SATYABRATA PARIDA
MECHANICAL ENGINEER (HVAC)
Email-id: adci51@r.postjobfree.com
Mobile: +91-809*******
Skype Id: satyabrata_parida188
CAREER OBJECTIVES
Dedicated Mechanical HVAC Engineer with eight years of experience in Project execution (Installation of Chiller, erection of Chilled water & Condenser water piping, Cooling tower erection, Piping insulation & FRP), Facility Management & Operation. Excellence in time management, problem analyzing & solving skills, overseeing operational process, preventive or corrective action and working with other experts to ensure proper Facility Management & Operation procedures are followed.
WORK EXPERIENCE
1.JASH TECHNICAL SERVICES LLC, Riyadh (SAUDI ARABIA):
Facility Engineer for MA’ADEN Head Quarter, Saudi Arabia Mining Company for Gold, Phosphate, Sulfur, Aluminum etc. (Jan’2018 - Feb’2020: 2 Years)
Experienced in handling:-
a)Vapor Compression Chilled Water System- YORK Chiller (220 TR of 3 Air Cooled Chillers), Centrifugal Primary Pump, Condenser Water Pump, Cooling Water, Water Treatment Process, Evaporator & Condenser Tube Cleaning, PPM of AHU, FCU, PAC,CSU etc.
b)Fire & Safety Equipment - Gas Suppression System (NOVEC1230), Clean Agent FM-200, CO2 system, WLD System, Rodent panel, HSSD system, Access system.
c)Hydro pneumatic system, Fire Fighting systems -Jockey Pump, Main Sprinkler Pump, Main Hydrant System, DG Pump etc.
d)Fire Alarm system, BMS & CMMS System.
Analyze load programs, perform required calculations, manage electrical requirements for HVAC equipment, and recommend improvements.
Coordinate maintenance programs with user units, assign maintenance manpower and timely completion of work in critical operating facilities.
Recommend special work schedules, overtime or contractor participation to meet emergency situations, managing breakdown.
Preparing PPM, DSR, MSR, MMR, daily report.
2.CBRE SOUTH ASIA PVT LTD, Mumbai - INDIA: Facility Executive for VIACOM 18 Media Pvt Ltd., Head Office. (Feb’2017 - Jan’2018: 11 Months)
Experienced with:-
a)Vapor Compression Chilled Water System- YORK Chiller (220 TR of 3 Air Cooled Chillers), Centrifugal Primary Pump& Condenser Water Pump, Cooling Water, Water Treatment Process, Evaporator & Condenser Tube Cleaning, PPM of AHU, FCU, PAC,CSU etc.
b)Fire & Safety Equipment -Gas Suppression System (NOVEC1230), WLD System, Rodent panel, HSSD system, Access system.
c)Hydro pneumatic system, Fire Fighting systems -Jockey Pump, Main Sprinkler Pump, Main Hydrant System, DG Pump etc.
d)Addressable Fire Alarm system, BMS System & CMMS System.
Analyze load programs, perform required calculations, manage electrical requirements for HVAC equipments, and recommend improvements.
Coordinate maintenance programs with user units, Assign maintenance manpower, and time completion of work in critical operating facilities.
Recommend special work schedules, overtime or contractor participation to meet emergency situations and Managing equipment breakdowns.
Preparing PPM, DSR, MSR, MMR, Daily report.
3)ABSOTHERM FACILITY MANAGEMENT PVT LTD., Mumbai- INDIA: Shift Engineer for COMMERZ I & II, a Commercial building for Corporate Sectors
(May 2015 - Feb’2017: 1 Year & 9 Months)
Experienced with:-
a)Vapor Compression Chilled Water System - YORK Chiller (600 TR of 3 Air Cooled Chillers), Centrifugal Primary Pump& Condenser Water Pump, Cooling Water, Water Treatment Process, Evaporator & Condenser Tube Cleaning, PPM of AHU, FCU, CSU etc.
b)Fire & Safety Equipments - Gas Suppression System (NOVEC1230), WLD System, Rodent panel, HSSD system, Access system.
c)Hydro pneumatic system, Fire Fighting systems -Jockey Pump, Main Sprinkler Pump, Main Hydrant System, DG Pump etc.
d)Addressable Fire Alarm system, BMS System.
