FIROJ ALAM. J. ANSARI
Current Address:-
In side KGN Park-2, 100 ft road,
Opp. Amber tower, Sarkhej road,
Ahmedabad – 380055
Gujarat (India)
E-Mail:-**********@*****.**, ************@*****.*** M.no: 079********
Carrier Overview
B.E. (Civil) with 16 years & 09 month Experience in Site Project Management, Quality Assurance- Quality Control with Audit experience for ISO Certification, Estimation & Billing Work, Liaison Work with government bodies and leading a team in different projects like Infrastructure development
(Road & Bridge), Industrial & Residential Work.
Educational Qualification
Sr.
No.
Academic
Qualification University/ Board
Year of
Passing % age
1) B.E.(Civil) S.S Engineering College, Sidsar Campus, Bhavnagar University, Bhavnagar June-2003 72.28%
2) H.S.C.E G.S.E.B. Sanatan Dharm high school,
Bhavnagar. March-1999 62.92%
3) S.S.C.E G.S.E.B. Sanatan Dharm high school,
Bhavnagar. March-1997 70.57%
Technical Skills
Planning tools software: PRIMAVERA 6.1 (CADD Center). Microsoft office tools: Word, Excel, Power Point.
Operating system: Windows 7, 10.
Personal Profile
Name : Firojalam Jamirulhaque Ansari
Date of Birth & Place : 4th June, 1982 (Bhavnagar) Languages Known : Guajarati, English, Hindi
Nationality : Indian
Sex : Male
Marital Status : Married
Page 1 of 5
Professional Experience
Last Worked Employee
Company Name: TÜV-SÜD South Asia Pvt. Ltd. Ahmedabad
(An ISO 9001-2015 & ISO 17020-2012 Accredited)
Duration: From 7th March-2011 to 7th March-2020.
Designation: Team Leader (Since April-2013)
Roles & Responsibility:-
• Managing an overall projects right from development and delivery encompassing planning, monitoring, controlling phases of project lifecycle, overall inter-discipline co- ordination, administration and resource planning.
• Monitoring of day to day site activity with approved drawings, monitor and review of project progress as per project time line & identifying the hindrance related to the projects.
• Preparation and Monitoring of Quality assurance Plan/Internal Testing Plan for projects and also identifying any non conformance.
• Preparation and checking of audit documents related to ISO: 17020 and ISO: 9001 under the IAF Scope 28.
• To assist the Technical Manager and be present as an auditee during the internal as well as external audits for ISO: 17020 and ISO: 9001.
• Preparation of Daily & Weekly Progress Report, Monthly Progress Report and other reports as per client requirements. Correspondence with all bodies related to projects.
• Checking and certifying the measurements of running bills submitted by the contractor and further submitting to clients.
• Liaising with clients, architects, consultants, contractors, sub contractors & external agencies for determining technical specifications, approval and obtaining statutory clearances and also take follow up for our payments.
• Leading a team of professionals, ensuring suitable deployment and timely availability of manpower (engineers).
• Experience in Testing of all material related to Concrete including Mix design, TMT bars, Soil, Bitumen Road, Finishing item like Kerb stone, Paver block, Structural steel, Tiles, Bricks etc., Drainage item like R.C.C. & GRP Pipe, FRC manhole cover, Bridge Work items like Pile testing (Pile Integrity & Pile Dynamic test), POT-PTFE Bearing, Strand Wire, PSC Girder Stressing & Strip Seal type expansion joint etc. Project Details:
(A) Last Project Deputation:
(1) Construction of 4-Lane Railway Over Bridge on Viramgam BG Line at CIMS Hospital in Ahmedabad
(Client Name: Ahmedabad Municipal Corporation)
Page 2 of 5
Project Duration: From Jan-2018 to March-2020 Team Size: 5 nos
• Bridge having a length of 727 Mtr with 7.5 Mtr carriage ways for both side with project cost of 59.00 Cr in rupees.
• Project activity includes Pile foundations, Pile Cap, Pier Cap, PSC girder with deck slab, PSC Solid Slab & RCC Solid Slab, Crash barrier, Bituminous wearing coat with construction of Bituminous Service Road.
(2) Site Coordination for Providing & Laying RCC Sewage Network in Sanand Area
(Client Name: Ahmedabad Municipal Corporation) (May-2016 to Dec-2017)
• Project includes work of Providing & Laying RCC Sewage Network in Sanand area (62 KM Long) using RCC 225mm dia to 600mm dia NP3/NP4 Pipe.
(3) Site Coordination for Rehabilitation of 1400mm dia Sewer Line from Vasna to Paldi Cross roads in AMC area (Client Name: Ahmedabad Municipal Corporation)
• Project includes work rehabilitation of 1400mm dia Sewer liner by using GRP Liner for 2500mtr length.
(B) Completed Projects:
(1) Construction of 1120 nos EWS housing at Kathwada.
