WHARTON TX. *****
CELL:979-***-**** EMAIL:*********@*****.***
SUMMARY OF QUALIFICATIONS: MY GOAL IS TO INQUIRE
KNOWLEDGE OF THE ELECTRICAL TRADE AND USE THOSE
SKILLS TO ADVANCE IN THE JOB MARKET. I HAVE OVER 3
YEARS OF ELECTRICAL EXPERIENCE IN AN INDUSTRIAL
ENVIROMENT. I AM CURRENT WITH MY DRIVERS LICENSE,
ELECTRICAL APPRENTICE LICENSE, BASIC PLUS AND TWIC
CARD. I AM SELF MOTIVATED TO WORK BY MYSELF OR WITH
OTHERS. I AM WILLING TO WORK WHERE EVER NEEDED, IN A
SAFE AND TIMELY MANNER. I AM EXPERIENCED USING PORTA-
BAN, THREADING MACHINES, CONDUIT BENDERS AND THE USE
OF HAND TOOLS. ALSO HAVE EXPERIENCE OPERATING JLG. I
AM KNOWLEDGEABLE ABOUT SAFE WORK PRACTICES AND
FILLING OUT PROPER PAPER WORK PERTAINING TO SAFETY.
WORK EXPERIENCE:
TEMPLE, TX
EMPLOYER: ZADOK ELECTRICAL
ELECTRICAL HELPER JUNE 2019-
JAN 2020
PULLED POWER AND CONTROL CABLES
FOR START/STOPS AND MOTORS.
INSTALLED CONDUIT FOR LIGHTING.
PULLED WIRES AND TERMINATED 277V
LED LIGHTING FIXTURES. LEAD ON WIRE
PULLING CREW, MADE SURE ALL CABLES
WERE PULLED TO CORRECT LENGTH AND
EVERYONE WORKED SAFELY. TOOK DAILY
LOG OF CABLES PULLED AND REPORTED
BACK TO FOREMAN. HELPED INSTALL
CABLE TRAYS WHEN NEEDED.
BUCKEYE TEXAS PROCESSING CORPUS
CHRISTI, TX
EMPLOYER: MMR ELECTRICAL
ELECTRICAL HELPER AUGUST 2018-
MARCH 2019
FABRICATED AND INSTALLED CONDUIT
FOR LIGHTING, POWER AND CONTROLS.
FABRICATED AND INSTALLED SUPPORTS.
PULLED WIRE AND TERMINATED 480V
LIGHTING FIXTURES. CUT, FABRICATED
AND INSTALLED CABLE TRAY. INSTALLED
DIVIDERS IN CABLE TRAY. ASSISTED
JOURNEYMAN IN TERMINATING POWER
AND CONTROLS IN J-BOX AND AT MOV
ACTUATORS.
CHENIERE ENERGY PROJECT CORPUS
CHRISTI, TX
EMPLOYER: ZADOK ELECTRICAL
ELECTRICAL HELPER MAY 2017-MAY
2018
INSTALL CONDUIT FOR MOTOR AND
CONTROLS. PULLED FIBER OPTIC CABLE
AND CAT 5 CABLE TO PANELS FOR
COMMUNICATION. INSTALLED CONDUIT IN
DUCT BANKS AND HELPED INSTALL
JUNCTION BOXES. INSTALLED CONDUIT
AND PULLED WIRE FOR
INSTRUMENTATION. WORKED AT A GOOD
PACE BUT KEPT A HIGH LEVEL OF SAFETY.
M&G PLASTICS JUMBO PROJECT
CORPUS CHRISTI, TX.
EMPLOYER: MMR ELECTRIC
ELECTRICAL HELPER OCTOBER 2016-
MAY 2017
CUT AND INSTALL BRACKETS FOR
LIGHTING FIXTURE, MOUNTED FIXTURES
AND RAN CONDUIT. PULLED LIGHTING
CIRCUITS AND TERMINATED BALLASTS.
ALL LIGHTING ISTALLATIONS WERE DONE
OUT OF A JLG LIFT. INSTALL CABLE TRAY,
MEASURE, CUT AND PREP FOR
INSTALLATION. TAILED IN CABLE AND
TERMINATED MOTORS. GROUNDED
DIFFERENT TYPES OF EQUIPEMENT.
PERFORMED ALL WORK SAFELY AND KEPT
GOOD COMMUNICATION WITH FELLOW
WORKERS.
PEONY PROJECT FREEPORT, TX.
EMPLOYER: KBR
LABOR JUNE 2016-OCTOBER 2016
HELPED CARPENTERS WITH THE
INSTALLATION OF FORMS FOR CONCRETE
POURS. CLEANED FORMS AND PREPPED
FOR NEW INSTALLATION. TRANSFERRED
TO I&E GROUP. INSTALLED CONDUIT AND
TAILED IN CABLES FOR POWER AND
CONTROLS FOR FIN FANS. INSTALLED
GROUNDING ON MOTORS AND
STRUCTURE.
EXELON GENERATION WHARTON, TX.
EMPLOYER: ZACHRY HOLDINGS INC.
ELECTRICAL HELPER DECEMBER 2015-JUNE 2016
ASSIST IN THE INSTALLATION OF CABLE
TRAY, MEASURE AND CUT BRACKETS FOR
SUPPORT.
MEASURE AND CUT CABLE TRAY, DRILL
HOLES FOR SPLICE PLATES, FILE SHARP
EDGES AND INSTALL.
INSTALL IN RACKS, HORIZONTAL OR
VERTICAL RUNS. INSTALLING BONDING
JUMPERS WHERE NEEDED.
BUCKEYE TEXAS PROCESSING CORPUS CHRISTI, TX
EMPLOYER: BAY LTD
ELECTRICAL HELPER FEBRUARY 2015-
OCTOBER 2015
ASSIST IN INTALLATION OF CONDUIT.
MEASURE TO CORRECT LENGTH, CUT AND
THREAD USING POWER PONY OR 535
THREADERS.
HELP JOURNEYMAN BEND CONDUIT AT
DEGREE THAT IS APPLICABLE. MEASURE
AND CUT BRACKETS, AND INSTALL
CONDUIT USING
DIFFERENT TYPES OF SUPPORTS
DEPENDING ON APPLICATION.
PULL CABLE IN CABLE TRAY. POWER CABLE
AND CONTROL CABLE, FORM CABLE TO
LOOK UNIFORM AND TIE DOWN WITH ZIP
TIES.
PULL CABLE IN CONDUIT MAKING SURE
NOT TO DAMAGE WIRE ON ANY SHARP
EDGES.
WORK ALONG WITH OTHER WIRE PULLER
TO INSURE GOOD COMMUNICATION FOR
BETTER PRODUCTION AND ASSURE SAFE
WORK PRACTICES.
EDUCATION: WHARTON HIGH SCHOOL
CLASS OF 2011
REFRENCES: UPON REQUEST