Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Bhubaneswar, Odisha, India
Posted:
June 23, 2020

Contact this candidate

Resume:

AJAY KUMAR DAS

Phone: +91-832******* E-mail:add0vc@r.postjobfree.com

Permanent address

C/o- Pradip Kumar Das

At- Qr No-C/109, Sector-22, Rourkela-

Po- Tangarpalli.

Dist- Sundergarh

Odisha

PIN- 769007

Career Objective

To select a career which, in tune with my aptitude and ability, a job that ensures me dignity, motivation, ambience and upward mobility. As an Engineer, my Endeavour would be to strive for perfection in any assignment I undertake. I’m looking for challenging opportunities in any organization, which provides me the above features and allows me to use my knowledge, implement my thinking that promotes growth, creativity and learning.

Academic Qualification

Institution Year of Passing Degree/Certificate Performance College of Engineering,

Bhubaneswar 2012

B.tech/ Mechanical

Engineering

65.9%

Ispat English Medium School,

sec-20, Rourkela, Odisha 2007 12th 64.83%

Ispat English Medium School,

sec-22, Rourkela, Odisha 2005 10th 75%

Work Experience

Present Employer: -

TATA PROJECTS LIMITED. DARLIPALI.

Designation: PLANNING & EXECUTION ENGINEER.

2X800 MW Super thermal power plant project at Darlipali, (Orissa):

Erection & commissioning of all Electrical CHP Packages handling.

Erection & commissioning of MV, LT Switchgear, DC System.

Interconnection cabling between switchgear to equipment’s.

Illumination system indoor & outdoor, street lighting, Cable laying and termination system.

Erection, cabling, installation for Electrical Hoist, Plough feeder, CSU, SM, ILMS, MD, Travelling Tipper.

Job Profile:

As per schedule Plan work completion & follow up with engg, vendor as well as customers.

Interacting and coordinating with field staff & Co-ordination with various departments related to the projects within the organization.

Erection/ Testing/ Commissioning/ of Various Electrical & Electronics Equipment’s in Thermal Power Plant specialized in CHP.

Responsible for contractor billing- MB booking in ERP, client billing, protocol submission with adherence to FQP.

Updating information and preparing reports. & preparing daily, monthly, yearly reports and presenting it to the management, responsible for material indent, consumption booking, and reconciliation statement.

Profile summary:

Organization & Leadership, Qualities.

Excellent Team player and Enthusiastic initiator.

Ability to learn fundamental concepts effectively & efficiently.

Strong leadership qualities coupled with excellent presentation and communication skills.

Dedicated and self-motivated to achieve the set objective and Very good analytical skills.

Ability to adapt to new environments and contribute significantly.

Site management with Infrastructure management & Co-ordination with site team. Co-ordination with Customer & Co-ordination with subcontractor. Reporting to project Head; all liaison activities & also trying to have people Management WORK INVOLVEMENT IN SEVERAL PROJECTS:-

2X800 MW super thermal power plant at LARA (RAIGARH). DESIGNATION- SITE INCHARGE (ELECTRICAL & INSTRUMENTATION), M/s VTC. JOB PROFILE SUMMARY:

Erection & commissioning of all Electrical and Instrumentation CHP Packages handling.

Erection & commissioning of MV, LT Switchgear, SCADA System, DC System.

Interconnection cabling between switchgear to equipment’s.

Illumination system indoor & outdoor, HIGH MAST, Cable laying and termination system.

Responsible for billing and reconciliation, statutory clearance for organization as site incharge.

Attend and resolve client issues regarding work activities, follow-up for work front through co-ordination with client.

WORKED WITH M/s ELITECH ENGINEERING CORPORATION, Rourkela as MEP ENGINEER to multiple site location on various food processing plants across India, with renowned clients as Buhler Group, Analogic Automation, Society Group, and Vinadith Corporation Pvt.ltd.

JOB RESPONSIBILITES:

Handling, Monitoring of MEP work fixes, fit out according to plan and schedule.

Handling, Installation, Testing, Commissioning of SMDBs, DBs, LV system.

Handling, Installation, Testing, Commissioning of HVAC System like Pumps, Pot strainers, ventilation system, MTRA classifiers, Sortex installation along with redundant PLC.

Handling, Installation, Testing, Commissioning of PHE System (Plumbing), including Hot water and cold water system.

Monitoring the installation of fire-fighting system, smoke detectors, and others BMS Equipment’s.

Preparing client Running Account Bills (RA) and certified with client and follow up for payment.

Review the shop drawings and follow up for execution. Plan and schedule for the MEP services for their execution.

Liaison with customer and consultants for speedy execution.

Project supervision & execution adhering to designed quality and safety requirements to meet the deadline of completion.

PREVIOUS EMPLOYER:

Worked at M/s (VTC) under Rourkela Steel Plant, NEW PLATE MILL site, designated as MEP Engineer on HVAC PROJECT from 14

th

SEP 2013 to till 19

th

JUN 2016.

