road, water supply, rehabilitation colony, office premises and so on at Vizag steel, NINL and Aditya Aluminum (Hindalco) Projects

Growth Path:

Feb’06 – Sept’07 as Deputy General Manager - Infrastructure

Sept’07 – Aug’10 as General Manager - Projects

Mar’97 – Feb’06 with Neelachal Ispat Nigam Ltd., Jaipur as Assistant General Manager - Traffic & Raw Materials

Growth Path:

Mar’97 – May’01 as Manager

May’01 – May’04 as Senior Manager

May’04 – Feb’06 as Assistant General Manager - Traffic& Raw Materials

Sept’86 – Mar’97 with Visakhapatnam Steel Plant (Rashtriya Ispat Nigam Ltd.), Visakhapatnam as Deputy Manager

Growth Path:

Sept’86 – Sept’87 as Management Trainee

Sept’87 – Sept’90 as Junior Manager

Sept’90 – Dec’93 as Assistant Manager

Jan’94 – Mar’97 as Deputy Manager

Sept’84 – Sept’86 with Hindustan Aeronautics Ltd., Koraput Division, Sunabeda, Koraput as AssistantEngineer

Inspected the systems while undertaking activities including commissioning of Railway Infrastructure/Workshops and allied facilities at NINL, Vizag Steel

Education & Credentials

●B.Sc. (Mechanical Engineering) from Regional Engineering College (Sambalpur University), Rourkela. (Presently NIT.)

Other Course:

●Effective Communication at Visakhapatnam Steel Plant, RINL by faculties from Ramanathan’s Institute, Chennai

● General Mangement Development Programme at Hindalco Development Centre, Kolkata

●Leadership Exploration and Development Programme (LEAD) at Jindal Steel & Power.

Academic Achievements

●Rewarded with Upper Primary Merit Scholarship, ME School Scholarship, Junior Merit Scholarship, Senior College Merit Scholarship of Government of Odisha

●Selected for National Scholarship

IT Skills

●MS Office Applications: Word, Excel, PowerPoint

●Internet Applications

S.M. Arshad

E-mail: adfu0g@r.postjobfree.com

Contact: +91-865******* Land Line no-0674 -2541013

An established professional with nearly 33 years of experience; targeting senior level assignments in Project Execution & Management/Operations & Maintenance/Logistics Operations

- Project Mangement

-Construction and site mangement of mega Projects.

- Techno-commercial Operations

- Project Management & Execution

- Logistics Management

- Risk Assessment

- Budgetary & Cost Control

- Client Management

- Regulations & Compliances

- Team Management & Leadership

Aditya Aluminum Project (A Division of HindalCo Industries Ltd.) as General Manager - Projects

PMC Projects (I.) Pvt. Ltd./Howe Engineering Projects (I.) Put. Ltd. as AVP

1986-1987

1997-2006

2006-2010

2010-2015

Visakhapatnam Steel Plant (Rashtriya Ispat Nigam Ltd.) as Deputy Manager

2015-2016

Jindal Steel & Power Ltd. as Associate Vice President – Rail Infra

2016-2017

ICS Indorama (Daruo Khudous) as Head - Railway Operations, Maintenance & Projects.

Neelachal Ispat Nigam Ltd. as Assistant General Manager (Technical services)

Personal Details

Date of Birth:20th January 1962

Languages Known:English, Hindi, Odia & Urdu.

Address:B-3, Metro Towers Apartment, Near Ayush Hospital/Acharya Vihar Chowk, P.O .Bhoinagar, Bhubaneswar – 751022

Mob-865-***-****



Contact this candidate