* ** * * * g e
ALI AHMED ABDULLAH
ELECTRICAL ENGINEER
B.E, MMUP/UPDA,LEAD QMS ISO 9001
QID Transferable Visa, Doha, QATAR
MOBILE:
EMAIL:
***********@*****.***
PROJECTS
1. QPD CLUSTER HIGH RISE
CLIENT: QATAR PETROLEUM
DOHA, QATAR
2. DOHA GOLD LINE METRO-SQW & SPC
CLIENT: QATAR RAIL
DOHA, QATAR
3. CHENNAI METRO
CLIENT: M/S CMRL
CHENNAI, INDIA
4. PRANNA RESORT
CLIENT: M/S AGHL
CHENNAI, INDIA
5. BOSCH SIEMENS INDIA PRIVATE
LIMITED
CLIENT: M/S BOSCH
CHENNAI, INDIA
6. BOSCH INDIA PRIVATE LIMITED
CLIENT: M/S BOSCH
CHENNAI, INDIA
7. DAIMLER INDIA COMMERCIAL VEHICLE
LIMITED
CLIENT: M/S DAIMLER
CHENNAI, INDIA
8. NEMAK ALUMINIUM CASTING
CLIENT: M/S NEMAK
CHENNAI, INDIA
WORK EXPERIENCE
9 Years of Experience in the MEP Construction Field For Electrical/ELV Works includes the LV/HV Electrical, Fire Alarm System, BMS, ICT, CCTV, Access Control
System etc. Having Sound Knowledge for the Local and International Standards Of QCS, NFPA, NEC,
KAHRAMAA.
Traggs Engineering W.L.L –An ENSRV Holding Group
[PROJECT ENIGNEER]
[Apr 2019]–[Present]
ALYSJ JV-Gold Line Metro
[QA/QC ]
[Jan 2017]–[Mar 2019]
ETA Engineering Private Limited
[ELECTRICAL ENIGNEER]
[Jul 2011]–[Jan 2017]
SKILLS
Excellent exposure in Installation and Testing of Power Distribution Facilities, LV & HV Power
Transformers from 33 Kv to 11 Kv,11kv to 433 v
630 KvA,11Kv to 415v 800KvA
2 of 5 P a g e
EDUCATIONALS & TECHNICAL
COURSES
1. B.E (BACHELOR OF ELECTRICAL
& ELECTRONICAL ENGINEERING)
FROM ANNA UNIVERSITY INDIA.
2. PROFESSIONAL PLC & SCADA
3. PROJECT MANAGEMENT
PRIMEVERA P6 ORACLE
SOFTWARE EXPERTISE
1. MS OFFICE
2. ACONEX
3. AUTOCAD
4. PLC SIEMENS
5. WINDOWS OS
6. SAP
PERSONAL PROFILE
AGE : 30 YEARS
NATIONALITY: INDIAN
MARITAL STATUS: MARRIED
LANGUAGES: BASIC ARABIC &
FRENCH, ENGLISH, URDU, TAMIL
WORKED AT SOME
Excellent exposure Installation and Testing of LV
& HV Dry type Transformer.
Excellent exposure in Installation of LV & HV
Control Gear, Lighting Panel and Distribution
Panel Board.
Excellent exposure in Installation and Testing of UPS and Stationary DC System and HVAC
Electrical System.
Excellent exposure in Installation of Bus duct
and BBT.
Excellent exposure in Installation and Testing of Grounding and Lightning Protection System.
Excellent exposure in Installation and Testing of LV & HV Cables and LV & HV Motors.
Exposure to Dimmer, Automatic Lighting and
Sensors.
Exposure to the ELV Systems Like Fire alarm
,FM 200,Security Access & Data System.
Exposure to Spec. like NEC, IEC, NEMA, ASME&
NFPA.
Well Knowledge about Hazardous Area
Classification like IP Rating, Explosion Proof
Rating (Exd, Exe, Exi), Temperature Class, NEMA
Rating.
Traggs Engineering W.L.L –An ENSRV Holding Group
[PROJECT ENIGNEER]
Roles and Responsibilities:
Preparation of Material Approval Submittal & Drawing Approval Submittal.
Preparation of BOQ and Cost Control analysis for the Entire project.
Handling both the Electrical & ELV System of the Project.
Preparation of the Project detail analysis based on the specification of the project .
Perform quality engineering review of design documentation for compliance with stated requirements, including vendor quality manuals and company quality records
Preparation of Project planning in primavera from start to end
& monitoring its daily status to make sure the project in gain path .
Preparation of Equipment details for the DB, Panels, Light fittings & Power sockets .
