PRATHABAMURTHY SUNDARAVASAN
Contact: +91-822*******, email:*********@*****.***
* **** **,**** **/1,Mullai Nagar,Madambakkam,Chennai -600126 CAREER OBJECTIVE
To be a part of organization where I can fully utilize the skills & make a significant contribution to the success of the employer and at the same time my individual growth. CORE COMPETENCIES
Utility & Mechanical system operation & maintenance, Planning, Project management, PROFESSIONAL EXPERIENCE
Organization Designation Duration
Siltronic silicon wafer Pte
ltd,Singapore
Facility
Manager&
maintenance
head
Jan 2014 to Till Nov 2019
TDK- Epcos Pte ltd, Singapore Asst.Manager(M
echanical
&HVAC)
March 2012 to Jan 2014
Applied materials south East Asia
Pte ltd. (CPS),Singapore
Mechanical
HVAC Senior
Engineer II
Jan 2009 to Mar 2012
Photonics (s) Pte Ltd, Singapore HVAC Engineer Dec 1999 to Dec 2008 ACADAMIC QUALIFICATION
Qualification University/ Institution Year of Passing Score / Grade Diploma in Electrical
and Electronics
Engineering
State Board of Technical Education,
Muthiah polytechnic, India
1998 81%
First Class with
honors
Higher secondary
school
DGM Higher Secondary School, India 1995 82%
Secondary school DGM Higher Secondary School, India 1993 70% NTC 2(SET 2) –
Electrical
technology
ITE, Singapore 2006 PASS
NTC 3(SEC1) –
Electrical
Technology
ITE, Singapore 2005 PASS
PRATHABAMURTHY SUNDARAVASAN
Contact: +91-822*******, email:*********@*****.*** 2 Plot 14,Door 14/1,Mullai Nagar,Madambakkam,Chennai -600126 JOB SKILLS
Managed site responsibility for Semiconductor fab operation & maintenance of mechanical system including
HVAC system
Chilled water system 13/19OC, 7/13 OC and -5 OC, 0C.
Cooling tower system (Cross & counter flow)
Secondary cooling system (PCW, Etch cooling,Wire saw & Saturator cooling)
Hot water system (boilers, Energy recovery system & Heat pump)
Exhaust system (General, NOX scrubber, Acid scrubber & room exhaust
Air handling unit & Dry coil system, heat pipe and FCU system
Clean room operation (class 10 to 10000).
Dehumidifier system
Server room air-conditioning system (Data center)
CDA system
Clean dry air system (compressors, Refrigerant & desiccant dryers and N2 back up system)
Vacuum system
Process vacuum system
House vacuum system
Fire Protection system
sprinkler
Hose reel
FM200 suppression
Foam system
Building service & maintenance
To perform & inspection of Lift
Managed vendors ensuring service are delivered accordance with contract and agreed on standards as well as payment
Ensure compliance with all health and safety,environment,and risk management policies
Coordinated and managed operational support for moves,reconfiguration events,safety and onsite services
Manage the contractors & responsible for P&L related projects. Documentation skills
Overall –in –charge and ensure the projects smooth operation in compliance with safety procedures
Responsible for coaching,manage and developing the team
Ensure that maintenance are carried out by the functional team
Ensure the contractual KPI are met all the times PRATHABAMURTHY SUNDARAVASAN
Contact: +91-822*******, email:*********@*****.*** 3 Plot 14,Door 14/1,Mullai Nagar,Madambakkam,Chennai -600126
Risk assessment
Setup/prepare preventive maintenance to trigger in SAP
Maintain records (System preventive maintenance, vendor reports, legal compliance from authority,project file )
Monthly reports.
EHS documents related to projects & area work permits
Crate new parts number and documents to create warehouse stock
To conduct FMEA training to create awareness to dept. Projects and Achievements:
Erection & commissioning of centrifugal compressor IR CENTAC C700 (5400CMH)
Performance qualification of Atlascopco centrifugal ZH710+ (6329CHM) & Energy recovery ER900
Installation qualification of Desiccant Dryer (Zero purge absorption (Model VEHDD, 8000CMH with -55C dew point)
Operation qualification of CDA Desiccant Dryer (BD 3000 +heated zero purge PDP-40, 8000CMH).
Energy saving with 600KW/Yr. in Heat pump system of additional COP <3.5
Operation & Maintenance of hot water system at 75C & 65C
Lead the development & management of facilities plan & forecasts with corporate goals & objectives.
Replacement of Low temperature chiller with additional energy saving with 190KW by using exiting motor (RT1730 to RT1900).
Energy saving & design changes in air cooled glycol chiller water to water cooled glycol chiller with 240KW/yr.
Changes of Insurance requirement to NFPA standard sprinkler tank with additional capacity of 160m3 ~ 346m3
Installation & maintenance of Hydraulic passenger / cargo lift.
Upgrade with new version of elevator lift in admin building.
Manage and complete all document related procedure for audit.
Involved in tools-move in, utility hook up and LSS testing. Energy savings projects
Heat load energy saving in PCW system from 25C to 33C, saving/yr ~ 900KW
Design with 240KW energy saving in heat recovery system.
Adding FRIGAID in Centrifugal chiller evaporator with electrical consumption of 50KW/unit.
Implementation with hi-flow fan fiber glass blades for Induced draft cooling tower, electrical energy reduced 158KW
Implement centrifugal compressors & centralized control system (ES16) for compressor operation, it reduces electrical (130KW to 350KW) consumption approximately, reflects in cost.
PRATHABAMURTHY SUNDARAVASAN
Contact: +91-822*******, email:*********@*****.*** 4 Plot 14,Door 14/1,Mullai Nagar,Madambakkam,Chennai -600126
Operation changes from manual to auto, using ES16 controller sequence of CDA start/stop with stable pressure, saving in electrical load at 250KW. SG References