No **, Maruvoor arasi nagar,
E.B.colony extension,
Airport post,
Trichy-620007
India.
Mobile +91-801*******
**********@*****.***
N.RAGHAVAN
OBJECTIVE
To take up a challenging activities which will leads me to improvement of my skills, knowledge, presence of mind and ultimately way of approach for successful completion of project within critical path.
EDUCATIONAL DETAILS
Diploma in Civil Engineering 2002 – 2005 85% (First Class With Honors)
B.E, (Civil Engineering) 2005 – 2008 74% (First Class)
M.Tech, (Environmental Engineering) 2013 – 2015 9.2 (CGPA First Class With Distinction)
KEY SKILLS
AutoCAD
MS word
MS excel
EXPERIENCE
P & C CONSTRUCTIONS PVT LTD
Nov 2008 – Oct 2009
Position : Graduate trainee engineer
Project details: construction of canal retaining wall and river training works.
Role:
1. Site execution with preliminary surveys (fly levelling) to maintain levels as per drawing schedules.
2. Preparation of Daily progress report, weekly/ monthly progress report, Daily labour report, machinery and equipment journal report and material statement report.
3. Co-ordinate with all sub-contractors and gave them directions for timely completion of work with quality control.
EAST COAST CONSTRUCTIONS PVT LTD
Nov 2009 - Dec 2012
Position: Assistant Engineer
Project details: Trichy water supply scheme at tamilnadu and Construction of vidhya academy college building at kilimanoor (Kerala).
Role:
1. Excavation, laying of pipeline (HDPE and PVC) and Joining of pipelines. Maintaining the gradients as per drawing.
2. Conducted the pressure gauge test after laying in front of city corporation Engineers and SDO.
3. Attended corporation collector meetings every month and followed the suggestions made on minutes of meeting.
4. Execution of work as per drawing, RL checking, Quality controlling as well as submitting materials for lab test and maintain records and preparation of RA bills to sub-contractors.
4. Preparing BBS, Quantity surveying and requirement of Manpower, Materials and Machineries for the building project.
5. Weekly planning of activities before Starting the work and checkout the onsite progress with schedule at end of the week. Analysis of delays occurs and sort out solution at project engineers meeting on Saturdays of every week.
GENERAL RESERVE ENGINEERING FORCE (GREF/BORDER ROAD ORGANISATION)
Nov 2015 – Oct 2017
Position: Junior Engineer ( Central Government / Ministry of defence )
Project details: Office Works and Site Execution (preparation of Estimates/MPR/LPR/DWR/Billing/Tenders & Contracts/ Construction of permanent works on Indo – china Border roads.
Role:
1. Preparation of Estimates / Revised approximate estimates / foreclosure of jobs / Measurement book checking / Monthly progress reports / Linear progress report / Nominal Muster Roll Checking.
2. Conducting of Reconnaissance Survey for selection of new road cutting and preparing of annual project reports for every financial years.
3. Conducting of Quality control test (Aggregate impact value test, Sieve Analysis, cube compression test, Bitumen extraction test and field Density test.)
4. Checking out of temperature of bitumen concrete while mixing at plant and laying temperature at site.
5. Preparing of work diaries for completed works which includes manpower deployed details, machineries & equipment utilized, petrol oil lubricants details, work progress details and consumption of stores.
6. Conducting of conditional survey for bridges & culverts pertaining to our sector and preparing report of damages foreseen at end of every year of monsoon season.
7. Preparing of pre monsoon and post monsoon damages of the structures pertaining to our sector. And preparing Approximate estimate for Immediate restoration of monsoon damages (IRMD works).
8. Conducting of hydrological survey and preparing of hydraulic data report for designing of new bridge proposal which includes plotting of toposheets on trace sheets to identify actual discharge from the rivers origin.
9. Execution of permanent works such as Toe wall, Retaining wall, Brest wall with line drains, culverts and causeway as per Ministry of Road transport & highways (MORTH) specifications.
10. Immediate clearing of Landslides and avalanche’s prone area at Indo-china boarder (Uttarkhand state) for defence purposes.
11. Execution of Snow Clearance Work after end of winter season every year.
PERFECT SQUARE ENGINEERS CONSTRUCTIONS
OCT 2017 to NOV 2018
Position : Assistant project Manager ( Including QS and Billing )
Project details : Construction of Residential Apartments Building G+3 ( Abhang project ) at madipakkam Chennai.
Role:
1. Calculation of Quantities for the project as per drawing and IS codes.
2. Checking and certifying weekly labour bills with reference to weekly work progress report submitted by site engineers.
3. Preparation of Billing of quantities.
4. Preparation and submission of Milestone Stage Running Account bill to Client.
5. Verifying the quantities of material consumed at site with reference to Material bill invoice.
6. Preparation of payment invoice and certification.
7. Maintenance of Technical records and files. (DLR,DPR,Material stock register..etc)
8. Resolvation of disputes arise during execution with subcontractors.
9. Maintenance of Statutory forms for Contract laborers. ( screening Form, Form 11,26,27,28,29 ).
SKYCITY ASSOCIATION
NOV 2018 TO TILL DATE
Position : Maintenance & Inspection Engineer
Role:
1. Supervising all civil maintainance work and all general cleaning, landscaping and gardening maintenance work..
2. Maintainance of all DLR, MLR and weekly wages report.
3. .Checking and certifying weekly labour bills with reference to weekly work progress report submitted by sub contractors..
4. Verifying the quantities of material consumed at site with reference to Material bill invoice.
5. Preparation of quotations for new projects.
6. Attending regular meeting with clients after work confirmation.
7 .Resolving of disputes arise during execution.
ACHIEVEMENTS
Passed Staff Selection commission competitive examination 2014 and got All India overall rank of 1294 and got appointment on GREF (MINISTRY OF DEFENCE).
STRENGTH
Strong Conceptual and presentation skill
Team worker
Handling of both Office and administration works as well as site work
Problem solving, analytical & self-learning ability
Able to relocate according to site availability and situation
Learning new techniques and approach by consulting with superior commanding officer
PERSONAL PROFILE
Name : N. Raghavan
D.O.B : 26 MAY 1987
Passport : Valid international Passport
Father : T. Nagarajan (Rtd BSNL Officer)
Mother : N. Rani (Home maker)
Sibling : N. Ganapathy Subramanian (Pursuing MS)
DECLARATION
I hereby declare that the above details furnished by me are true to the best of my knowledge and belief.