Post Job Free
Sign in

Engineer Maintenance

Location:
Deer Park, TX
Posted:
August 24, 2020

Contact this candidate

Resume:

Felix Karickal

Mobile: +1-832-***-****

Email: *************@*****.***

HIGHLIGHT OF QUALIFICATIONS

Six years experience in Oil & Gas, Renewable Energy Projects industry which includes 4 years in Mechanical Maintenance experience in Steel Pipe Manufacturing.

Well versed with API and AWS Rules and Regulations.

Regularly liaise with Clients on behalf of my company.

Hands-on experience on - AutoCAD, Navis Works and MS Office.

Willingness to learn and meet the demands of new challenges.

Team work, verbal and written communication skills gained during study and work environments.

Multitasking and time management skills gained through doing multiple projects simultaneously.

WORK EXPERIENCE

Construction Field Piping Supervisor

Organization : Worley – Exxon Chemical Expansion Project, Bay town, Texas.

Duration : (April 2020 - till date)

My responsibilities include:

-Plays a leadership role in the development of the safety culture on the project, making safety a natural part of all work

-Oversee the daily construction activities at work site, including scheduling of workers, delivery of equipment and materials and progress of the project.

-Performs work in conformation with plans, specifications, schedules and cost control estimates.

-Manage the performance of employees through goal setting, ongoing assessment and coaching.

-Working knowledge of P&ID drawings, Isometrics & Structural supports detailed construction Drawings.

-Review, Monitor and control of the welding activities in accordance with planned schedule

-Co-ordaining with Client & QC Inspections reports to get approval.

-Review, Monitor and control of the welding activities in accordance with planned schedule.

As the Construction Field Piping Supervisor in my company, I handle Piping & Structural related detailed drawings review & Field related issues resolve and highlighted to Superintend.

Mechanical Maintenance Engineer

Organization : JSW STEEL – Baytown, Texas

Duration : 3.10 Years (October 2015 - July 2019)

Responsibilities Handled:

-Hands-on experience in projects, operational processes and reliability overall company rotating machineries.

-Establish and reinforce maintenance and safety procedures, service schedules, and facilities maintenance procedures to maintain machines and equipment

-Hands-on experience in heavy rotating equipment maintenance and hydraulics in a Hydro carbon Steel Pipe Manufacturing steel Mill.

-Support planning, design, and development of tools, machines, and mechanical equipment

-Review, Monitor and control of the welding activities in accordance with planned maintenance schedule.

-Planned and supervised scheduled maintenance, preventive maintenance, corrective maintenance and break down maintenance

-Worked as a shift in-charge and shop floor supervisor in Central maintenance department

-Coordinated with central repair shop for machining and assembly of parts like gears, gearbox, wheel assembly, shaft assembly and other required parts

-Work with planning and design teams to drive product development and review tooling specifications

-Co- Ordination with equipment vendor’s new installations & Quality Checks / Approval.

JSW plant produces DSAW pipe (Including large diameter pipe from 24” to 48”) to service energy and petrochemical markets, including large diameter line pipe for onshore and offshore use, heavy duty casing, and piling. The Pipe division also provides OD coating (Fusion Bond Epoxy, Abrasion Resistant Outer) and ID Flow Liner coating

Project Engineer

Organization : Optimums technologies Pvt ltd. – Kerala, India.

Duration : 1.09 Years (June 2013 - February 2015)

Responsibilities Handled:

-Roof top Solar Panel/Grid installation, which includes Preparation Preliminary Structural Design Drawings and details co–ordinate with client and get approved from concerned client according to Rules and specs.

- Prepare procedure for installation of equipments and get approvals.

-Responsible for site daily progress reporting to project manager and inspection of the entire as according to the drawings & Material Take off ( MTO).

-Review, Monitor and control of the welding activities in accordance with planned installation Schedule

-Involved in end to end process of implanting solar panels, invertors and battery installation.

-Provided high technical support to client strategic needs and handling client inquiries and built mini-application

-Co-ordination with equipment vendor’s new installations & Quality Checks / Approval.

COMPUTER PROFICIENCY

-Working Knowledge of AutoCAD, Navis Works, MS Office and Windows OS 7,8,10.

ACADEMIC CREDENTIALS

-Bachelors in Engineering (Graduated) in Mechanical Engineering, Vinayaka Missions Research foundation University, in 2009-2013

INTERNSHIP

PROJECT

Rolling Mill Renovation: Worked on a $500 Million project. The project divided into 3 phases,

Phase #1 and Phase #2 is the upgradation of existing equipment. The project was developed around the quality issues of the rolled plates. Prepared giant chart and schedule the work and resources for the project. Prepared standard operation procedure for the installation and maintenance for the new equipment.

I hereby declare that the above information is true to the best of my knowledge and belief.

Felix Karickal



Contact this candidate