MOHAMED AHMED EMIRA
: **************@*****.***
: Jeddah-Saudi Arabia
SUMMARY
I have 13 years of collective
experience in projects as well as
operation & maintenance effective
daily leadership and administration
of engineering team for Data
Center Facilities.
COURSES
Certified Data Centre
Facilities Operation
Manager (CDFOM)
Certificate no. 6263264.20763656
Certified Project Manager
Professional (PMP® -PMI)
Certificate no. 2785931
Certified Basic Fire
Fighting Certificate no. AS0005118
Certified Basic First Aid
and CPR Certificate no. AS0005114
ONGONING COURSES
Certified Data Centre
Professional (CDCP)
WORK EXPERIENCE
Data Center Facility Operation Manager Jan. 2016 – Present Mobily Data Center Jeddah – Through (MMR) - The Data Center Certified TIER III TCDD, TCCF and TCOS
Manage and supervise all maintenance staff engineers, technicians and other in- house team plus outsourcing vendors for total facilit y management of data center.
Manage the installation inside white space area at data center to control capacity management including power, cooling & space du ring approval of any new EIR using DCIM system.
Manage and control new installation inside white space to be matc hed with the DC standard & procedures and to maintain safety & security.
Manage, update and check daily, weekly & monthly reports as requ ired for upstream and downstream stakeholders.
Manage and control any incident happened and to follow escalation matrix procedures and submit all incident reports and share lesson s learned from the incident.
Manage and supervise all tasks for data center to achieve KPI.
Manage and control any CM ticket to be done within SLA.
Create, utilize and administer MOPs, SOPs& EOPs for all work in data center facilities and equipment.
Monitoring data center facility through BMS/Site scan and to be updated from NOC continuously.
Oversee preventive maintenance and continuous operation for all b uilding systems ; Electrical systems like ( UPS, Rectifier, ATS, PPC, Batteries and LV panels)
Mechanical systems like (CRAH, Chillers, FCU, Fans, Pumps, FAHU, DX units and Fuel system) Fire detection & suppression ( FM200, Foam & water firefighting) Security systems (CCTV & Access control) and others like Generators, BMS, Lightening, Lea k detection cables for water/hydrocarbon, Water softener, Chemi cal dosing in addition to Civil works and other issues related to th e facilities plus managing and control the cost.
Attend and perform factory test and on site testing & commissioni ng for a new Data Centre equipment with the contractor/supplier for hand over and acceptance.
Manage and supervise DC upgrade project to Tier 3 and to achieve uptime certification for design, facility and operation. MOHAMED AHMED EMIRA
Certified Data Centre
Specialist (CDCS)
Accredited Tier
designer/Specialist
(ATD/ATS) Uptime
institute(self-study)
EDUCATION
B.Sc. in Electrical Engineering,
Faculty of Engineering Tanta
University, Tanta, Egypt, 2007
PERSONAL DATA
Date of Birth: 14/7/1985
Nationality: Egyptian
Marital Status: Married
Visa residence, Iqama: Transferable
COMPUTER SKILLS
Internet
Microsoft Office
Windows
PERSONAL SKILLS
Team Work
Time Management
Leadership
Communication
Troubleshooting
Self-learning
Managing data center documentation creation, approvals, updates, accuracy of data record, policies, requirements and procedure compliance.
Work with business team sales and marketing to develop collocation services for public customers: DC detail demonstration to new customer during DC visit.
Provide training that covers equipment, techniques and procedures of data center facilities for the whole staff.
Senior Data Center Operation Engineer Apr. 2014 – Jan. 2016 Mobily Data Center Jeddah/Unaizah - Through (MMR) - Midis Group.
Operation and Maintenance for electrical & mechanical equipment.
Using CAFM by IMSWARE software to record and arrange all PPM and CM tickets to be on the system.
Ensure all maintenance activities are performed in accordance with approved MOPs and SOPs & EOPs.
Documents facilities maintenance requirements and maintain appr opriate record of work performed.
