M.sc (Indus. Chemistry)/M.tech (Petroleum Engineering); M.tech (Petroleum engineering) from University of Petroleum and Energy Study (UPES), Dehradun. Having 4.8 year’s experience of worked as Field Executive in Reliance Industries Ltd in pre-commissioning & commissioning as well as plant operations of J3-Pet Coke Gasification project in OGBL plant (Off Side gasification Battery limit) in respective units SRU & SFU. Responsible, possesses strong technical skills and proficiency in computer applications.
CAREER OBJECTIVE
To achieve a challenging position in a dynamic and growth oriented industry where my technical, analytical and problem solving skills can be put in for optimizing process and production parameters, de-bottlenecking process problems, successful completion of projects. SUMMARY
Qualified Professional with total experience of 4.2 years of experience in pri-commissioning & commissioning activity and Plant operations of J3-Pet Coke Gasification project in SRU & SFU plants in Reliance Industry Ltd, Jamnagar Refinery Division.
Aim at producing optimum performance through teamwork while creating a work environment that encourages motivation.
WORK EXPERIENCE
Worked with Reliance Industries Ltd, Jamnagar-Gujarat, India for 4.2 years in SRU complex. It is producing capacity is 1650TPD and expanding to achieve world largest refinery & Gasification complex at single location. Technology supplier is FLOUR and LINDE along with process technology of Worley parson.
EQUIPMENTS HANDLED AND COMMISSIONING
Pigging and steaming of pipe lines
Operations of various Pumps and Blowers.
Centrifugal pump and compressors
Induced draft blower and Combustion air blower.
COMMISSIONIG ACTIVITY
Review of P&ID and ISOMETRIC drawing and GA drawing as per need.
Refractory Erection and Preservation.
Loop preparation for process lines.
Hydro test and Pneumatic test of piping and Spools.
Holiday test.
Flushing plan methods.
Steam blowing and chemical cleaning.
Charging of Hydrocarbon and Utilities.
Line Box up inspection etc.
PSSR Self check and Level 1&2.
EQUIPMENT ERECTION
Granulation drums- 44.4 t/hr. capacity
Reactors and Combustion air blower
Refractory dry out for reactors and Reaction furnace
Storage hoppers- 225tonnes working capacity
Storage tanks-4247 m
3
capacity
De super heaters
S&T exchanger
Cyclones
Filters
Various types of valve installations and Flare system
Column internal erection
INSTRUMENTATION
Loop checking of Piping Instruments as well as Equipment Instruments
Instrument Tag checking with PID and DCS as well as PLC
Simulation.
JOB PROFILE
Being an intermediate of the plant, make execute all the field activity with the Standard SOPs and SMPs.
Constantly monitor process parameter with corrective actions.
Coordinate all the service depts. to the plant operation running smoothly.
Monitoring batch-wise consumption ratio of the chemicals as well as solvent standard norms.
Day to day production activities in shift, man power handling, maintenance shop floor, activities of workers of workers, production planning.
Operation of the unit as per SOP to meet downstream requirements & agreed ISO product specifications & optimizing operation
Loop checking during shut down, commissioning and start up
Preparation of equipment which handover for maintenance and co-ordination with mechanical dept.
Strict follow up of the safety and environmental rules.
Strict control of unsafe conditions and unsafe acts.
Hazard identification and risk assessment before the job. MENDETORY TRAINING UNDERGONE WITH RIL
NJTP (New joiner training program for 35 days.
Awareness of preparing vessels for vessel entry / maintenance.
One-day work permit workshop, awareness of cold, hot and confine space permit system.
I have also undergone training on Hazard Identification and Risk Assessment (HIRA) of various chemicals.
SAFETY
To ensure that the safety norms are adhered as per company standards.
Participate in HAZOP; PHA, Incident investigation & Root cause analysis coordinate with other disciplines.
Ensuring strict compliance with safety procedure, permit to work system.
Familiar with RESOP (Reliance Safety Observation Process). I.e. reporting unsafe act & unsafe condition.
