CURRICULUM VITAE
Objective:
Seeking an opportunity to utilize my knowledge and skills to contribute constructively
to the organization.
SUNKU ASWARTHA
Qualification:
Master of Technology in structural Engg (M.Tech)
Email:
***********@*****.***
Address:
Near SBI Colony
Chowdamma Devalayam Streeet
Pulivendula-516390
Mobile: 970-***-****
Personal data:
Name : S.ASWARTHA
Father’s Name : Mr. S.Nagaraju
Date of Birth : 16.05.1994
Sex : Male
Nationality : Indian
Marital Status : Single
Languages : English, Telugu, Hindi.
Key Skills
Scope of work:
1.Execution of civil Construction works,
Structure works & finishing Works.
2.Preparation of sub contractors bills,
Nature of execution:
1.Good extensive exposure in High Rise Buildings.
2. Planning and Quantity Control and Monitoring the Execution work.
Academic Profile
Master of Technology in structural Engg (M.Tech)
Intell Engineering College
JNTUA-(2018)
Anantapur-72.5 %
Bachelor of Technology in Civil Engg (B.Tech)
Global College Of Engineering &Technology
JNTUA-(2015)
Kadapa- 68.69 %
Diploma in Civil Engineering (D.C.E)
Loyola polytechnic college(Y.S.R.R)
SBTET- (2012)
Pulivendula-72.53 %
SSC
SSNH High School,
Pulivendula-(2009)-80%
Computer Skills :
Autocad, Staad pro, Auto level, Total station, MS-office.
WORKING EXPERIENCE
Name of Company : VASAVI GROUP.
Department : Site Execution.
Duration : June 2018 - till date.
Designation : Engineer (Civil).
Project 3 Details : VASAVI INFRACON LLP, CONSISTING 18 TOWERS WITH G-3,15 FLOORS COMPRISING 3500 UNITS@BACHUPALLY, (HYD).
Responsibilities:
1.RCC framed structure to withstand wind and Seismic loads.
2.Fire hydrant and fire sprinkler system in all floors and basements
3.It has 18 towers with G-3, 15 floors Residential Apartments with Club house, sports ground, children’s park, library, aerobics and meditation hall, Car parking, ATM, Pharmacy etc..
4.STP water proofing system for raft slab & wall
5.Each floor has a 13Flats, Each Flat have 3Bed rooms with 2attached&1 Common Toilets, Balcony with fully Marble, Tiles Flooring.
6.Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for false ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite.
7.Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels.
8.Infrastructure work including,Roads,Drainage,Serviceyard& compound RCC wall.
Name of Company : VELPULA GROUP.
Department : Site Execution.
Duration : June 2017 - May 2018.
Designation : Engineer (Civil).
Project 2 Details : VELPULA PRIDE CONSISTING 6 TOWERS WITH G-3 COMPRISING 104 UNITS @SHIVANAHALLI 2nd STAGE, YELAHANKA-BANGALORE.
Responsibilities :
1. Prepare & Supervision of all masonry and finishing works like brick masonry,
Plastering, Painting, IPS flooring, tiling, and etc. finishing’s works.
2. Inspection of all the incoming materials like floor tiles, dado tiles, wood etc.
3. Prepare various periodic reports related to project progress.
4. Solving site related technical issues without affecting the progress of work.
5. Prepare & Marking Moat slab & steps as per drawings.
6. Prepare & Marking of RCC Slab @wash basin, drinking water and toilets area
In b/w ledge wall and inclined wall as per drawings.
7. Fixing of pylon & recur columns as per required level & drawings.
8. Marking of brick work @ vomitory staircases, moat staircases, sta&stb
Staircases Areas as per drawings.
9. Coordinate to the planning dept.
10. Control of man power and utilization of other works.
11. Taking of RLs and levels @ IPS flooring and Moat seating steps as per
Drawings.
12. Calculate the quantities as per drawings and material requirement.
13. Preparation of stitching slab with welded mesh @ moat area steps.
14. Checking & Marking of PCC & Grade Slab as per drawings.
15. Preparation of PRW Bills.
Name of Company : MEIL.
Department : Site Execution.
Duration : June 2015 - May 2016.
Designation : GET.
Project 1 Detail : MAMMADAPUR LIFT IRRIGATION SCHEME, GRP PIPE LINE SYSTEM, BIJAPUR-KARNATAKA.
Responsibilities :
1.Taking of R.L’s and levels @ pipe bottom. As per drawings.
2.Checking The Pipe laying and Joints.
3.Coordinate to the Planning Department.
4.Proper Management of Materials and workmanship.
5.Ensure that all the work must the Stimulus and Quality Standards.
6.Monitoring the Daily Progress Report.
7.Calculate the quantities as per drawings and Material Requirement.
8. Preparation of P.R.W bills
DECLARATION
I hereby declare that the above information are true to the best of my knowledge and belief.
Yours Truly,
( SUNKU ASWARTHA)
.