continued…
Navin Bajracharya
United Arab Emirates • +971*********
**********@*******.***
Personal Details
Age: 48 • Nepal • Male • Married
MEP Project Management
Dynamic professional, 15+ years of experience in managing various commercial and residential civil projects across energy infrastructure, healthcare, leisure and mixed used development, aviation, industrial, and residential schemes. Strong background in interpreting complicated architectural and structural designs, defining construction methodologies, and testing construction materials. Proven record of devising and implementing robust strategies with an aim to achieve project milestones. Ability to identify complex issues as well as deliver suitable solutions for process improvement. Repeated success analysing operations and designing / instituting program management methodologies to improve efficiency and reduce costs. Skilled inspirational leader and mentor, driving teams toward high performance standards, maintaining a firm conviction in methodology, structure, and reporting transparency. Highlights of Expertise
• Multi-Million Dollar Commercial MEP Projects
• Health, Safety, and Environmental strategies
• Building Design & Construction Management
• Equipment Maintenance & Site Inspection
• Risk Management & Problem Resolution
• Budgeting, Cost Reduction, and Quality Assurance
• Team Building, Leadership, and Development
• Regulatory or Business Compliance
• Cost Analysis & Value Engineering
• Stakeholder Relations / Strategic Alliance
Career Experience
EFECO - Electromechanical Co LLC - (Arabtec Holding Company), Dubai The half billion mixed-use Commercial scheme consist of exhibition hall for Expo 2020 in the shape of pearl required to comply with LEED for platinum certification and Dubai green building Regulation and Expo 2020 sustainability KPIs. Project Manager, MEP - Expo 2020 UAE Pavilion (May 2018 to Present) Manage entire construction operations, such as monitoring project progress, preparing periodic progress report, evaluating engineering design drawings, and resolving any problem place in project completion to achieve defined goals. Lead high-performing engineering and procurement professionals for executing clients’ requirements with the focus of meeting and exceeding key stakeholders’ expectations. Organise commercial meetings with senior professionals and key stakeholders for discussing challenges and suggesting customised solutions.
Produced and submitted Expo 2020 UAE pavilion shop drawings, attaining approval for stakeholders.
Precured all the materials at competitive prices as per defined quality standards along with ensuring compliance with HSE procedures for controlling workplace injuries.
Established expectations and promoted a collaborative and safe working environment throughout the project by reviewing and executing processes as per method statement and ITP (Inspection & Test Plan). Arabtec Consolidated Contractors Ltd. - ACCL – JV, Abu Dhabi Abu Dhabi Plaza, $1.6B mixed-use Commercial scheme which consist 382m High Central Asia's tallest tower. The project scheduled for completion by the end of 2019.
Navin Bajracharya Page 2
SR. Construction Manager MEP – Abu Dhabi Plaza Kazakhstan, Astana (April 2014 to May 2018) Examined and approved design changes, specification, and drawing releases, ensuring compliance with business and regulatory standards. Uncovered and addressed specific deviation or work fails to meet quality standards by evaluating non-conformances reports. Oversaw multiple suppliers and priorities to coordinate production efforts, resolve issues, and improve business relations. Inspected completed installations and observed operations, to ensure conformance to design and equipment specifications and compliance with operational / safety standards.
Streamlined all the procedures via in-depth planning and monitoring of project procedures along with navigating all the project phases from estimates, pricing, drawings, budgets, and performance schedules.
Successfully constructed five mixed towers residential/commercial and hotels and a huge Retail podium. China National Aero-technology International Engineering Corporation, Abu Dhabi, UAE A large state-owned enterprise affiliated to Aviation Industry Corporation of China, Ltd (AVIC, a Fortune Global 500 company); US$ 130.5M project consists of a building with 23 and 29 floors respectively and 518 rooms and corresponding facilities.
MEP Project Manager – Novotel & Ibis Hotels Abu Dhabi (May 2009 to Mar 2014) Collaborated with clients at each stage of the work for compliance and satisfaction along with conducted a critical review of all engineering design drawings of the project before implementation process.
Presided technical review of contract specifications and order changes as well as provided technical directions and departmental formal engineering work instructions to support personnel.
Held overall accountability for the ground-up scheduling, construction, quality control, inspection, code compliance, and timely completion of project, reducing costs and lag time in construction procedures. Additional Experience
MEP Client Representative - Dubai Exhibition City (DEC) – Contract 3, 4 & 6 Dubai World Trade Centre – DWTC, Dubai, UAE
Project Manager - MEP – Arabian ranches 638 villas,277villas, 157 villas,285 villas,324 villas and Umm al-Quwain Marina Development Project, UAE MEP services EFECO- Electromechanical Co LLC - (Arabtec Holding Company), Dubai, UAE
Senior Qty. Surveyor – Shoaiba Power plant Project Stage II–Jeddah Saudi Archirodon Ltd., Jeddah, KSA Sr. In charge MEP Services Micro tech M & E Limited, Nepal, Kathmandu Project In charge - Hyatt Regengy Hotel Kathmandu Hitachi Plant- Binapuri Consortium, Japan & Malaysia JV Education & Credentials
Master’s in Hydro-Technical Construction
Ukraine State Academy of water Management, Ukraine Professional Development: Diploma in Civil Engineering Affiliations
• NEC - Member of Nepal Engineering Council – Kathmandu, Nepal
• NEA –Member of Nepal Engineering Association-Kathmandu, Nepal