To secure a challenging position a leading company, where I can utilize my skill as a Document Controller/PTW Coordinator/Punch list and RFI controller effectively and be an integral part of the company.

Experience

I am an experienced Document Controller/PTW coordinator having more than fifteen years of work experience as Project Document Controller and PTW coordinator.

More than 15 years’ experience with GS Engineering & Construction [750 MW Power Plant in Sohar 2 IPP] and Doosan Heavy Industries & Constructions Co. Ltd an EPC Contractor for [ 635 MW Power and 33 MIGD MSF Desalination Project at Sohar in Sultanate of Oman] & [735 MW Power and 26.4 MIGD R.O Desalination Project at Barka in Sultanate of Oman] and Sohar Refinery Improvement Project in Petrofac International LTD, Mechanical piping work & Pre-commissioning mechanical work in LPIC (Orpic) in SIM Randridge s.r.l (OHI group) .

My basic function consists of managing all technical documents & Corresponds (letter, Email) for the projects. Distributing documents, and ensuring accuracy revision of all documentation. Ensuring regulatory procedures and changes are followed is also an essential part of my job junction. I have strong experience in maintaining entire QC & Engineering documents such as MS, QCP, ITP, WPS, PQR,ECC.CCC, Drawings, and can effectively track the status of all Inspection records of any large construction project

Permit to Work Coordinator for Construction, Commissioning and Operation, responsible for the Coordination of the Bridging work permit.

Encoding all work permits in the PTW Tracking Data Base. Make sure isolations certificates, confined space, hot work, RT, work at height are cross referenced to all active work permits that requires prevent conflicting activities with the construction, commissioning and operation.

My other skills being self-drafting ability for site correspondence work, keep record and distributing site correspondence, prepare and follow up purchase order.

1. Working Experience at Liwa Plastic Industrial Complex

Position Held : Planning & QC Document Controller.

Company : SIM Randridge Srl (OHI Group).

Client : ORPIC.

Project : Liwa Plastic Industrial Complex

Duration : From December 2018

1 A) Duties and Responsibilities

Maintaining and keeping records of all procedure, method statements, Job hazard analysis(JHA), Material approval (MAR), Site Technical Query (STQ) as electronically and hard copy.

Preparing, Maintaining LOG sheet and send to client (ORPIC) of Request for Inspection (RFI).

Maintaining and keeping records of all commissioning report, check sheet as electronically and hard copy.

Preparing, updating and keeping records of punch list.

Drafting, distributing, keeping record as hard & electronically for IN/Out correspondence.

Submitting and keeping record for Daily reports.

Submitting Keeping record of Test pack & PCP (Pipe cleaning procedure).

2. Working Experience at Sohar Refinery Improvement Project

Position Held : PTW Coordinator & Commissioning Document Controller.

Company : Petrofac International ltd.

Client : ORPIC.

Project : Sohar Refinery Improvement Project

Duration : From December 2015 to March 2018

2 A) Duties and Responsibilities

Coordinator of PTW application procedure.(to Preparation, apply, close and follow-up the PTW procedure).

Assure the compliance with all the permits requirements.

Coordinate with the Project HSE Supervisor for Day to Day activities.

Maintain and Control of Permit associated Mechanical/Electrical Isolation and de-isolation, confined space, hot work, Radiograph test, Grating removal activity form.

Coordination with Site Engineer, PTW Issuer and HSE manager related to all PTW protocol.

Maintaining and keeping records of all commissioning procedure, method statements, Job hazard analysis(JHA) as electronically and hard copy.

Preparing, Maintaining LOG sheet and send to client (ORPIC) of Request for Inspection (RFI).

Maintaining and keeping records of all commissioning report, check sheet as electronically and hard copy.

Preparing, updating and keeping records of punch list.

Preparing Livening up notice, keeping records and sends to client (ORPIC).

Preparing Daily reports and reporting to commissioning manager.

Preparing Vendor call out form and keeping records of Vendor personal time sheets, Vendor work report and details.

Maintain LOTO (Lock out Tag Out) procedure for all Subs-station and Related PTW Procedure.

3. Working Experience at Sohar 2 Power Plant Project (Warranty Period)

Position Held : Document Controller, PTW Applicant & Material Controller

Company : G.S Engineering & Construction Co. Ltd. & Siemens (Consortium)

Client : Al Batinah Power Company SAOC.