(Client Name: Ahmedabad Urban Development Authority) Project Duration: July-2014 to April-2016 Team Size: 7 nos
• Project includes work of Construction of 1120 EWS housing using monolithic construction technology (MAIVAN Shuttering work System) including infrastructure development, Health Center, Angan vadi, Community Hall and Shopping Complex.
• Project activity includes raft foundation, hollow plinth wall, monolithic casting of whole unit, finishing activities, infrastructure development etc.,
(2) Sabarmati Riverfront Development Project, Ahmedabad.
(Client Name: Sabarmati Riverfront Development Corporation Ltd.) Working Duration: March-2011 to June-2014 Team Size: 10 nos
• Project includes work of Retaining wall with Raft & Anchor Slab, Driven cast in situ pile, Diaphragm wall, Finishing Work of lower promenade, Connecting roads (Bitumen), Underpass at below Bridges, Informal Market, Dhobi Ghat development, Ashram Bag development project, Construction of Toilet Block & Lift shaft, Drainage work & Special filling with available dredging river sand behind retaining wall to get land for infrastructure development on both bank of river.
• Project activity includes Driven & Bored cast in situ pile, Under reamed Pile, Raft, Wall, Anchor slab, Broom finish concrete, Pavement quality concrete, Dry Lean Concrete laying with testing, Embankment & Sub grade filling, GSB & WMM laying, DBM & BC laying, Kerb Stone & Paver Block laying, Brick masonry with plaster, Field dry density test of filling material, Strom Drainage Work etc.,
Page 3 of 5
(3) Various Projects of Gujarat Maritime Board at Alang-Bhavnagar.
(Client Name: Gujarat Maritime Board, Ghandhinagar)
• Project work includes Third Party Inspection work of Widening of Manari River Bridge at Alang, Resurfacing of roads, Construction of Bella Masonry Compound Wall, Construction of Toilet Blocks, and Renovation of Colony Quarter.
(4) Development of Tourist facilities at Dakor Package-1
(Client Name: Tourism Corporation of Gujarat Limited, Ghandhinagar)
• Project work includes Construction of Parking building, Shopping Center, Garden, Toilet Block etc.
Previous Employee
Company Name: ESSAR PROJECTS (INDIA) LIMITED, Hazira (Surat). Duration: From 26th February-2007 to 31st December-2010. Designation: Engineer (Project Roll).
Project Detail:-
• Expansion of steel plant to increase plant capacity of 3.9 MTPA in Hazira (Gujarat) for Client Name: Essar Steel Limited.
• The project includes work of Steel making plant, Corex module, Blast Furnace, Hot Briquette plant, Oxygen plant, Lime Plant, Plate mill& Material Handling System etc. Roles & Responsibility:-
• Supervision & Execution of Constructions, Independently handling all day to day activities of site execution and review of progress and planning of work at regular interval.
• Execution of Structures like pump house, cooling tower, effluent treatment plant, Electrical building, heavy equipment found, cable trench, internal roads & drain.
• Experience in Piling, pile head preparation, pile cap casting, equipment foundation, raft foundation, beam, column, slab, fixing of bolt & insert plate, brick masonry, plastering, flooring.
• To monitor and control establishment, implementation, maintaining process and continual improvement of Quality Management system as per standards.
• Preparation of BBS, certify running bills of contractor.
• To monitor and control cost of the site activities including stores management and reconciliation of materials.
• Taking total site responsibility with respect to safety & continue improvement in safety. Company Name: Paschim Gujarat Vij Co. Ltd.
Duration: From July-2006 to Dec-2006
Designation: Jr.Engineer
• Worked as a Jr.Engineer in pole factory at dist. Amreli Page 4 of 5
• Maintaining production of precast in situ concrete pole & register & other maintenance of office building.
• Maintaining quality measures while execution of R-C-C work &Pole production.
• Preparation & submitting bills to circle office. Company Name: ESSAR Construction Limited, Hazira (Surat). Duration: From 20th September-2005 to 22nd July-2006. Designation: Engineer (Project Roll).
• Expansion of steel plant in Hazira (Gujarat) for a Client Name: Essar Steel Limited.
• Execution & supervision of industrial work for Steel plant unit like Sinter plant, Raw material handling system.
• Construction of different pile cap, bolt fixing on pile cap, 400m retaining wall., 200m long conveyor with flooring & bolt fixing, internal road & drain in plant etc.,
• Maintaining quality measures while executing work of R.C.C.
• Preparation of BBS &certifying contractor’s bill. Company Name: M/s Krishna Corporation, Bhavnagar.
Duration: From 1st July-2003 to 31st August-2005.
Designation: Site Engineer.
• Execution of Residential & Commercial building.
• Total responsibility of site execution and including manpower, materials.
• Taking quality measures for R.C.C. work, finishing work like flooring, brick masonry, carpentry work.
• Preparing contractor’s bill, BBS, daily & weekly reports. DECLARATION
I Firojalam. J. Ansari solemnly affirms that all the information provided above is true and correct to the best of my knowledge and belief.
Yours Sincerely
Firojalam. J. Ansari
Page 5 of 5