Safety / Firefighting equipment in the section. Fire Extinguisher, Fire Hydrant, Fire monitor, F & G detection system, PPE’s, DMC (Detector Manual Call), Sprinkler system, Deluge system, FM-200 system for PIBs, Safety shower, Water gel blanket etc.
Familiar with portable safety instruments like LEL meter, O2 meter, SCBA set, Escape Set, Mini H2S responder etc.
Attending various trainings on safety: Classroom as well as on field.
Familiar with PSM (Process Safety Management) elements. ACHIEVEMENTS
Completion of “International Well Control Forum, (IWCF), Level-1 Programme”
Certificate of Appreciation for Significant contribution in achieving successful completion & flawless commissioning of “J3- DTA GASIFICATION COMLEX”, Reliance Industries Limited.
Certificate of Appreciation for significant assistance, dedication and vital role to successful commissioning and start of “Sulphur recovery Units”, Worley Parsons resource & energy & Reliance Industries Limited.
Summer internship on Well Services and Workover Services at ONGC Ankleshwar Asset(May-June- 2019)
EDUCATION
Year Institution & Board Degree / Certificate Performance 2018-20 UPES, Dehradun
M.tech(Petroleum
Engineering)
91.3%
2013 SVNIT, Surat
IntegratedM.Sc
/M.S(Indstrial Chemistry)
72.80 %
2008 P.K.DESAI Vidhyalay (GSEB) HSC (12
th
) 60.40 %
2006 P.K.DESAI Vidhyalay (GSEB) SSC (10
th
) 73.71 %
INTERNSHIPS
M.Tech in Petroleum Engineering (2018-20)
Company: - ONGC, Ankleshwar Asset
Designation: - Summer Internship
Duration: - 1 Months (May 2019 – June 2019)
Project Title: - Well Services
Integrated M.Sc /M. S (Industrial Chemistry)
Company: - Sumeet Industries Ltd
Designation: - Summer Internship
Duration: - 1 Months (June 2010 – July 2010)
Project Title: - Continuous Polymer Plant operations PROJECTS
M.Tech in Petroleum Engineering (2018-20)
Company: - Reliance Exploration & Production Ltd, CBM project, Shahdol, M.P Designation: - Dissertation (Major Project)
Duration: - 6 Months (Jan 2020 – May 2020)
Project Title: - Improved Pump off controlling for PC pumps in CBM wells
M.Tech in Petroleum Engineering (2018-20)
College: - University of Petroleum and Energy Studies, Dehradun Designation: - Minor Project
Project Title: - Experimental Investigation of PHPA/GO (polymer nanocomposite) for EOR
IntegratedM.Sc /M. S (Industrial Chemistry)
College: - S.V.National Institute of Technology, Surat Designation: - Major Project
Duration: - 4 Months (January 2013 – May 2013)
Project Title: - Novel Colorimetric sensor based on metal ion sensitivity and their detection PERSONAL DETAILS
Permanent Address:
23, Jamanananagar society
Behind SadhnaHospital,kim.
TA-olpad,DIS-surat
AT&PO-KIM 394110
Communication Address:
23, Jamananagar society, kim.
Behind sadhana hospital
TA-Olpad, DIS-Surat
AT&PO-Kim.
Gujarat-394110
Personal Details:
Date of Birth: 31
st
AUG, 1991
Merital status: Married.
Language known: English, Gujarati, Hindi.
Domicile: Gujarat
Computer literacy:
CMG (Reservoir modelling and Simulation)
Good working knowledge of Microsoft Office packages
Operating System: DOS, Windows
Package: MS Word, Excel, Power Point, MS Project.
Preparing Visio drawing of chemical process plants like BFD, PFD, P&ID. CTC & JOINING PERIOD
Expected CTC: -N.A.
Joining period: - As per Company Requirements
Enriched with my knowledge and experience along with above backgrounds. I am quite confident in shouldering higher responsibilities. Just not for a change but to make it a career in a dynamic organization, which takes care of growth of its employees. KAVAN A. BHATT