PURUSHOTHAMAN. M
********************@*****.***
M: +91-866******* / 814-***-****
* ***** ** **** ********** in Software testing with knowledge in System Integration testing and User Acceptance testing which are majorly involved in the scope of the projects handled. Currently, involved and exposed to Functional Document analysis and Design framing, Test Execution and Defect Management.
Project Experience:
BSF – Banque Saudi Fransi UAT
Duration: 13th April 2020 – Present
Working in BSF’s Round1 Test Basis Design approach phase for Loans module – LOS, LMS implementation which consists of
Identification of Attributes and values WRT to the loan workflow transactions.
Transaction Matrix framing with the identified Attributes and values of a transaction.
Review of Test cases generated by Macro tool with the support from Test Basis Team.
Responsibilities:
Preparation of Clarification document from BRD/FSD.
Attending SOD/EOD calls, MOM and internal calls required to pick the tasks with the team and incorporating the updates discussed.
Sending EOD status and consolidated Task status/issues if any to the Reporting Manager/SME.
FAB – IBG International Business Group UAT Testing
Client: First Abu Dhabi Bank
Duration: 28th January 2019 – 20th February 2020
Company: Maveric Systems
Worked in FAB bank’s France implementation for Migration process from the Legacy system to T24(R13) - supported Test designing, Traceability Matrix and involved in the execution of Global Market products like FX Spot, FX Forward, FX Swap, Interbank Placements and Borrowings, Corporate Deposits and Lending.
There were 4 rounds of rest cycle where used the synthetic days in the Module Testing (1st round) and migrated data from the legacy system for the consecutive rounds.
Analyzed and picked cases for optimization based on the Test coverage, Defect occurrence etc.
Involved in the French language training and DELF A2 Certification as part of the project need.
Responsibilities:
Study of FSD/BRD and framing of Test design and Traceability matrix for respective modules.
Test execution and updating in HP ALM QC.
Raising valid defects and effectively tracking for the closure with proper Defect Injection.
Internal trainings and Assessments in modules related for the upcoming project.
CITI APAC – Banking – Wealth Management - Test case analysis, Test Execution, Defect Tracking, Sanity, SIT, UAT and PAT testing, INC Analysis
Client: Citi Bank APAC SG
Duration: 26th August 2015 – 20th January 2019
Company: Maveric Systems
Location: Chennai
Modules :
CLMS – Collateral and Limit Management System
This is the module where a customer’s Assets/Properties(including all investments MF, SB, Insurance, Physical properties such as House/Office, Automobiles) are validated as a Collateral which is an initial step for Loan approach/booking.
This involves Collateral creation, Limit/Line creation for the provided Collateral, loan booking in the ALS host/CICS scree with Collateral and Line numbers.
Maximum focus of this module and the business flows were with Property collaterals and TD Collateral which need to be booked via RC+(Regional Citi Plus) where other all investment security assets are dealt under MLT Margin Leverage Tracker.
Major projects involved in this module are:
HK e-alert trigger: An e-alert will be triggered for the Statement/Advice enabled customer where he/she opts for a Collateral with having multiple/in-direct relationship for Mortgagors and Borrowers.
SLA Genesis:
This project shows the relationship between CLMS and MLT module where the booked Portflio, Loan simulation are checked in CLMS as Collatrals and Facility(Limits).
CITI Biz SG:
This mainly deals with the Statement, Advice generation with regard to multiple and different Collateral Facility type in batch.
MLT Margin Leverage Tracker:
The Functionality starts with Portfolio setup for a customer with whatever investment securities he has.
Next is Loan simulation for the customer in which we get MLT reference number .
With the above data we can proceed for a loan booking in ALS.
The process involves a term “Margin Erosion” ME which is an index showing the investment status.
Memfis MF, SB modules:
This is an important and major place in citi Eclipse which deals with all the trade placements like Buy, Sell, ETI, ETO, RSP etc are placed and all the Security/product related maintenance are done.