Ensure that all electrical site activities are conducted under 3 of 5 P a g e
ICONIC
PROJECTSN
controlled conditions as per approved GFC drawings, Method of Statements and Procedure, Specifications and International Standards.
Installation of Equipments and Power and Control Cables
,Grounding and Lightning Protection system,LV & HV Switchgear and It’s accessories, and It’s assembled parts, NGR, LV & HV Control-Gear Panel, Lighting Panel, Distribution Panel board, UPS and Stationary DC System, APFCR Panel, AMF Panel, LV & HV Motors, HVAC Panel, Lighting Fixtures and LV & HV Power Cables & It’s accessories like HV Termination- KIT, 3M-Cold Shrink Process Splicing Kit as per the project specification and QCS Specification.
Performed of Testing and Pre-Commissioning of LV & HV Power Cables, Grounding and Lightning Protection system, LV
& HV Control gear panel, Lighting Panel, Distribution Panel board, UPS & Stationary DC system, Annunciator Panel, Load Shedding Panel, LV & HV Motors, and Lighting Fixture as per the project requirements and vendor instruction manuals.
Checking the Quality of the work for the FM 200 & MEP System based on the NFPA and QCS Standard.
Preparation of the Quality Report for the Room Integrity Test.
Preparation of the QMS Report.
Maintaining the QCS Standard in the Project.
Witness Pre-commissioning for Energization and Testing.
Documents data obtained during all quality activities consistent with clients and company policies and procedures.
Participate in solving quality issues which been issued by client and coordinating to Engineering and Vendor regarding technical issue related to execution of work and material as per schedule.
Review and update Inspection Test Plan and Inspection Checklist as per Project Specification requirements for submission to client.
Prepares reports to communicate involvement and results of quality activities.
ALYSJ JV-Gold Line Metro
[QA/QC ]
[Jan 2017]–[Mar 2019]
Roles and Responsibilities:
Perform quality engineering review of design documentation for compliance with stated requirements, including vendor quality manuals and company quality records
Preparation of Project planning in primavera from start to end
& monitoring its daily status to make sure the project in gain path .
Preparation of Equipment details for the DB,Panels,Light fittings & Power sockets .
4 of 5 P a g e
Ensure that all electrical site activities are conducted under controlled conditions as per approved GFC drawings, Method of Statements and Procedure, Specifications and International Standards.
Checking the Quality of the work for the FM 200 & MEP System based on the NFPA and QCS Standard.
Preparation of the Quality Report for the Room Integrity Test.
Preparation of the QMS Report.
Maintaining the QCS Standard in the Project.
Preparation of IRP and IRE Document for the Project.
Witness Pre-commissioning for Energization and Testing.
Documents data obtained during all quality activities consistent with clients and company policies and procedures.
Participate in solving quality issues which been issued by client and coordinating to Engineering and Vendor regarding technical issue related to execution of work and material as per schedule.
Review and update Inspection Test Plan and Inspection Checklist as per Project Specification requirements for submission to client.
Prepares reports to communicate involvement and results of quality activities.
ETA Engineering Private Limited
[ELECTRICAL ENIGNEER]
[Jul 2011]–[Jan 2017]
Roles and Responsibilities:
Perform quality engineering review of design documentation for compliance with stated requirements, including vendor quality manuals and company quality records
Preparation of Project planning in primavera from start to end
& monitoring its daily status to make sure the project in gain path .
Preparation of Equipment details for the DB,Panels,Light fittings & Power sockets .
Ensure that all electrical site activities are conducted under controlled conditions as per approved GFC drawings, Method of Statements and Procedure, Specifications and International Standards.
Performed the installation inspection of primary & secondary electrical and instruments cables, Cable dressing, Glanding& Termination at Instrument, Control Panel Side.
Performed Witness Inspection of Testing and Pre- Commissioning of LV & HV Power Cables, Grounding System, Distribution Panel board and Lighting Fixture as per the project requirements and vendor instruction manuals.
Performed witness inspection of Functional Test and Manual Simulation test of Distribution Panel and MCP.
Installation of the fire alarm cabling for the entire station & 5 of 5 P a g e
QATA
R
Panel,Detector Installation
Testing & commissioning of the Detectors and checking of the Circuit & attending the fault arises in the Fire alarm System.
.