Calculate and approve power consumption for any EIR (Equipmen t Installation Request).
Senior Engineer / Project Coordinator May 2013 – Apr. 2014 STC & Zain Projects with ZTE & Ericsson through Alex mar Co.
Supervise for all maintenance electromechanical and telecom teams engineers & technicians for the whole area which total staff about
(50 Persons).
Follow up for all Power/Telecom TT in the area to be finished within SLA.
Control TT Time with my teams for GSM and core sites.
Monitoring for the operational processes.
Create the progress and status reports.
Increase the customer satisfactions.
Coordinates interactions and communication between the all teams with the stakeholders.
Supervise for all PM and ensure that PMR submitted on time.
Coordinates all requirements for all teams.
Work on ZTE MW link (NR8120, NR8250) & BTS (ZXSDR8800).
Perform PAT and checked for all quality issues to be cleared. MOHAMED AHMED EMIRA
OBJECTIVE
Joining an organization that would
provide me an opportunity to
establish recognizable career on
both personal and professional
levels, where my technical skills in
Data Centre can be fully enhanced
and utilized, which I am certified
data center facility operation
manager responsible for the
operational management and
effective daily leadership and
administration of the engineering
team with the objectives of safety,
efficiently, and effectively
operating machinery and systems in
a cost-effective manner.
I have 13 years of collective
experience in projects as well as
operation & maintenance
engineering. Possesses in-depth
understanding of technical &
functional specifications, and
highly adept at designing,
developing, testing, troubleshooting
and debugging of applications. Has
hands-on experience in handling
operation & maintenance of diverse
equipment, technical support &
troubleshooting.
LANGUAGE SKILLS
Arabic
English
LIFE PHILISOPHY
Hard work beats luck
Senior Engineer Feb. 2012 – Feb. 2013
Mobily & STC Projects with Alcatel & NEC through ERA Co.
Installation for telecom equipment 2G&3G sites and integration.
Installation & Commissioning for MW Link and make alignment f or MPR link in northern area with all types SD & XPIC.
Performing the MW upgrade (Alcatel) from AWY/UX to MPR w ith transfer traffic in the eastern area with its all types 0.3, 0.6.1.2, 1
.8, 2.4 M.
Commissioning for the MW link IPASO link NEC.
Making Transmission routing (software cross connection & hardw are) and make troubleshooting for it.
Performing new sites, swap BTS, Expansion and acceptance.
Technical Support Engineer Apr. 2010 – Jan. 2012 Mobily & STC & Zain Projects with Huawei through ALKAN KSA Co. Vodafone Projects with Huawei through ALKAN Egypt Co.
Supervisor for all teams in the area in the projects ( BSS & MW )
Installation for equipment 2G&3G sites and integration.
Installation and Commissioning for MW link (RTN 910,950).
Perform Transmission routing and make troubleshooting for it.
Installation for WIMAX – LTE projects.
Technical Support Engineer Sep. 2008 – Feb. 2010 Mobily & Zain Projects with Alcatel & Motorola through ALTYAR Co.
Installation & Commissioning the microwave links.
Making microwave links Upgrade for Alcatel from UX to awy32 Et hernet.
Making sweep test for the feeders using: Anritsu site Master.
Installing for equipment indoor & outdoor in Telecom site.
Supervising a working staff in the installation for Roof Top sites.
My duty includes RF, microwave links, earth and power.
Performing civil sites and aware of all issues
Coordinating our work between (Telecom & civil) projects.
Field Engineer Aug. 2007 – Aug. 2008
Vodafone & Etisalat Projects with Ericsson & Siemens through SMART Co.
Construction & RF installation for GSM sites with its different ty pes including (roof top, mast, monopole &Greenfield).
Shelter construction (MOG) shelter.
Air-conditions installation in shelters.
RF installation for feeders (1/2, 7/8, 1, 1 5/8) inches.
Sweep test for the antennas and feeders for the GSM sites
Performing earth test for all the constructional different types.