Resume

Sign in

Power Plant Project

Location:
Chicago, IL
Salary:
90000
Posted:
July 26, 2020

Contact this candidate

Resume:

Fred Hull Jr.

773-***-****

Date: October **, *019

EDUCATION

College: Bradley University, Peoria, Illinois

Major: Construction Management

Minor: Business

WORK EXPERIENCE

Project Controls / Planning & Scheduling

Interfaced with Engineering and Construction Disciplines in the development of Engineering, Design, Procurement,

Construction and Plant Outage Schedules i.e. Management, Summary, Milestone and Detail level. Developed and

Incorporated the project Work Breakdown Structure [WBS] for scheduled activities. Assigned schedule man-hour and

cost resources per the assigned [WBS] code structures. Provided the client with bi-weekly and monthly cost and schedule

reports i.e. Gantt Bar Charts, Critical Path Logic Diagrams and Resource Histograms as required. Monthly Reports

provided schedule progress, Cost and Schedule Performance Indexes, [CPI] and [SPI]. Theses Indexes determine the

activities scheduled, earned value for the scope of work planned. The extracted schedule data also provided a

benchmark for the evaluation and analysis of the current schedule progress and any variance against the approved

baseline scheduled completion.

In addition, analyzed schedule delays via Critical Path Method analysis [CPM]. Interfaced with Disciplines Leads to review

areas of deficiency i.e. vendor drawing submittals, design changes, procurement delays, staffing and schedule change

orders. Expedited equipment procured for adherence to the project contractual required at site delivery dates.

Coordinated Primavera [8.2] schedule integration with client representatives and subcontractors to review the adherence

to schedule guidelines and best practices i.e. WBS, Global and Project Codes, schedule logic integrity, defined schedule

progress reviews and update cycles. Also lead Primavera basic training sessions to assist existing and new Project

Managers with their transition from using Microsoft Project scheduling software to Primavera scheduling software.

EXPERIENCE

Steel Manufacturing and Production – 1.5 years

Nuclear Industry – 5 years

Fossil Combined Cycle Power Plants – 3 years

Oil Refinery Plant Upgrade – 1 year

Material Handling / Bottom and Fly Ash Conversion / DSI [Dry Sorbent Injection] - 6 years

Other Areas – 13 years

WORK HISTORY

USS / United States Steel Corporation, Gary, Indiana, [November 2017 – Present]

Senior Project Scheduler

Projects: TBBH Fuel Oil to Natural Gas Conversion

CWTS Reverse Osmosis

PK84 / PK80 Electrostatic Oiler Upgrade

Encopanel / Hydraulic Power Unit [HPU] / Upgrade

United Conveyor Corporation, Waukegan, Illinois, [August 2011 thru May 2017]

Senior Project Scheduler

Projects: AEP Mitchell / Bottom Fly Ash Conversion Project

Midwest Generation / Waukegan Station / DSI Project

Midwest Generation / Powerton Station / DSI Project

TVA / Bottom Fly Ash Conversion Projects

Argonne National Labs, Argonne, Illinois, [Dec 2009 thru July 2011]

Senior Project Scheduler

Projects: ARRA Funded Projects

Infrastructure Projects

Fluor Corporation / BP Amoco, Whiting, Indiana, [Sept 2008 thru Oct 2009]

Senior Project Scheduler

Projects: SRC / Sulfur Recovery Containment Project

12 PS / 12 Pipe Still Upgrade Project

Sargent & Lundy, Chicago, Illinois, [ Jan 1997 thru Dec 2001] / [Mar 2003 thru Aug 2008]

Senior Project Scheduler

Projects: SCR Fossil Plant Upgrade / Rail Upgrade Project

LaSalle Nuclear Power Plant, Unit II Outage / DCP Modification Project

Zion Nuclear Power Plant / ER Backlog Reduction Project

Cook Nuclear Power Plant / Unit II Outage / USFAR Upgrade Project

Dresden Nuclear Power Plant Outage Project

Corpus Christi Energy Center / Combined Cycle Power Plant Project

Crawford Station Combined Cycle Fossil Plant / Outage

Earth Tech, Oakbrook, Illinois, [ Dec 2002 thru Jan 2003]

Senior Project Scheduler

Projects: Exelon / ComEd Southwest Region Power Distribution Center

CTA Hydraulic Hoist Upgrade

CTA Heating & Ventilation Units Upgrade

H.J. Russell & Co. / Rust International Inc. Join Venture, Chicago, Illinois, [1993 thru 1996]

Project Scheduler

Projects: Soldier Field Retractable Roof Stadium Conceptual Design Schedule

McCormick Place Expansion Project

Taxi Tunnel Upgrade

North Building Business Center Upgrade

Lakeshore Drive Relocation Project

Arie Crown Theater Renovation Project

Fluor Daniel Inc. Chicago, Illinois, [1979 thru 1981 and 1986 thru 1993]

Project Scheduler

Projects: Amoco Oil Company / FCU 500 & 600 Project

Louisville Gas & Electric Project

The Pillsbury Co. – Pizza Line Expansion Project

REFERENCES

Mr. Bob Birdsall 630-***-****

Mr. Willie Denton 773-***-****

Mr. Ernest Hickey 708-***-****

Mr. John Marcotte 312-***-****



Contact this candidate