ORK
PROJECT SUMMARY
E D AT SOME ICONIC PROJECTS IQ
QPD CLUSTER C PROJECT
Towers -3 Floors-76
West Bay, Doha, Qatar
Position : Project Engineer
Client : Qatar Petroleum
Consultant : AEB Consultancy
Main Contractor : Al Balagh Contracting
MEP Contractor : Traggs Engineering Private Limited Project Value :96 Millions (QAR)
Project Description:
This Cluster Tower is a high rise project that consists of basements level, a ground floor,a Podium floor
and 76 floors with a total built up area of 59597
square metres.Its a fast paced project with minimum duration of completion.
ALYSJ JV Gold Line Metro,
Under ground Tunnel & Stations
Souq Waqif & Sports City Qatar.
Client : QATAR RAIL
Position : QA/QC
Consultant : Louis Berger (WSP) & QPM
Main Contractor : ALYSJ JV
Project Value :6 Billion(QAR)
Project Description:
This projects is one of the main epicenter of Qatar connecting from the Al Aziziyah to Ras bu aboud,Gold line metro also entered in the Guiness Book of
Records for the completion of Tunneling. It is
constructed on a stretch of 32 Km The project
covers the construction of 10 Stations Including the Tunneling works for the Under Ground. In addition to 6 of 5 P a g e
that, there is a huge stapling yard in the Ras Bu
aboud for the Trains.
GuinessLink:https://www.tunnel-
online.info/en/artikel/tunnel__2680506.html
Chennai Metro Rail,
Under ground Tunnel & Stations
Kilpauk,Nehru Park & Pachaiappa-India.
Client : QATAR RAIL
Position : Project Engineer
Consultant : Louis Berger (WSP) & QPM
Main Contractor : ALYSJ JV
Project Value :4 Billion(INR)
Project Description:
This Project is the first for metro in Chennai covering around 10 Kms.It includes both station & Tunnel. It is third largest metro in India.
PRANNA RESORT (ICC HOTEL)
.
Client : AGHL
Position : Project Engineer
Consultant : SWEET
Main Contractor : ETA Engineering Private Limted
Project Value : 130 Million(INR)
Project Description:
With a total built up area of more than 5666 square meters. ICC hotel has a total of 96 rooms and 15
furnished Viilas for AGHL. It will also offer
international restaurants. Other special features
include a Spa, bar lounge, meeting rooms, a gym a
ball room and a swimming pool. Its third largest at that time in Asia.
7 of 5 P a g e
BOSCH SIEMENS INDIA PRIVATE LIMITED,
Chennai-INDIA.
Client : BOSCH SIEMENS
Position : Project Engineer
Consultant : FABS
Main Contractor : ETA Engineering
Project Value :90 Million(INR)
Project Description:
This Project is an collaboration of Bosch & Siemens first plant in South India for home appliances.
This projects was constructed on 2650 Acres of land with includes R & D Office, Admin, ITC, Assembly
points and Data hub.It includes of 800 Kva
Transformer 4 Nos,.It also Includes street lights at 15 KM Coverage and High Mast of 50 Mtrs.
BOSCH INDIA PRIVATE LIMITED
Chennai-INDIA.
Client : BOSCH SIEMENS
Position : Project Engineer
Consultant : FABS
Main Contractor : ETA Engineering
Project Value :90 Million(INR)
Project Description:
With a total built up area of more than 5666 square meters. It includes the R & D Office, Admin, ITC,
Assembly points and Data hub.It includes of 800
Kva Transformer 2Nos,1250 KVA Transformer,HT
DG.It also Includes street lights at 15 KM Coverage. 8 of 5 P a g e
DAIMLER INDIA COMMENRCIAL VEHICLES LIMITED,
Chennai-India..
Client : DAIMLER
Position : Project Engineer
Consultant : FABS
Main Contractor : ETA ENGINEERING
Project Value :138 Million(INR)
Project Description:
This Project is German Auto Giant Automobiles
Manufacturing and Assembly point Covering a huge
area of More 2500 Acres of Land. It includes
Substation 8 nos with One Main RMG Point.It also
Includes RDPS,R&D,ITC,Admin,Huge Canteen capable
of Accommodating around 1500 Nos in one slot. It
includes Street Light of about 25 Km and cable Rack to carry out the HT Cables. It also includes 6
Stepdown Transformer.
NEMAK ALUMINIUM CASTING INDIA PRIVATE LIMITED,
Chennai-India.
Client : M/S FORD
Position : Graduate Engineer Trainee
Consultant : CR Consultant
Main Contractor : ETA ENGINEERING
Project Value : 40 Million (INR)
Project Description:
This project is an extension of the Ford Plant which acts as an assembly point for the FORD Vehicle.Its an industrial type plant consists Huge warehouse and
Power plant area for the Warehouse.Its consists of R&D Segment and Innovative Segment covering an
area 0f 2000 Acres of Land.