Resume

Sign in

Civil Engineering Engineer

Location:
Mumbai, Maharashtra, India
Posted:
March 24, 2020

Contact this candidate

Resume:

RESUME

LAKSHMI PAL

Baradwari Enclave, Gadgetry Complex First Floor,

No. F-1/3 Post- Sakchi - P. S - Sitaramdera Dist- East singhbhum

Jamshedpur Jharkhand Pin No:-831001

Email: - adce93@r.postjobfree.com, adce93@r.postjobfree.com, SKYPE ID:-laxmipa188

Contract Mobile No.821******* whatsapp No. 829*******

SR, QA/QC Civil Engineer/ Sr, QA/QC Civil inspector/ Construction Manager Civil & MEP & EPC OR Scofolding Supervisor inspector civil Roatting Equipment inspector or supervisor/Equipment Engineer/ projects. multile job experience.

CAREER OBJECTIVE I HAVE 18 PLUS YEARS EXPERIENCE IN INDUSTRIAL CONSTRUCTION Oil & Gas petrochemical Gulf & INDIA.

Experience Sr, QA/QC civil engineer inspection work and reviwing documents test report and survey report preparing by

self structure & steel structure industrial construction power & water treatment pipeline Steel plant, oil & Gas

petrochemical plant, high rise Building construction, transmission tower line, steel structure H beam column pre trashes

plat forma choker assist plate form erection heavy equipment vessel heat exchanger, ammonia conducer, heavy crane

300 ton capacity us.

To establish myself in a position where I can utilize my studies and potential, I would like to work with a concern which

will provide me the opportunity to learn more and utilize me as an asset of an organization.

EDUCATIONA - QUALIFICATION- PROFESSIONAL QUALIFICATION- PASSPORT-LICENSE- DETAILS.

Name of Institution/

Examination

Name of The

Board/University affiliated

to

Year of Passing Class/Division Over all of marks

obtained

Manikbacha Torelawa B.S.E.B ( Patna) - Bihar 1994 S.S.C. 70 %

Karimcity College B.S.E.B ( Patna) - Bihar 1996 H.S.C. 86.1%

Bachelor of civil

Engineering

Bangalore University

(Karnataka ) 1996-2000 B.E /2nd 69.5%

Passport No. P5661413 License No JH-05.2011/0033430

Date of Issue 5.12.2016 Date of Issue 30.11.2011

Date of Expiry 04.12.2026 Date of Expiry 04.01.2026

Place of Issue Ranchi Jharkhand Place of Issue Ranchi Board Jharkhand

Projects Details:- AL ZOUR REFINERY FROM 09/07/2018 TO TILL DATE

Company Employer: Project Location: Position Held Duration

Alghanim

International General

Trading &

Contracting Co.

W.LL.

AL-Zour Refinery

Project 4080 Mina Alzour Sr. QA QC Civil

Engineer 09/07/2018 to till date

Job Responsibility As Working Sr, QA/QC Civil Lead Engineer Like inspection & as per right way flowing specification and

reviewing documents and test report submit to the as per client requirement Heavy Equipment Civil Foundation resale to

consultant client inspection all foundation core direction equipments installation as it is as per drawing we are accept all

the foundation and civil structure column installed we are inspected that column foundation and best plate fixing sim

plate mounted label as per alignment we are inspected underground pipe line triaging, excavation, bed preparation

biding and post padding and back filling pipe line cover to the all thing are inspected as per ISO Standard right away as

and Site Quality Control Over All Document Submission Of Client And Contractor Handle Work, We Are Review Test

Certificate And Concrete Cube And Soil Testing By The Third Party FDT Test Over All Plant, Slump Testing At Site Prepare

To Pour Card And Check List And Flowing Method Of Statement As Well Flowing Client Requirement, Closing NCR,(Non

Comp line Request Latter )And (Finishing Surface Of All Building And Foundation Cube Compressive Strength Review And

Testing At The Third Party Test Repot,Civil And Electrical Cable Trench And Water Pipeline Execution And Finishing Item

Scope Of Control And Material Inspection And Reinforcement Inspection And All Types Foundation And Building Column

And Beams Inspection Work, pipe rack Foundation,4nos Impounding Basin Slope And Right Angle Big Size Impounding

Basing Metal lath Steel Fixing Inspection As Per specification Inspected During the inspection QC Client team members.

