Post Job Free

Resume

Sign in

Civil Engineer Manager

Location:
Fereej Ibn Dirhem, Qatar
Posted:
June 28, 2020

Contact this candidate

Resume:

taco-cv

VULTACO B. VALDEZ

Mobile Phone No. (Qatar): +974-********

Email Address : add5tx@r.postjobfree.com

Transferable Visa with NOC

With Valid Qatar Driving License

Position Desired : Civil/Site Engineer

CAREER HIGHLIGHTS :

Years in the field of construction and engineering. Have been employed on companies that specialized in Construction, Building Maintenance and Operations, Facility Management, Underground Electrical Cable Laying and other utility construction projects. Well organized and efficient, good communication skills, well verse in procedures and methods. Expert in resource planning and customer acceptance. EMPLOYMENT HISTORY:

Dec 2015

April 2020

KHALID ELECTRICAL & MECHANICAL CO.

Position: Project Engineer

Job Highlights:

• Well verse on procurement management

• A good team-management skills

• Scheduler and executioner of daily work to site engineers

• Determines project costs by calculating labor materials and related costs

• Prepares engineering documents as per construction specifications, plans and schedules

• Ability to sort out details with Kharamaa/clients

• Negotiate with Clients/Kharamaa and sub-contractors for any unforeseen technicalities

• Confirms adherence to construction specifications and safety standards by monitoring project progress and placements

• Specialized in Utility excavation supervision under heavy machineries, re- instatement and landscaping

• Perform a technical, organizational and supervisional role on construction projects, setting out and determining the location for above and underground infrastructural installations involved in construction operations Projects Handled:

• GTC/736D/2015 (Qatar Power Transmission System Expansion Phase 13- Cables) under Furukawa Electric Co. Ltd. (1 Route-400KV Cable)

• GTC/642D/2014 (Qatar Power Transmission System Expansion Phase 12- Cable) under Elsewedy Cables (14 Routes-132KV Cable Circuits)

• GTC/4501/2011 (Qatar Power Transmission System Expansion Phase 11- Cable) under National Contracting Company Limited (8 Routes-66KV Cable Circuits)

• China Harbour F-Ring road construction and utilities taco-cv

June 2014

Dec 2015

KHALID ELECTRICAL & MECHANICAL CO. (Maintenance Division) Position: Facility Manager

Job Highlights:

• Efficient and adaptable skills in Financial planning to make sure that the project is at profit.

• Good negotiation skills with clients and sub-contractors. Projects Handled:

• MAZAYA Compound at Al Gharaffa (76 Villas plus Amenities- 5 years contract)

• WOQOD Tower at West Bay (AHU Maintenance only- 2 years contract) Aug 5, 2013

June 2014

KHALID ELECTRICAL & MECHANICAL CO. (Civil Division) Position: Civil Engineer

Job Highlights:

• Handle construction packages like excavation, rebar, shuttering works, concrete.

• Prepare methods of statement for activities

• Follow up Construction Specification, Material Grade and Standards

• Make Estimates for procurement purpose

• Prepares feasibility study by analyzing the engineering design Projects Handled:

• KEMCO Labor Camp Construction(Abu Nakla)

• KEMCO Labor Camp & Garage Construction (Industrial Area St. 19)

• GASCO Labor Camp G+4 Construction (Industrial Area St. 36)

• KEMCO Labor Camp (Industrial Area St. 44) Renovation

• KEMCO Labor Camp (Industrial Area St. 41) Renovation July 10, 2011-

June 5, 2013

MASTOURA FOR TRADING AND CONTRACTING CO., LTD (K.S.A) Position: Civil Engineer/Inspector

Projects Handled:

• Field inspection of on-going construction for G+4 story buildings for government employees work at the commission.

• Field inspection of newly constructed facilitiese specially pre-cast structures

• Site Acceptance of newly constructed Building Apartments, Mosque, Schools, Recreational Facilities for Civil Works only

• Hand over sites directly to Royal Commission Bldg. Construction Department

• Handled estimating jobs for Royal Commission on going projects including restorations of facilities

Sept. 6, 2010-

May 31, 2011

WI-TRIBE PHILIPPINES (Philippines)

Position : Field Engineer

Projects Handled :

• 4G Rollout ProjectConstruction of Rooftop Cellsites, and site surveys Mar. 6, 2010-

Jun 4, 2010

NORCUNSULT TELEMATICS (Kuwait)

Position : Civil Engineer Inspector (Fiber Project) Projects Handled:

• Saudi Telecom Company. (VIVA) Rollout Project @ Kuwait taco-cv

Jun 15, 2009-

Jan 25, 2010

HAYAT Telecoms (Qatar)

Position : Senior Civil Engineer

Projects Handled:

• Vodafone Rollout Project at Qatar

Jun 28, 2008-

May 29, 2009

NORCUNSULT TELEMATICS (Kuwait)