Analyze load programs, perform required calculations, manage electrical requirements for HVAC equipments, and recommend improvements.
Coordinate maintenance programs with user units, Assign maintenance manpower, and time completion of work in critical operating facilities and managing equipment breakdowns.
Recommend special work schedules, overtime or contractor participation to meet emergency situations.
Preparing PPM, DSR, MSR, MMR, Daily report.
4)YADAV REFRIGERATION & ENGINEER, Mumbai, INDIA:
Project Engineer for erection of Chiller Plant in VODAFONE DATA Center:
(July 2013 - Oct’201: 1 Year & 4 Months)
Ensure the proper installation YORK Chiller (1000 TR of 8 No’s), Thermal Reservoir Tanks, installation of Centrifugal Chilled water Pumps, Condenser Water Pumps, Piping & Ducting insulation, Condenser piping FRP, HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation.
Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.
Arrange the sufficient manpower such as Supervisor, Foreman, Duct fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of them attended safety orientation and having proper PPE’s prior start installation activities at site.
Ensure site clearance.
5)SHAKTI SUGAR LTD., Dhenkanal, INDIA : Maintenance Engineer for Operation & Maintenance of Chiller Plant used for production of Sugar & Alcohol:
(Sep’ 2011 - Apr’2013: 1 Year & 7 Months)
Analyze load programs, calculations; manage electrical requirements for HVAC equipments for improvements.
Coordinate maintenance programs with user units to determine relative priorities and on time completion of work in critical operating facilities.
ACADEMIC BACKGROUND
Degree
School/College/
University
Yearof
Passing
Percentage of
Marks
B.TECH in Mechanical Engineering
Konark Institute Of Science & Technology, Bhubaneswar
2007-2011
7.8 GPA
12th Standard
Talcher College (CHSE), Talcher
2004-2006
62%
10th Standard
DCBM High School, Talcher
2004
81%
ACADEMIC PROJECT
PRODUCTION OF FIRE BRICKS, KIST - Bhubaneswar: (June’ 2010 - July’2011: 1 Year)
Project member for Producing Fire rated bricks using Chrome slag, Magnesia, Alumina, Waste Ash collected from manufacturing plants.
SUMMER INTERNSHIP
National Thermal Power Corporation (NTPC) LIMITED, Talcher: (June’ 2010 - July’2010: 1 Month)
Observation & training in application- Power using Boiler, Water Reservoir, Sedimentation Process, Cooling Tower, Turbine, Generator and Power Distribution Substation.
DECLARATION
I hereby declare that the above mentioned information is true to the best of my knowledge and belief.
Satyabrata Parida
REFERENCES
Atanu Roy (Facility Manager)
CBRE South Asia Pvt Ltd., Mumbai. Contact no. - +91-981*******
Email-Id: adci51@r.postjobfree.com
Pradeep Daund (Senior Manager)
CBRE South Asia Pvt Ltd., Mumbai. Contact no. - +91-993*******
Email-Id: adci51@r.postjobfree.com
PASSPORT DETAILS
Passport No- K4991341
Place of Birth- KHADIPAL, ORISSA
Place of Issue- BHUBANESWAR
Date of Issue- 15/03/2013
Date of Expiry- 14/03/2023
Date of Birth – 25/05/1989
TECHNICALSKILLS
AUTO CAD software.
BMS, CMMS.
MS WORD, MS EXCEL and MS POWER POINT
PERSONAL INFORMATION
Marital status: Single
Nationality: Indian
Address: Kharipal, Po: Baliptna. Kendrapara, Odisha, PIN- 754215.
Languages known: English, Hindi, Odiya