Projects Details:- KUWAIT OIL ANDF GAS CHEMICAL PLANT FROM- JULY 2016 to 2017

Company Employer: Project Location: Position Held Duration

KCCEC Engineering

Contracting co. Services

Ltd.

Kuwait OIL & GAS

Gathering Centre

GC-31

project

abdely

Kuwait

Sr QA/QC Lead

Civil Engineer

02.11. 2016 TO

30.06.2017

Job Responsibility As Working Sr, QA/QC Lead Civil Engineer Like As Office And Site Quality Control Over All Document

Submission Of Client And Contractor Handle Work, We Are Review Test Certificate And Concrete Cube And Soil Testing By

The Third Party FDT Test Over All Plant, Slump Testing At Site Prepare To Pour Card And Check List And Flowing Method Of

Statement As Well Flowing Client Requirement, Closing NCR,(Non Comp line Request Latter )And (Finishing Surface Of All

Building And Foundation Cube Compressive Strength Review And Testing At The Third Party Test Repot,Civil And Electrical

Cable Trench And Water Pipeline Execution And Finishing Item Scope Of Control And Material Inspection And

Reinforcement Inspection And All Types Foundation And Building Column And Beams Inspection Work, pipe rack

Foundation,4nos Impounding Basin Slope And Right Angle Big Size Impounding Basing Metal lath Steel Fixing Inspection As

Per specification Inspected During the inspection QC Client team members.

Projects Details:- OMAN GULF PETRO CHEMICAL PLANT FROM- JULY 2013 to 2016

Company Employer: Project Location: Position Held Duration

Gulf Petro Chemical

Services LLC. & BSL

Engineering Services Ltd.

SOHAR REFINERY

OMAN GULF &

BASRA IRAQ AND

INDIA OICL

MATHURA UP

INDIA OIL & Gas

Sr QA/QC

Engineer (Civil)

12.07. 2013 TO 02.11.2016

Pre cast Installation of pipe sleeper respective modules. Management of changes execution in the existing plant in totality i.e.

disciplines Civil, Mechanical, Piping, Electrical, Instrumentation, process etc Project management—Engineering, procurement,

construction, erection, testing, certification, commissioning and handover of projects Preparation of FEED documents and

complete coordination for delivery of documents. Review of EPC packages and execution of EPC projects. Main Processing Plant

(Oils): Comprising Export oil tanks, settling tanks, Off spec tanks, Sludge catcher, Heater, Sand wash package, Booster pumps,

Metering skids, Chemical Injection skids, Raw water filters, Pig launcher/ Receiver, Export oil/ Fire water pump, Stabilized oil

pumps, Injection water pumps, Gas Scrubber, Vessels as Depurator, Dehydrator, DE aerators degassing boot, Activated filter

foundation, Heat exchangers, Technological structure, Nitrogen compressor, Booster, ED Gees & Sewage treatment plant Utility

tanks and equipment. Oil Well Pads: Comprising Multiphase flow meter, Chemical Injection skids, Instrument air, Pig launcher/

Receiver, Eyewash and safety shower, Valves, Lighting mast. Cellar pits, Piping & E&I works which includes telecom facilities also,

Complete delivery and installation of all packages for production of oils from well pads (Upstream) Pipeline in Oil & Gas Well Pads:

Infield pipelines in the scattered oil well pads area (Includes midstream also)

Consultants:- Record All Pre-Cast Activities Like Concrete Masonry Unites Manholes, Catch Basins, Valve Box And Footing With Pedestal,

Etc…

Ensure The Quality Of Works In All Stages Of Construction I.E.

