Nov. 24, 2016 –To Present Times. ( QC. Electrical & Instrumentation/ Permit Receiver.)

Review the scope of work, IFC drawing and execution plan as per client standards & requirements.

Resolve and propose solutions personnel for implementing safety at work site.

Execution and follow up of work with supervisor & project manager.

Policies tracking and monitoring of site works developments.

Tracking of field instrument hook ups as per latest and approved PID.

Prepare construction method statements for executing communication works.

Planning of material resources with respect to the delivery schedule

Supervision and inspection of instrumentation works, includes installations of cable trays, field instrument, cable pulling, gland and termination.

Inspection in laying, splicing termination and testing of single mode fiber optics and copper cable for the data and voice communication backbone.

Installation of process tubing and air line for valves

Leak test inspection of the instrument tubing of HIPPS instrumentation

Installation of pressure gauges instrumentation visual inspection of pressure indicator.

Pre-commissioning and commissioning of communication facilities prior for initial start-up.

I’m an approved Saudi Aramco Electrical & Instrumentation Quality Assurance/ Quality Control for Onshore Saudi Aramco Projects.

METAPHIL INTERNATIONAL

BUANOY,BALAMBAN,CEBU PHILIPPINES

Sept.2013 – up to Oct.2016

Electrical Engineer

Manage 100 people including Sub-Contractor Workers

Manage and oversee the work of the Sub-Contractor Employees

Manage the workers of the block for quality results.

Inspection the block of sub-contractor workers as Q.C for the electrical works.

Finish 1 ship in electrical works a month.

Electrical Engr. In charged at a ship project

Report all activities to Manager/Supervisor

HYUNDAI ENG’G AND CONSTRUCTION

ABU DHABI UAE

July 05, 2012-July 10, 2013.

Construction Foreman Instrumentation

Review the scope of work and execution plan as per client standards & requirements.

Resolve and propose solutions for technical site queries.

Prepare construction method statements for executing communication works.

Planning of material resources with respect to the delivery schedule

Supervision and inspection of Instrumentation works, includes installations of cable trays, field instrument, cable pulling, gland and termination.

Inspection in laying, splicing termination and testing of single mode fiber optics and copper cable for the data and voice communication backbone.

Installation of process tubing and air line for valves.

Pre-commissioning and commissioning of communication facilities prior for initial start-up.

KENTZ ENGINNERING AND CONSTRUCTION * AMBATOVY

NICKEL MINING PROJECT, TOAMASINA STATE OF

MADAGASCAR NOV.25, 2010-NOV.15, 2011.

Construction Foreman Instrumentation

Review the scope of work, IFC drawing and execution plan as per client standards & requirements.

Resolve and propose solutions Personnel for implementing safety policies at work site.

Execution and follow up of work with supervisor& foreman

Tracking and monitoring of site works developments.

Tracking of field instrument hook ups as per latest and approved P and ID.

Prepare construction method statements for executing communication works.

Planning of material resources with respect to the delivery schedule.

Supervision and inspection of instrumentation works, includes installations of cable trays, field instrument, cable pulling, gland and termination.

Inspection in laying, splicing termination and testing of single mode fiber optics and copper cable for the data and voice communication backbone.

Installation of process tubing and air line for valves

Leak test inspection of the instrument tubing of HIPPS instrumentation

Installation of pressure gauges instrumentation visual inspection of pressure indicator

Pressure test and final pre-commissioning of the HIPPS

Pre-commissioning and commissioning of communication facilities prior for initial start-up.

TSUNEISHI HEAVY INDUSTRIES CEBU INC.

BUANOY,BALAMBAN,CEBU PHILIPPINES

( 2007-2009 ) Field Engineer 2

As and field engr. I’m supervising and monitoring of the block of Sub-contractor workers.

The scheduled of the block should get the exact time and date to finish or better the scheduled finish in advanced.

Done inspection the block of the sub-contractor workers as Q.C for the electrical works.

Manage the sub-contractor workers of the block for good quality results.

Report all activities to manager and general manager

REFERENCES:

Engr. William Alegato

Asst. G.M. (Maintenance Dept. Tsuneishi Heavy Ind. Cebu Inc.)

Engr. Rolando E. Curaza

Manager ( Sr. Electrical Ship Repair Dept. T.H.I.C.I )

Roles and Achievements:

TSUNEISHI HEAVY INDUSTRIES

At THICI I have achieved as top engineer workers on numerous occasion and have been entered in national employee award.

HYUNDAI ENGINEERING

As Instrumentation Foreman my primary roll was to manage and supervise the borouge 3 utilities project. On a daily basis I dealt with my workers, supervisor and co-foreman for the development of the project site.

KENTZ ENGINEERING

AT AMBATOVY NICKEL MINING PROJECT as an Instrumentation

Foreman my primary roll was to check my works, And check also the works of my men.I was involved in mining project in electrical Instrumentation. This roll required me a better workers and to generate a better production as an productive instrumentation foreman.

MH AL-SHAIBAN EST.

AT MH AL-SHAIBAN EST. as an Electrical & Instrumentation Quality Control (Q.C) Inspector for Aramco project. As a Q.C. Inspector my primary roll was to check my works, And check also the works of my men. I was involved in HIPPS (High Integrity Pressure Protection System) in electrical/ Instrumentation. This roll required me a better workers and to generate a better production as an productive Instrumentation Quality Inspector for Saudi Aramco project for HIPPS.

EDUCATION;

Diploma of Electrical Engineer

University of Cebu ( Cebu City )

Personal Overview

I am 39 years of age and I have live in Abqaiq City Saudi Arabia for 4 years and this my current address: Abqaiq City 31992 Saudi Arabia. I’m a single person. My hobbies include basketball playing guitar here at ESCADAZ Filipino club. And I have been for a member of the ESCADAZ Filipino club for 4 years. I am heavily involved in club activities.

Very truly yours,

CLIFF M. LEGASPINO

QA/QC E/I INSPECTOR



Contact this candidate