JOB PROFILE UNDER PROJECT

Ventilation System- Ducting of Control Panel Rooms by G.I sheet of 20G, 18G and 24G as per IS: Grade through Interpretation of Drawing Layout based on First angle Projection method. Erection of Duct sheet. Termination of Duct sheet with Air Washer Unit.

Installation of AIR WASHER UNIT of Capacity 1,25,000 CMH, 45,000CMH consist of Centrifugal Fan erection, installation, Induction motor set up, Belt Alignment, Power cable and Control cable termination, Installation of air washer tank, fixing of nozzles and Pipes of 150NB, 125NB, 50NB, 32NB, hydraulic pump set up, Pot Strainer mounting, induction motor erection, coupling. Fabrication and Fixation of Elimination Chamber and Distribution Plate, Dry Panel Filter.

Erection and installation of Axial flow Exhaust Air Fans and Supply Fan with accessories, DOL STARTER PANEL set up.

Fixing, Alignment, Erection, Installation of Various ELECTRICAL Equipment’s.

Cabling, Earthing of Ventilation System as per Schedule.

Glanding and Termination of Power Cable, LSCP Erection and Setup, PDB Erection and Setup and Cable Laying as per route schedule.

Erection and Installation of FDA (Fire Detection Alarm) Work. DUTIES AND RESPONSIBILITES

Signing of Protocol from client for preparation of bill and CLC monthly clearances.

Responsible for planning, assigning, participating in and supervising the work of technician and helpers in the efficient operation, maintenance and installation of Air washer unit and Ventilation system.

Check periodically on motors, centrifugal fan, Exhaust fans, shaft coupling and controls; initiate action for the major overhaul of Equipment.

Able to read and interpret plans sketches, drawings and blueprints of machinery and mechanical Equipment’s.

Responsible for Preparation of Joint Measurement Sheet according to job Performed on Monthly target Basis and Reconciliation of materials according to client priority.

Prepare work reports: maintain stock of replacement and repair parts, material supplies; prepare requisitions for supplies parts and Equipment’s.

Have to maintain labor and material records and prepare reports.

Have to co-ordinate and communicate with superiors, sub-ordinates, vendors and clients.

Maintain safe operation of Equipment and tools at site. Have to establish and enforce safety regulations, work performance standards, rules and working conditions. PREVIOUS EMPLOYER:

Worked from 03rd

SEP 2012 to 1st

SEP 2013 at CREW PVT.LTD designated as GET in operation (Bulk material handling system) of Ash Handling Plant (Phase-2) in Captive Power Plant (945MW) at Vedanta, Jharsuguda Site.

JOB PROFILE

Acquainted in SCADA (Supervisory control and data acquisition software), PLC.

Operation of High Discharge (GEHO) Pump in Ash Handling Plant. GEHO- 110 bar (o/p).

Control operation of silo, Dewatering Bin, Agitator, Vibrating feeder, Slurry Pumps, Settling Tank, Bottom Ash and Fly Ash Mixing Tank, Pneumatic Valves etc.

Control operation of Electro Static Precipitator (ESP) of medium pressure boiler.

Maintenance of Conveyor systems of CHP.

TRAINING

Undergone one month Vacational Training at Rourkela Steel Plant, SAIL, under Blast furnace Department.

KEY SKILLS

Layout and blueprint data Interpretation.

Technical evaluation, Troubleshooting.

Manpower management, Personnel Management.

Planning, Scheduling of task, problem-solving skills.

Inspection, Analysis, Material management.

PROJECT WORK

Major project work done - Power production: Compressed Air Technology. TECHNICAL/IT SKILLS

AUTO CAD 10.0.

Knowledge on MS OFFICE, MS EXCEL and TALLY.

Certification on Bulk Material Handling Systems. Extra Co-curricular Activities

Awarded first class in Talent Search Scholarship Examination held by Orissa Icse Schools.

Participated and Awarded in Sports and Co-curricular Activities throughout the Career.

Represented as Deputy Head Counselor in School to conduct Prosperity and Maintain Discipline.

Points for self

• Self-motivated with a positive attitude.

• The ability to work in a team.

• Interested in exploiting my theoretical knowledge as practical. Hobbies & Area of Interest

1. Cooking.

2. Photography.

3. Gardening.

4. Football.

Personal Information

Name:

Father’s Name:

Ajay Kumar Das Passport No: M48293138.

Pradip Kumar Das

Date of Birth:

Gender:

Nationality:

29th MAR,1989

Male

Indian

Languages Known: English, Hindi, Odia

.

Declaration

I hereby declare that the above said information is true to the best of my knowledge and belief.

Place: Rourkela yours sincerely,

Date: 06.09.2019 Ajay Kumar Das



Contact this candidate