Incoming, In Process And Final Stages Of Construction Works As Per Applicable Standards And Specifications.

If Any Construction Operations Are Observed As Being Unsatisfactory Then Will Immediately Instruct The Construction

Supervisor To Correct These. If Appropriate Action Is Not Taken Then A Site Observation Memo Or Non - Conformance Report

Will Be Raised

Maintaining A Daily Log Of All The Inspection Requests Submitted By The Construction Supervisor And Report To PMC

Making Weekly Reports of NCR And Inspection Status And Submitting To The QC Manager

Quality Document Reviewing.

Review Method Statements ITP and Recommend For Approval.

To Identify The QC Requirement For The Project (Ex Resources Procedures, Documentation Etc) And Liaise With Operation And

QC Department.

to Plan and Supervise Subcontractor Inspection Activities And Review Of Sub Contractor QC Performance.

Co Ordinate with COMPANY (PMC) QC Inspectors For All Construction Activity And Get Approval For Proceeding The Next Activity.

Inspecting Material Involved In Civil Engineering Construction Like Raw Material For Concrete Batching Plant (Cement,

Aggregates, Admixtures, Etc...), Curing Agent, Reinforcement, Formworks, Anchor Bolts, Concrete Protection Coating, Concrete

Repair, Grouting, Etc…

Monitor The Batching Plant On Site And Fresh Concrete Testing Like Concrete Temperature, Slump And Cube Casting Etc...

Monitor The Soil Testing On Site Lab Like Proctor, Plasticity Index And Verifying Test Reports As Per International Standard &

Monitoring Of Weekly & Monthly Soil Sample Test Reports.

Supervise Field testing like FDT and verifying test reports as per

international standard.

Organize daily pre-pour, post pour inspection and inspection of concrete, soil as per ITP (Inspection Test Plan) & QA/QC

Procedures on site.

Inspection of all civil scope work for underground pipeline works

(Underground utilities) and cable trench works (civil scope).

Review of Survey reports and various inspections for the alignment, level & coordinates checking for the anchor bolts for

foundations and pedestals.

Establishes uses and maintains effective quality control measures.

Provides technical assistance to Sub Contractor and Client Dealing.

STRENGTHS Sr, QA/QC Civil Structure and Steel Structure Execution Control,

The person must have technical competencies to take the role of technical lead of all the work at the gates viz Precise Marking,

Fabrication, Steel Structural work (egg. Canopy, Gate modification, Handballing), Welding, Erection and Mechanical work and align

the OEM suppliers of Gate equipment's like ATB / Bollards / Turnstile, Tripod, VABs etc. to work in sync.

The person must be able to technically guide and supervise all infrastructure work at Gates (Employee, Material & Railway Gates)

on the perimeter and will work as single point of contact for the execution work at Gates.

He must have sound technical knowledge on drawings study and ensure implementation at site based on these drawings.

He should be well versed with all IS / DIN / ASTM or equivalent standards of Preparation, Fabrication, Welding Structural Work,

Mechanical work and Erection. Should able to resolve any unexpected technical difficulties and other site related issues that may

rise & should Able to give suitable solution based on engineering parameters, techniques & experiences.

Have good experience in estimation & costing of infrastructural works.

Should analyze proposed site factors and design maps, graphs, drawings, tracings, and diagrams to illustrate findings Should

prepare reports and document project activities & MIS.

The candidate should have relevant knowledge of the current tools and techniques, well versed with Site

safety compliances &regulation inside steel plant.

He should have the ability & attitude to step in for the work with the vendor team & its supervisor in case any specific

requirement or Site condition.

Manage vendor and OEMs or their representatives at site for daily progress of work as per schedule & timeline.

Should have knowledge of all the Infra work from design drawing approval and Deep foundation Excavation of details scope,

BOQ, specifications, material, and services Scope.