Project : Sohar 2 Independent Power Plant

Duration : From April 2013 to November 2015.

3 A) Duties and Responsibilities

Preparing site correspondence letter.

Incoming and outgoing correspondence letter, Meeting agenda, Emails keeping records and updating in TPMS (Server).

Responsible purchase and preparing purchase order for local and overseas.

Punch list updating and reporting to planning manager daily basis and weekly to Client.

Warranty claim Status updating & reporting planning manager daily basis and weekly to Client.

Material management (Preparing purchase order, invoices tracking logistics, stock maintain)

PTW Coordinator (Apply PTW as per site work, Giving safety induction and Tool Box Talk meeting to all supervisor and workers)

4. Working Experience at Sohar 2 Power Plant Project (Construction Period)

Position Held : QA/QC Document Controller

Company : G.S Engineering & Construction Co. Ltd. & Siemens (Consortium)

Client : Al Batinah Power Company SAOC.

Project : Sohar 2 Independent Power Plant

Duration : From December 2010 to March 2013

4 A) Duties and Responsibilities

Maintain the incoming and outgoing documentation for Project Team Management (PMT) using the company procedures and systems, by manually and electronically

Corresponding with the required personnel (Disciplines, Subcontractors and Client) for receipt of outstanding documents and following up and preparing document status reports periodically.

Handling all kind of construction documents such as Project Drawings and documents from GS & EC Head Office, Korea. And arranging to submit for each discipline (Engineering, QA/QC, Civil, Mech., and E&I depts.), Client & Sub-Contractors.

Preparing Weekly Document Submittal Status Reports for QA/QC Manager that has to be submitted to Clients.

Supervising data entry of technical documents in the company and ensure the correct revision and location of documents into their designated electronic folders & Uploading all Technical Data Such As (Method Statements, Field Quality Plan, WPS & PQR, Material Approval Sheet (MAS), Lifting Plan, Various Technical Procedures and Erection Clearance Certificate(ECC)) in TPMS GS & EC Head Office Server.

Keeping records all kind of Erection & Operation and Maintenance Manuals from Siemens Head Office, And arranging to submit for each discipline (Engineering, QA/QC, Mech, and E&I depts.) & Sub-Contractors.

Submitting to Client for approval after Receiving Technical Documents from Sub-Contractors such as (Method Statements, Field Quality Plan, WPS & PQR, Material Approval Sheet (MAS), Lifting Plan, Various Technical Procedures.

Working as reliever of Planning Document Controller.

Preparing & Controlling all incoming & out going letter & e-mail.

Preparing & updating weekly & monthly meeting agenda.

Working as Permit to Work(PTW) Holder/Applicant

Responsible to initiate PTW application process for various activities, identify suitable Permit-to-Work, liaise with concerned parties, ensure supporting documentation, site preparation and equipment inspection, follow-up for approval of Permit, ensure daily endorsement of permit-to-work from client Permit Controller, report about work nature and progress, obtain specific instructions, if any, and renewal of Permit-to-work post-expiry.

Conducting Tool Box Meeting on behalf of in-house HSE Department for prospective candidates including Engineers, Foremen and Workers

5. Working Experience at Barka Phase II Project (Warranty Period)

Position Held : QA/QC Document Controller & Work Permit Holder.

Company : Doosan Heavy Industries & Construction Co. Ltd.

Client : SMN Barka Power Company SAOC.

Project : Barka Phase II Power & Desalination Plant

Duration : From December 2009 to December 2010

5 A) Duties and Responsibilities

Authorizer for Permit to Work (PTW)

Warranty Notification,

i)Download & Register Warranty Notification received from Client

ii)Received Warranty Notification Providing to Concern Department.

iii)Warranty Notification updating in Server.

iv)Close Warranty Notification forward to Client and upload in server.

v)Apply Work Permit to Clearing Warranty Notification work.

Open Point Item,

i)Updating Open Point Item list.

ii)Apply Work permit to Clear Open Point Item.

iii)Cleared open point status handover to client weekly.

iv)Preparation of monthly invoice on cleared Open Point Item.

Daily Activities Report Preparation.

Collecting daily activates information from Mechanical, Electrical, Instrument & Administration Department for preparing daily & Weekly report.

Weekly Warranty Notification status preparation.

Weekly cleared Open Point Item Status preparation.

