QK
OBJECTIVE
To work for a company that will
allow me to expand and enhance
my skillsets in my profession.
Thus, allowing me to grow into a
professional that will be able to
help the company succeed.
SKILLS
Fundamentals Of Engineering
(FE/EIT)
Technical Writing
Wood & Masonry
Material Testing
Reinforced Concrete
Structural Analysis
Microsoft Suite
Vehicle Tracking AutoCAD
Sketch up
AutoCAD
AutoCAD Civil 3D
Autodesk Revit
Microsoft C++
Autodesk Inventor
SAP
LEED Green
EDUCATION
Tennessee State University
Major: Architectural Engineering
Concentration: Structural
Minor: Statistics
Graduation: May 8, 2016
QUINTIN KELLEY
8015 ALDERGLEN COURT CHARLOTTE, NC. 28215
EMAIL: adegj8@r.postjobfree.com CELL: 313-***-****
EXPERIENCE
April 2018 – June 2020
Hazen and Sawyer – Structural Designer
Prepare plan, profile, and alignment Structural, HVAC, Mechanical, and Electrical drawings for water, wastewater and storm water structures.
Prepare site plans, plans, sections, and details for water, wastewater and storm water facilities.
Ensure drawing compliance with company and client CAD standards.
Produce and manage drawing sets.
Assist other disciplines with drawings and coordinating. November 2016 – February 2018
HDR Maintenance Design Group – Facility Designer
Facility programming, report writing, site master planning, developing specifications and construction documents.
Selection, coordination and layout of various aspects of design.
Creating / using Building Information Modeling (BIM) to complete different levels of documents.
Submittal, shop drawing, and RFI review.
Conduct construction field observations and surveys. June 2016 – October 2016
Poole & Poole Architecture – Entry Architect
Draft and design structural and civil components such as Stairs, Enlarged Plans, Slab Plans, Elevator Plans, etc. in low rise high end apartment buildings on AutoCAD.
August 2015- May 2016
Research - Capstone Project: Design of a Vertical Farming Facility
Design and analyze the engineering components; lighting and Power, Structural/Civil, and Architecture to sustain the facility. May 2013 – August 2013
DTE Energy - Major Enterprise Project - Intern
Shadow senior project manager at various construction sites.
Generated Specification Documents including work packages for Work Place Transformation.
Identified project scalability on various construction project data based on due dates and difficulty of project.
August 2012 – May 2013
Research - Research Assistant
Designed and built model focused on sustainability of Seismic activity on buildings and bridges.
August 2011- May 2012
Research – Research Assistant
Analyze the structure, water flow, flood causes, and defective performance of the Cumberland River Dam for 2010 Flood