Post Job Free
Sign in

Mechanical Engineer Project

Location:
Dubai, United Arab Emirates
Posted:
September 18, 2020

Contact this candidate

Resume:

August **** Page *

Agustin S. Borja

Mobile Number: +971*********

Email Address: **************@*****.***

Professional History

July 2019 – Present

AECOM, UAE

MEP Project Surveyor, PCC

Dubai,UAE

April 2014 – June 2019

AECOM, UAE

MEP Project Surveyor, Midfield Terminal Project

Abu Dhabi,UAE

August 2011 – March 2014

AECOM, UAE

Project Surveyor, Measurement Studio

November 2009 – July 2011

AECOM, Bahrain

Project Surveyor,Measurement Studio

November 2008 – October 2009

Faithful and Gould, Dubai, UAE

Quantity Surveyor

August 2006 – October 2008

Gutmann Systems, Dubai, UAE

Quantity Surveyor

Academic Training

BSc degree in Mechanical Engineering

In the Philippines

Affiliations

Registered Mechanical Engineer by the

Professional Regualtion Commission (PRC) in

the Philippines

Member of the Philippine Society of Mechanical

Engineers

Member of Philippine Institute of Certified

Quantity Surveyors, Dubai, UAE

Country Experience

Philippines, Bahrain, UAE

Nationality

Filipino

Languages

English, Filipino

Agustin is enthusiastic, committed to do his work

to the highest quality and standards to meet

client’s expectations.

Key Achievements

Substantial experience in measurement using

CAD Measure and BIM Measure in preparation

of cost plans, tender documents (especially

BQ’s), variations and final accounts.

Quantity surveying work experience both on

high-profile projects in contracting with

internationally recognized consultancies. Also

experienced with newly built multi-million-dollar

(US) projects on a variety of building types:

hotels, healthcare, retail, commercial,

residential, as well as transportation projects,

infrastructure/utilities, airport, and roads.

Career Summary

On August 2011, the Measurement Studio

relocated to the Dubai office in UAE. Agustin

was responsible for ensuring that all MEP

measurement work is carried out in accordance

with the Team’s System of Best Practice. He is

experienced with Plumbing and Mechanical

Installations.

On November 2009, Agustin joined AECOM in

the Measurement Studio MEP cluster group.

During this time, He was responsible for the

preparation of tender documents and bills of

quantities, pre-contract documents and

preparation of cost plans for

mechanical/plumbing installations.

On October 2008, Agustin joined Faithful and

Gould, his role as an office/site-based quantity

surveyor involved the measurement of Bills of

Quantities, whilst also providing assistance in

preparation of Tender analysis and reports, the

preparation of monthly payment applications and

substantiation of variation claims.

August 2020 Page 2

On August 2006, Agustin moved to Middle East

with Gutmann Systems, His role as a quantity

surveyor involved him in the preparation of

monthly payment applications and substantiation

of variation claims, and estimation of material

analysis in preparation of Bills of Quantities.

Agustin brings over 14 years of quantity

surveying experience both on pre contract and

post contract projects across Asia and the

Middle East geographies

July 2019 – Present

AECOM, UAE

MEP Project Surveyor, PCC

Dubai, UAE

Duties and responsibilities

Preparation of monthly payment

application and substantiation of

variation claims.

Verification of Contractors monthly

payment applications and issue

recommendations.

Preparation of budget estimates.

Verification of MOS Materials on Site for

payment.

Evaluation of proposed MEP variations

to the contract of both client and

contractor

Analyzation of MEP contractor’s

proposal variation and prepare the

evaluation of variations.

Negotiation and agree new rates and

star rates with the Contractor.

Analyzation of request for construction

and prepare the rough magnitude of

estimates

Preparation budget estimates on

Concept and Design stage and take

market testing on materials and

supplier‘s quote proposal

Preparation of Tender analysis and

reports

Attends meetings as and when required

April 2013 – June 2019

AECOM, UAE

MEP Project Surveyor

Midfield Terminal Project, Abu Dhabi Airport

Duties and responsibilities

Carrying out the cost of construction works

by methods such as tender rates, star rates,

new rates, build up rates, quotations or day

works. Substantial experience in

measurement using CAD Measure and BIM

Measure in preparation of cost plans, tender

documents (especially BQ’s), variations and

final accounts.

Assesses, negotiates, and agreed with the

Contractor the valuation of change to

Mechanical Works in Midfield Terminal

Complex (MTC), Abu Dhabi Airport Project.

Various knowledge in implementing change

control procedures with the contract.

Support and actively take part in team-wide

initiatives to improve efficient working

practices, such as providing input into the

preparation of new protocols, updating

existing ones, research into new working

practices.

General understanding in reporting and

forecasting of cost during the construction

phase of the project.

General knowledge in implementing

procurement routes such as traditional

design and build, management forms, terms

and serial contracting and other MEP

Works.

Carrying out tender and negotiation process

such as single and two stage tendering, the

use of codes of practice and electronic

tendering.

