Post Job Free

Resume

Sign in

Welding Engineer

Location:
Chandigarh, Chandigarh capital, India
Posted:
August 05, 2020

Contact this candidate

Resume:

ANAND KUMAR RAY

SEC-**a Ludhiana Punjab, ****** +91-988*******/828-***-**** ade4ac@r.postjobfree.com

Objective

To work in a good company by seeking a good position in it and contribute in development of it by acquiring knowledge with experience and exploring my ideas and also improve myself.

Profile Summary

2 years of experience as a QA QC Welding Engineer at Perfect Group. B.E. in Mechanical Engineering specialization in Welding Technology from Sant Longowal institute of Engineering & Technology (S.L.I.E.T.) in 2018. Diploma in Mechanical (Industrial& Production) from S.L.I.E.T. in 2015. CATIA/Solid works (Designing). Robotic welding and their onsite Programming.

Work Experience & Training

Working as Welding Engineer at Perfect Incorporation, Ludhiana (Leading manufacturer and exporters of scaffoldings) from July 2018 and having following responsibilities: -

Have overall responsibilities for coordination of all welding and welding related activities.

Preparation and qualification of Welding procedures, welders and welding operators.

Improving Welding productivity by identifying the critical points and removing major bottlenecks.

Onsite Programming of Welding Robots (MIG/MAG) (Panasonic, ABB, Fanuc).

Perform Internal and external Welding Audits.

In process inspection and report preparation.

Destructive fracture testing.

Welding of New Sample.

Maintenance and calibration of welding machine on regular basis.

·7 weeks Training at CTTC (central tool room and training center) Bhubaneshwar in June 2017.

·4 Weeks training of CATIA V5 designing Software at CTTC Bhubaneshwar in June 2017.

·7 Weeks training at Nissan Motors Pvt. Ltd, Chennai India in June 2014.

SKILLS

·WPS, WPQR, WQTC, RWT and related welding Documentation.

·DT and NDT testing (microscopic, Visual, Bend, Tensile etc.).

·Manual and Robotic Welding programming and parameters setting.

·CATIA V5 designing.

·Penetration and Fracture Testing.

·Development of New SPM welding machine.

·Welding Processes like SMAW, MIG, TIG, MAG, SAW, FCAW, Butt welding etc.

·5-S implementation.

·Kaizen, Poka Yoke, industry 4.0, TPM etc.

Project work

PROJECT TITLE

DESCRIPTION

Improvising the productivity of Robotic welding operation (Perfect Inc.)

This project is about to increase productivity of welding robots in terms of production output by stabilizing heat input and weld travel speed, quality products, Poka-Yoke system (making use of operating panel) etc.

Horizontal and vertical SPM for round Welding and Intermittent Welding (from May 2019 Perfect Inc.)

SPM help in improving Production 4 times from Manual welding Process. It saves time and manpower. Direct final of component without tacking increases productivity.

Effect of Welding parameters on TIG Welding of Aluminum Plate (S.L.I.E.T. Longowal)

This project is about how to achieve Better Welding Quality using Welding variables like Current, Voltage; Gas Flow, Wire Stick-out, Welding Speed Etc.

Homemade Sensible Air Cooler

This Project is about to reduce cost and electricity of Air Cooling

System for General purpose use, by using a table fan Copper tube,

Cold water, insulated water tank and pump.

Education

B.E in Mechanical engineering Specialization in Welding Technology from Sant Longowal Institute of Engineering & Technology With 7.49 CGPA in 2018.

Diploma in Mechanical (Industrial & Production) From Sant Longowal Institute of engineering & Technology with 71.64 % in 2015.

Certificate in Air Condition and Refrigeration from Sant Longowal Institute of Engineering & Technology with 76.97% in 2013.

Area of Interest

Welding of Automobile, Scaffolding, Pipe, pressure vessel, boiler and structural fabrication.

Robotics and automation

Manufacturing & Metallurgy

Designing

Software proficiency

Operating System : Window Professional, XP, Vista, 7, 8, 10 etc.

Office suite : MS Word, MS Excel, MS PowerPoint



Contact this candidate