MICHEAL FALTS

**** ******** *** *** “C” RANCHO CUCAMONGA, CA91739

319-***-**** adcm9y@r.postjobfree.com

Page 1

~ COMMISSIONING INSTRUMENTION & CONTROL LEAD ENGINEER ~ Process Improvement Communication Engineering Quality Assurance and Control Product Life Cycle Engineering Troubleshooting, Maintenance, and Upgrades Computer Networking QUALIFICATIONS PROFILE

Highly analytical, innovative, and technically inclined professional, with extensive experience in instrumentation & control system and machinery systems Turbine & compressors; with strong background in project management.

Adept at improving performance and resolving quality issues by applying methodical problem-solving techniques to identify root causes and implement new technology solutions.

Effective at collaborating as team member and motivating the crew to achieve optimal output rates, while maintaining safety methods and practices.

Articulate communicator with bilingual fluency in English and Arabic.

Strong knowledge about petrochemical plants and oil and gas industries. PROFESSIONAL EXPERIENCE

ORASCOM E&C USA VARIOUS LOCATIONS

Project Engineer – Honolulu Rail Transit Project, Hawaii, USA Sep 2018–Present

Administer construction activity which include the following:

Installation of the Panels

Pulling and terminate Fiber & Cat6 cables.

Pulling and terminate Power cables.

Installation of the CCTV, Telephone, WIFI, ACS/IDS.

Follow up the quality work and performance as specification.

Troubleshooting any problems from Pre-commission.

Ensure all field changes are properly authorized and documented on red-line drawings. Instrument Commission Engineer – Natgasoline Project (EPC Project), Beaumont, TX, USA May 2017– Sep 2018

Administer pre-commissioning & commissioning instrumentation & control activity which include the following:

Optimization of the distributed control system/emergency shutdown systems (DCS/ESD) and facilitation of the SAT

(site acceptance test.)

Responsible for the communication between the DCS and IO remote (Pulling the fiber cable and termination).

Review the loop folder and coordination of the loop checks.

Responsible for the instrumentation site quality work and performance as specification.

Supervision of the Troubleshooting Team.

Troubleshooting and calibration of valves.

Troubleshooting the interconnection between the DCS and MCC.

Troubleshooting the communication between the DCS and 3rd party.

Administration of instrumentations material requisitions and orders for pre-commissioning & commissioning.

Ensure all field changes are properly authorized and documented on red-line drawings. MICHEAL FALTS

8391 ETIWANDA AVE APT “C” RANCHO CUCAMONGA, CA91739

319-***-**** adcm9y@r.postjobfree.com

Page 2

Instrument Control Lead Engineer – IFCO Project of Fertilizer (EPC Project), Burlington, IA, USA Sep14–May17

Downstream part (Nitric Acid, Ammonium Nitrate, Urea Ammonium Nitrate)

Review all instrumentation-engineering documents, ensure its conformance with project specifications, and plant SISs downstream part.

Review and update instrument index, data sheets, loop drawings, termination reports, and other wiring- related deliverables for instrumentation and control (I&C) system.

Create subsystem for all instrument.

Preparation of downstream loop folder documents.

Follow-up the installation of all types of instrument (flow transmitter, pressure transmitter, differential pressure, level transmitter, temperature transmitter, and PH analyser according to the hook up.

Follow-up on subsystem completion and construction activities.

Complete responsibility for DCS-ESD system SAT, start up, modification and commissioning.

Manage all pre-commissioning and commissioning activities including functional loop checks, motor solo-run tests, turbine over speed tests and troubleshooting.

Administration of instrumentations material, which need for pre commissioning and replace the damage instrument during construction.

Ensure all field changes are properly authorized and documented on red-line drawings.

Closely monitored engineering, construction, and operation of gas detection system and fiber optical cable in all the plant.

Responsible for the functional checks between the HVAC, gas detection, fire alarm. QC Lead E&I Engineer – BAIJI POWER PLANT (EPC PROJECT), Iraq Sep 2013–Jun 2014

Held responsible for creating all package in Instrument.

Identified and created the type of the check sheet.

Completed all the test need of the instrument, cables, Junction Box, panels, PlC and DCS.

Completed all the test need of the Fiber cables and cat6 cables. Senior Instrument Engineer – Sorfert Project of Fertilizer, Oran, Algeria Jan 2010–Sep 2013

Oversaw the entire aspects of project erection of control room, such as main control room; part of irr01

(Instrument rack room of ammonia1 and urea); IRR02; IRR03; IRR04; IRR05; IRR06; and IRR07.

Made use of cable tray inside the control room and the entering of cable tray.

Set up all the cabinets system including DCS and ESD, network, marshalling, power distribution, and foreign system.

Built the network cables and special cable, such as Fiber, Cat6 Hart prefab and Modbus.

Demonstrated adeptness in all aspects of erection for the following units, Demin Water Unit; Reverse Osmosis Unit; Desalination Unit; Sea Water Unit; Pressure Reduction System; Part of Urea; Material Handling.

Successfully managed erection of fiber cable that involved:

Pulling and connection of all fiber cable as well as IRR and CCR.

Communication of all the DCS and other system, such as radio and telephone and Intercom, fire and diff system in all the project.

Responsible for all Loop check and troubleshooting in Ammonia 2 and Part of Ammonia 1.

Partnered with UHDA and Nuovo Pignone for examination of all functions, interlocks, and trips schedules in ammonia.

MICHEAL FALTS

8391 ETIWANDA AVE APT “C” RANCHO CUCAMONGA, CA91739

319-***-**** adcm9y@r.postjobfree.com

Page 3

EL NASR FOR FERTILIZER AND CHEMICAL INDUSTRIES (SEMADCO) Instrument Engineer / Chief Manager – Etaka, Suez, Egypt Mar 2000–Jan 2010

Handled the installation of DCS (CS3000 YOKOGAWA CENTUM), which involved troubleshooting, maintenance, programming, and upgrades

Exemplified skills in updating software and project in HMI

Developed and maintained centum graphic, logic diagram, sequences construction, and trends

Set up LAN network and performed troubleshooting of PLC Allen Bradly SLC 500 and PLC Omron

Successfully completed sensor calibration of different type of flow meters (vortex, magnetic, carioles) temperature, pressure, as well as pH level and density from E+H, Emerson, ABB, Yokogawa, and Foxboro.

Conducted calibration vibration, axial, and speed probes for turbine generator and compressor for Bently Nevada 3500,3300 and 7200.

Responsible for the troubleshooting the control loop & instrumentations.

Responsible for the schedule and I&C planning of the shutdown

Procurement of damage instrument.

Hired instrumentation teams.

SUEZ MECHANICAL STEVEDORING CO

Programmer Engineer – Suez, Egypt Apr 98-Mar 2000

CANON CO

Maintenance Service Engineer – Cairo, Egypt Jan97-Apr98 EDUCATION

Bachelor of Engineering in Electronics, Computer and Control, June1996 Mansoura University, Dakahlia Governorate, Egypt

Project: Programmable Logic Control (PLC)

T E CHNICAL ACUMEN

DCS- Training Yokogawa Centm-VP “Essentials & Engineering classes” Houston,TX, USA

Windows Workgroups 3.1/95/ 98/Me/2000/XP/NT Server/7 Microsoft Office Applications (Word, Excel, Outlook PowerPoint, and Access CS3000 Yokogawa Centum) Oracle9i Developer 6i