Post Job Free
Sign in

Petroleum engineer

Location:
Ahmedabad, Gujarat, India
Posted:
July 14, 2020

Contact this candidate

Resume:

KAVAN A. BHATT

Email: - ***********@*****.***

Mobile: - +917*********.

M.sc (Indus. Chemistry)/M.tech (Petroleum Engineering); M.tech (Petroleum engineering) from University of Petroleum and Energy Study (UPES), Dehradun. Having 4.8 year’s experience of worked as Field Executive in Reliance Industries Ltd in pre-commissioning & commissioning as well as plant operations of J3-Pet Coke Gasification project in OGBL plant (Off Side gasification Battery limit) in respective units SRU & SFU. Responsible, possesses strong technical skills and proficiency in computer applications.

CAREER OBJECTIVE

To achieve a challenging position in a dynamic and growth oriented industry where my technical, analytical and problem solving skills can be put in for optimizing process and production parameters, de-bottlenecking process problems, successful completion of projects. SUMMARY

Qualified Professional with total experience of 4.2 years of experience in pri-commissioning & commissioning activity and Plant operations of J3-Pet Coke Gasification project in SRU & SFU plants in Reliance Industry Ltd, Jamnagar Refinery Division.

Aim at producing optimum performance through teamwork while creating a work environment that encourages motivation.

WORK EXPERIENCE

Worked with Reliance Industries Ltd, Jamnagar-Gujarat, India for 4.2 years in SRU complex. It is producing capacity is 1650TPD and expanding to achieve world largest refinery & Gasification complex at single location. Technology supplier is FLOUR and LINDE along with process technology of Worley parson.

EQUIPMENTS HANDLED AND COMMISSIONING

Pigging and steaming of pipe lines

Operations of various Pumps and Blowers.

Centrifugal pump and compressors

Induced draft blower and Combustion air blower.

COMMISSIONIG ACTIVITY

Review of P&ID and ISOMETRIC drawing and GA drawing as per need.

Refractory Erection and Preservation.

Loop preparation for process lines.

Hydro test and Pneumatic test of piping and Spools.

Holiday test.

Flushing plan methods.

Steam blowing and chemical cleaning.

Charging of Hydrocarbon and Utilities.

Line Box up inspection etc.

PSSR Self check and Level 1&2.

EQUIPMENT ERECTION

Granulation drums- 44.4 t/hr. capacity

Reactors and Combustion air blower

Refractory dry out for reactors and Reaction furnace

Storage hoppers- 225tonnes working capacity

Storage tanks-4247 m

3

capacity

De super heaters

S&T exchanger

Cyclones

Filters

Various types of valve installations and Flare system

Column internal erection

INSTRUMENTATION

Loop checking of Piping Instruments as well as Equipment Instruments

Instrument Tag checking with PID and DCS as well as PLC

Simulation.

JOB PROFILE

Being an intermediate of the plant, make execute all the field activity with the Standard SOPs and SMPs.

Constantly monitor process parameter with corrective actions.

Coordinate all the service depts. to the plant operation running smoothly.

Monitoring batch-wise consumption ratio of the chemicals as well as solvent standard norms.

Day to day production activities in shift, man power handling, maintenance shop floor, activities of workers of workers, production planning.

Operation of the unit as per SOP to meet downstream requirements & agreed ISO product specifications & optimizing operation

Loop checking during shut down, commissioning and start up

Preparation of equipment which handover for maintenance and co-ordination with mechanical dept.

Strict follow up of the safety and environmental rules.

Strict control of unsafe conditions and unsafe acts.

Hazard identification and risk assessment before the job. MENDETORY TRAINING UNDERGONE WITH RIL

NJTP (New joiner training program for 35 days.

Awareness of preparing vessels for vessel entry / maintenance.

One-day work permit workshop, awareness of cold, hot and confine space permit system.

I have also undergone training on Hazard Identification and Risk Assessment (HIRA) of various chemicals.

SAFETY

To ensure that the safety norms are adhered as per company standards.

Participate in HAZOP; PHA, Incident investigation & Root cause analysis coordinate with other disciplines.

Ensuring strict compliance with safety procedure, permit to work system.