Providing Technical document during Warranty Period on individual department & client on request.

Document Scanning, creations of CD’s and file manipulation.

Updating Document Server.

Site Work Supervision.

Giving HSE instruction at site to work personnel.

6. Working Experience at Barka Phase II Project (Construction Period)

Position Held : QA/QC Document Controller.

Company : Doosan Heavy Industries & Construction Co. Ltd.

Client : SMN Barka Power Company SAOC.

Project : Barka Phase II Power & Desalination Plant

Duration : From December 2007 to November 2009

6.A ) Duties and Responsibilities

Registering of internal and external documents of project

Maintain document control registers / documents for incoming and outgoing project documents

Supervising data entry of technical documents in the company and ensure the correct revision and location of documents into their designated electronic folders.

Ensure all hard and electronic copy distribution of controlled documents to focal point.

Maintain documents for transmittal process for project documents

Expedite responses to transmittals sent for review/comment

Respond to queries regarding revision status of issued drawings / documents from engineering / drafting personnel

Receiving all relevant documents, and ensuring the technical documents are stored properly and creating efficient data storage/filing system. Developing and maintaining an up to date efficient systems.

Document Scanning, creations of CD’s and file manipulation

Consolidating and tracking the punch lists and Change Orders by coordinating each discipline (Civil, Mechanical, E&I and QC).

Filing and archiving of documentation to facilitate easy retrieval at a later date

Sending of Drawing Transmittals and Submittals

Ensuring that drawing transmittals are acknowledged in case there is a dispute on whether the drawings were transmitted

Updating Quality Assurances records.

Manage the document/drawing review process, Internal and External.

Responsible for Submission of Inspection & Test plan, Method Statement & Quality Test related Procedures to subcontractors & internal dept

Registering all material QA reports & shop inspection test report from vendor

7. Working Experience at Sohar Project ( Construction period)

Position Held : Document Controller.

Company : Doosan Heavy Industries & Construction Co. Ltd.

Client : Sohar Global Contracting & Construction Co. LLC.

Project : Sohar Power & Desalination Project.

Duration : From January 2005 to December 2007

7. A) Duties and Responsibilities

Printing, Plotting, Binding of Engineering Drawings & Document sent by Engineering Head office

Download & Upload drawing & document from Company backup centre

Submission of drawings, documents & specification to Client, Project Consultants, Subcontractors & Concerned field / project site personnel

Updating the records of revised Drawings & Documents

Co-ordinate with the Document Manager in reconciling records and files

System wise segregating of drawing & documents

Maintaining filing system of documents & letters

Handover final technical file related with Mechanical completion certificate, Performance Test, Acceptance Test Procedure, Operation & Maintenance Manual to Client

8. Working Experience at NIIT Ltd.(India)

Position Held : Jr. Faculty.

Company : Data Base Solutions Pvt. Ltd (License of NIIT Ltd.)

Duration : From March 2003 to May 2004

8. A) Duties and Responsibilities

Responsible for conducting classes for Ms-Office, Java, SQL & C++ etc

Setting the question papers for the academic qualification of the students

Responsible for library management, database management, transcriptions & Certification, maintaining the office software & hardware details

Conducting seminars relating to the software & hardware programs

Personal Profile

Date of Birth : 16th January 1980

Marital status : Married

Gender : Male

Nationality : Indian

Languages known : English, Hindi & Bengali

Present Address : Sohar, Sultanate Of Oman

: Mobile – 00968 - 92264659

Permanent Address : C/o- Abul Kasem Sarkar

: Post- Khanyan (East)

: Dist – Hooghly

: West Bengal.712157, India.

: Phone No +91-983*******

E-mail id : addcq8@r.postjobfree.com

Driving license : Valid Driving license in GCC country.

Working Visa : Valid Employment Visa (NOC Available)

Educational Qualification

Graduate in Bachelor of Arts, Burdwan University, West Bengal, India.

Quality Management course from NIIT.

Computer knowledge

Java, C++, Ms-Sql & Ms-Office.

2 years Computer Software Courses from NIIT Centre, Kolkata.

Passport Details

Passport number : K4630903

Place of Issue : Muscat (Sultanate of Oman)

Date of Issue : 06-10-2012

Date of Expiry : 05-10-2022

Shaikh Saifuddin Sarkar



Contact this candidate