All the customer related RM updates, Customer creation, Account creation, Relationship setup needs to be done as this holds a major operational flow in Wealth area.
Major Projects involved for Execution:
RDIP validation check:
Order placement validation across countries with respect to Security product risk rating and customer risk rating according to the multiple requirement changes with APAC countries.
OWSP validation:
Order placement validation for OWSP setup with respect to customer address and PRCDP(Product Rating and Customer Dynamic Pricing) setup and parameter check.
IPP – Insurance Product Processor, Citi Planner:
One of the modules in Citi bank’s Wealth Management stream. The module deals with the Insurance work flows with in the APAC region like Insurance Account Opening, Policy Booking, Authorisation, Changing the status from Application to In-force, Bulk Account Opening and insurance Policy Booking through Batch, Premium collection/billing validation through batch etc.
Citi Planner – Citi bank’s front end customer validation and manipulation system.
Citi’s one of the channels where all the MF, SB etc. security related trade transactions are placed, Customer risk rating analysis based on various questionnaires, Customer’s deal/plan scheme in investments, insurance product selection, Financial Need Analysis are done.
This is a channel where the trade transactions like Buy, sell orders placed can be captured and validated in Memfis which is main stream module group in Citi Eclipse Application.
Designed the Test cases and execution of the INC’s – Production defects faced in SB with the concurrence and discussion from the concerned team members in the initial phase of Project assignment.
Responsibilities:
Test Execution
Defect Management and involved in Clarification, Status update calls with PMO, Country SME, Biz, Application team, DWH team and other stake holders.
Track with the Dev. and Business people on the approvals and concurrence for Parameter setup, Test case verification, NA follow ups etc.
High level work flow preparation and reverse presentation.
Identification and preparation of Test scenarios/cases.
Identification of critical test case for regression and comprehensive testing.
Daily status report.
RAKBANK - AML – (Functional)-Data Validation
Client : RAK bank
Duration: June 2015- July 2015
Company: Maveric Systems
Description:
Part of RAK Bank’s AML implementation where did the field level validations between the transactional/Account level extracts from the Finacle and its Front end for a period of two weeks. Involved in the Account Opening Process workflow with the application Omni flow.
CITI AML – Banking Domain – UAT Execution, Defect Management
Client : Citi Bank
Duration: December 2013 – Jan 2015
Location: Chennai & Mexico.
Company: Maveric Systems
Description:
Part of UAT testing team in Citi AML PFG project in Mexico region. The major test execution procedures carried out were Phase 1- Data Validation (between the Source system and the alert generating system for transaction monitoring), Phase2 - Display Validation (between the alert generating system-Mantas and Citi CMT-Case Management Tool) and Scenario logic Validation in Citi CMT. Involved in the execution of Phase 1 and Phase 2 of the PFG project for the duration of 5 months.
Part of the two-and-a-half month AML Boot camp training and got equipped on the AML concepts such as OFAC, Transaction Monitoring, and SAR etc. Also, got hands on training on the concepts of SQL, refresher on the Maveric Test procedure and Citi-Eclipse functionalities – SAO, Teller, MLT and FT. Participated in the part of the Reverse KT session on Global AML UAT given by the on-site team from Warsaw, Poland
Undergone formal training in the concepts of Testing &Banking domain for 2 months as part of training course.
Responsibilities:
Test Execution
Defect Review and Reporting
Preparation of Transaction Matrix
Preparation of Functional Test Scenarios and Test Conditions
Preparation of Test cases and traceability matrix
Test execution reporting and Analysis
Defect Review and Reporting
Technical Skills:
Operating Systems : Windows 98, 2000/XP/Vista, Windows 7
Internet Technologies : HTML
Languages : C, C++, Visual Basic 6.0
Database : SQL queries
Others Tools : MS-Office, knowledge on HPQC ALM, JIRA
Languages known:
Tamil (R, W, S)
English (R, W, S)
French (DELF A2 – R, W, S)
Academic Education:
B. Sc (Computer Science) - Thiagarajar College, Madurai.