Understanding alternative construction

details in relation to functional elements of

the design such as different types of

Mechanical, Electrical, Plumbing, Fire

Protections and BMS solutions

Carrying out the contractual mechanism and

procedures relevant to the financial

management aspects of projects. Evaluates

and proposed variations to the contract for

Commercial and Contractual impact.

Prepares Variation Orders (VO) for MEP

works such as change procedures/

valuations, loss and expense of final

accounts

August 2020 Page 3

August 2011 – March 2013

AECOM, UAE

Project Surveyor

Measurement Studio

Duties and responsibilities

Works with our Team Leader. Prior to the

commencement of any task, we effectively

plan their work, including the assessment of

man-hours and likely delivery dates,

including input/preparation of Project

Execution Plans.

Assists in downloading design information

and printing off drawings when required. If

necessary, Drawings are needed to be

converted to an approved format that is

compatible with our measurement software.

Carries out measurement work on a variety

of projects, recognizing the need to vary the

measurement strategy when measuring,

say, cost plans v BQ’s.

Drafts and prepares cost plans and BQ

descriptions which accurately covers the

scope of works.

Prepares measurement preambles as

necessary, to suit the project requirements.

Maintains performance data of each work

task and provide the same to their

respective Team Leaders.

Prepares query sheets/obtain design

clarifications from the design team.

Ensures compliance with all team protocols

particularly, our System of Best Practice (QA

process), making sure all work is self-

checked and of a high standard.

Assists in the preparation of Close Out

reports at project completion and ensure

archiving of all project information.

Supports and actively takes part in team-

wide initiatives to improve efficient working

practices, such as providing input into the

preparation of new protocols, updating

existing ones, research into new working

practices.

Some of the projects Agustin has been involved

with whilst in this role are:

Dubai International Airport T2, Dubai, UAE

Al Raha Beach Resort Project, Abu Dhabi,

UAE

KKMC, Kingdom of Saudi Arabia

KAFD Aquarium, Kingdom of Saudi Arabia

NOGA Tower, Kingdom of Bahrain

Campus Project, Iraq

Baha Mar Hotel and Resort, The Bahamas

Dubai Airshow Hangars, Dubai, UAE

November 2009 – July 2011

AECOM, Bahrain

MEP Project Surveyor

Measurement Studio

Duties and responsibilities

Measurement and take off for MEP Bill

of Quantities (BOQ).

Undertake measurement procedures

and protocols for BOQ.

Pre-contract measurement, in form of

variation and final accounts

Practical implementation of ensuring

quality in all work MEP QA requirements

Checks and prepares quick efficient

measurement updates tender addenda

or cost plans.

Evaluation of proposed variations to the

contract of both client and contractor

Negotiation and agree new rates with

the Contractor.

Preparation of budget estimates.

Perform the require work as project

surveyor firm’s proprietary procedures &

systems

Some of the projects Agustin was involved with

whilst in this role are:

Abu Dhabi Media Zone, Abu Dhabi, UAE

Haramain High Speed Rail, KSA

New Doha International Airport, Doha,Qatar

Beirut City Centre, Beirut Lebanon

Al Ghadeer, Abu Dhabi, UAE

Abu Dhabi International Airport, Abu Dhabi,

UAE

Cleveland Clinic, Abu Dhabi, UAE

Arabsat Headquarters, KSA

King Abdullah Petroleum Studies and

Research Center (KAPSARC), KSA

CAPRICE Gold Hotel, Turkey

August 2020 Page 4

November 2008 – October 2009

Faithful and Gould, Dubai,UAE

Quantity Surveyor

Duties and responsibilities

Undertakes measurement for Bill of

Quantities (BOQ).

Assists in preparation of Tender analysis

and reports.

Verifies Contractors monthly payment

applications and issue recommendations.

Checks and approves Contractor’s final

account.

Evaluates proposed variations to the

contract for Commercial and Contractual

impact.

Negotiates and agrees new rates with the

Contractor.

Responsible for verification of MOS

Materials on Site for payment.

Preparation of budget estimates.

Attends meetings as and when required.

Some of the projects Agustin was involved with

whilst in this role were:

Al Mas Tower, Dubai

Masdar City, Abu Dhabi, UAE.

Al Ain Infrastructure, Al Ain, UAE

Smart City Malta

August 2006 – October 2008

Gutmann Systems, Dubai, UAE

Quantity Surveyor

Duties and responsibilities

Evaluates detailed drawings with reference

to the technical specifications

Undertakes duties in pre- and post-contract

work.

Estimates material analysis in preparation of

BOQ

Surveys the site to prepare actual material

requirement at site & costing

Verifies project specification and

coordination with the contractor

Approves new rates with the Contractor.

Responsible for the specification analysis of

projects.

Some of the projects Agustin was involved with

whilst in this role were:

Jumeirah Lake Tower, Dubai, UAE

Madakhel Tower, Kuwait

Jumeirah Park Villa, Dubai, UAE

King Abdulaziz International Airport, KSA

Saba Tower, Dubai, UAE



Contact this candidate