Position : CIVIL WORKS INSPECTOR/ ACCEPTANCE ENGINEER Projects Handled:

• Saudi Telecom Company. (VIVA) Rollout Project @ Kuwait

- Construction of building facitlities, access roads and tower foundation and erection

Oct. 25, 2005-

Apr 8, 2008

AL OSAIS INTERNATIONAL HOLDING CO. (K.S.A)

Position : SENIOR CIVIL ENGINEER

The Company is engaged mainly in the construction of Telecom Infrastructure, includes building construction for base station, earth excavation, OSP and implementation of civil, electrical, tower erection & telecom works. Mostly, sites handled are in Rural areas that needs proper survey and construction of new access roads e.g. asphalt, concretes that includes topography. Job Highlights:

• Completed more than 400 cellsites (rooftop, Greenfield & co-location sites), from initial survey/design, building construction design to site hand-over

• Site Inspector for OSP works…seldom excavation and cable layouts

• Site visits and inspections to verify that the implementation is carried out according to the design and standards

• Tower inspector( from foundation, erection and verticality)

• Responsible in the set-up of the first in-house implementation works by the company, trained co-engineers & workers.

• Responsible in the topographic surveys

COMPANY : LINECOMM SERVICES INC. (Philippines)

Telecommunication Site Construction, Earth Moving Contractor, And Building Contractor

JOB DESCRIPTION:

• Project Engineer / Inspector (January 2002- October 2005) PROJECT INVOLVEMENT

BUILDING CONSTRUCTION PROJECTS

• Construction of two story residential/commercial building

• Construction of Olympic size swimming pool and kiddie pool

• Construction of Villa of company owner and its multi-function recreational facilities and motorpool

EARTH MOVING AND ROAD CONSTRUCTION/ BRIDGE CONSTRUCTION

• Supervise the Earth Excavation and Dredging of Agno River Stretch from Paniqui, Tarlac to Bayambang, Pangasinan for Flood Control Project

• Supervise Backfilling and Compaction as per Requirements of Proper Backfilling Materials and Conduct Test for Base Coarse Materials for the Rehabilitation of Agno River Dikes

taco-cv

TELECOMMUNICATION PROJECTS

Civil Works:

• Establishes work schedules and procedures.

• Verified sub-contractors accomplishments and coordinated to General contractor inspectors, and their reps. for clarification of issues.

• Supervise in tower erection.

Electrical Works:

• Take off materials and supervised installations for both electrical and grounding.

• Performed insulation resistance, voltage and earth resistance test prior to site acceptance test.

Site Acquisition Works:

• Prepare daily, weekly and monthly progress report of sites.

• Establishes documentation guidelines in the site acquisition. COMPANY : WELLTELL CORPORATION (Philippines)

Wire and Wireless Contactor

JOB DESCRIPTION

Project Engineer(January 2001to January 2002)

• Assist the manager in all matters of engineering, procurement and construction management of the project which includes project administration, project control, specific writing, tendering, award of contracts, purchases and coordination works with client and contactors.

• Responsible in project estimates and quotation for bidding.

• Also do office documents, administration and site record management, checking of contractor’s work of accomplishments, witnessed testing procedures and prepared compliance reports.

Civil Technician / Installer (January 2000 to December 2000)

• Responsible for electrical wiring installation, cable termination, cable trays and cable racks, air conditioning, and panel boards.

• Structured cabling : survey, layout of heliax cable and connectorization COMPANY : HUTAMA RSEA JO., INC. (Philippines)

Lead Contractor of Skyway Stage 1 in Magallanes

JOB DESCRIPTION

On the Job Trainee (OJT) -(January 1998 to June 1998)

• Assist the Project Engineer in inspection of rebar layouts, concrete pouring inspections and schedules, scaffoldings and formworks, procurement and actual testing procedures.

• Quantity take off and material estimates

OTHER SKILLS:

Computer Literate in Basic Office Programs:

MS Word, MS Excel, MS Project, Power Point, AutoCad etc. taco-cv

EDUCATIONAL BACKGROUND :

TERTIARY EDUCATION : Mapua Institute of Technology (April 1999) Muralla St., Intramuros, Manila

COURSE : Bachelor of Science in Civil Engineering

CHARACTER REFERENCES:

Mr. Mohamed Bin Hammam

Chairman

Khalid Electrical & Mechanical Co. W.l.l (KEMCO)

Mobilie # +974-********

Mr. Antonio Baculot Mr. Emad Ghandoor

Project Manager Project Director

Mastoura for Trading and Construction Co. Hayat Telecoms (Qatar) Mobile # +966-********* Mobile # +974-*******

Mr. Hugh Bramlett Mr. Baltazar Mendoza

Acceptance Manager Project Manager

Norconsult Telematics for VIVA Project Al Osais Holdings Inc. KSA Mobile # +965-******** Tel : +966-***-**-***



Contact this candidate