Familiar with RESOP (Reliance Safety Observation Process). I.e. reporting unsafe act & unsafe condition.

Safety / Firefighting equipment in the section. Fire Extinguisher, Fire Hydrant, Fire monitor, F & G detection system, PPE’s, DMC (Detector Manual Call), Sprinkler system, Deluge system, FM-200 system for PIBs, Safety shower, Water gel blanket etc.

Familiar with portable safety instruments like LEL meter, O2 meter, SCBA set, Escape Set, Mini H2S responder etc.

Attending various trainings on safety: Classroom as well as on field.

Familiar with PSM (Process Safety Management) elements. ACHIEVEMENTS

Completion of “International Well Control Forum, (IWCF), Level-1 Programme”

Certificate of Appreciation for Significant contribution in achieving successful completion & flawless commissioning of “J3- DTA GASIFICATION COMLEX”, Reliance Industries Limited.

Certificate of Appreciation for significant assistance, dedication and vital role to successful commissioning and start of “Sulphur recovery Units”, Worley Parsons resource & energy & Reliance Industries Limited.

Summer internship on Well Services and Workover Services at ONGC Ankleshwar Asset(May-June- 2019)

EDUCATION

Year Institution & Board Degree / Certificate Performance 2018-20 UPES, Dehradun

M.tech(Petroleum

Engineering)

91.3%

2013 SVNIT, Surat

IntegratedM.Sc

/M.S(Indstrial Chemistry)

72.80 %

2008 P.K.DESAI Vidhyalay (GSEB) HSC (12

th

) 60.40 %

2006 P.K.DESAI Vidhyalay (GSEB) SSC (10

th

) 73.71 %

INTERNSHIPS

M.Tech in Petroleum Engineering (2018-20)

Company: - ONGC, Ankleshwar Asset

Designation: - Summer Internship

Duration: - 1 Months (May 2019 – June 2019)

Project Title: - Well Services

Integrated M.Sc /M. S (Industrial Chemistry)

Company: - Sumeet Industries Ltd

Designation: - Summer Internship

Duration: - 1 Months (June 2010 – July 2010)

Project Title: - Continuous Polymer Plant operations PROJECTS

M.Tech in Petroleum Engineering (2018-20)

Company: - Reliance Exploration & Production Ltd, CBM project, Shahdol, M.P Designation: - Dissertation (Major Project)

Duration: - 6 Months (Jan 2020 – May 2020)

Project Title: - Improved Pump off controlling for PC pumps in CBM wells

M.Tech in Petroleum Engineering (2018-20)

College: - University of Petroleum and Energy Studies, Dehradun Designation: - Minor Project

Project Title: - Experimental Investigation of PHPA/GO (polymer nanocomposite) for EOR

IntegratedM.Sc /M. S (Industrial Chemistry)

College: - S.V.National Institute of Technology, Surat Designation: - Major Project

Duration: - 4 Months (January 2013 – May 2013)

Project Title: - Novel Colorimetric sensor based on metal ion sensitivity and their detection PERSONAL DETAILS

Permanent Address:

23, Jamanananagar society

Behind SadhnaHospital,kim.

TA-olpad,DIS-surat

AT&PO-KIM 394110

Communication Address:

23, Jamananagar society, kim.

Behind sadhana hospital

TA-Olpad, DIS-Surat

AT&PO-Kim.

Gujarat-394110

Personal Details:

Date of Birth: 31

st

AUG, 1991

Merital status: Married.

Language known: English, Gujarati, Hindi.

Domicile: Gujarat

Computer literacy:

CMG (Reservoir modelling and Simulation)

Good working knowledge of Microsoft Office packages

Operating System: DOS, Windows

Package: MS Word, Excel, Power Point, MS Project.

Preparing Visio drawing of chemical process plants like BFD, PFD, P&ID. CTC & JOINING PERIOD

Expected CTC: -N.A.

Joining period: - As per Company Requirements

Enriched with my knowledge and experience along with above backgrounds. I am quite confident in shouldering higher responsibilities. Just not for a change but to make it a career in a dynamic organization, which takes care of growth of its employees. KAVAN A. BHATT



Contact this candidate