Infra work including Marking, Fabrication, Steel Structural work (egg. Canopy, Gate modification,

Handballing), Welding, Erection and Mechanical work IS / DIN / ASTM or equivalent standards of Preparation, Fabrication,

Welding, Structural Work Mechanical work and Erection Structural and Mechanical Work execution

Extension project unit second face 2 oil and gas plant Mathura up for civil construction and steel structure heavy steel column and

ism beam ashtrays Overall Civil structure and civil foundation motor foundation tensile &Structural QA/QC execution in charge for

CRU V.B.0 Area AVU,FCCU, O.S.U, Prime zee unit Tech for IOCL Petro Chemical Refinery. Acquainted with Steel Structural Quality

Analysis, Erection Quality etc, Hands on experience in CIVIL foundation construction and submission daily & weekly progress

report to the Main Office to assist project head in material selection, advice on al ternate materials recommending of construction

methodologies to suite the given materials segments& Maintained proper Documentation of site works. Followed up the work

progress on site. Sharing of best practices & learning's through circulation of case studies on root cause analysis of repeated non

conformances & implementation of learning's on project sites for continual improvement.

Responsibility of Duties includes-

Fabrication of concrete pipe racks (Precast columns and beams). Erection of concrete pipe racks (columns and beams).

Underground utilities (manholes catch basins ditches and PVC pipes) Installing of reinforce concrete pipe sand ductile iron pipes

Concrete and steel Pipe racks foundation sere action of steels structure on concrete pipe rack Culverts, Tanks and chemical pits

foundations. Apr 2006 Jan 2007 With Kittened Construction Mathura a Project Engineer for (Indian oil & gas project Mathura up)

Project(IOCL) (Main contractor Techno France).Areas of Responsibility Prepare bill and requisition of materials Prepare material

take-off and cost estimate for various trade of the project Review civil/ structural plans of ensure consistency of requirements.

Supervise and in spit civil, structural, and architectural works to ensure strict compliance with the plans, specification on

documents. Supervise sampling of materials as called for by the contract provision on quality assurance and control Ensure

smooth project flow by coordinating a specific work with other trades involved in the project. Prepare working schedule and

strictly monitor the progress of work to ensure completion within contracted time frame.

SKILL computer knowledge ms office project, ms Excel and AUTOCAD itc Operating Systems: Windows XP &windows 7, MS office,

MS projects, AUTOCAD, Outlook

Excellent communication skill, good at public relations, excellent inter-personal skill, soft spoken relationship, smoothly taking,

about that any words using one think good & fact Humble punctual motivation. Honest punctual self-motivation positive attitude

team work (meeting attend) Target achievement assignment assigned Positive attitude teamwork meeting. Target achievement

assigned meting attending hobbits fast & hard working.

ORGANIZATION Project CLIENT DESIGNATION PERIOD

Voltas Limited Pump House, STP, Tata Steel (Project Manager 10.01.2011 to

Tata Nagar Jharkhand WTP, Water Civil & Steel 31.07.2013

Treatment plant Structure)

Voltas ltd WMBD Division in Tata Steel Jamshedpur River Pump House(Project value approx. 150 Corer3MTPA Water Treatment

Plant 27 MGD expansion Project- Tata Steel is setting up the Water Treatment Plant at Mango, Jamshedpur in the state of

Jharkhand in India.

AREAS OF RESPONSIBILITY-

Experience into QA/QC Civil works for Water Pre-treatment (WPT) and Liquid Effluent Treatment (LET) System Package,

To ensure submission and approval of MDL from Engineering Department to client.

Preparation and approval of L-2 schedule.

To Plan, schedule & monitor procurement & design related activities.

Preparation of scope of work & allotment of work orders to sub-contractors for erection & commissioning work.

To ensure proper execution & monitoring of site related Erection and Commissioning activities works.

Verification & measurement of mechanical sub contractors bills for releasing their payments.

Verification of Invoices / Bills & follow up with Finance department for Vendor's Payments.

Preparation of entire bill of material of a project.

To expedite & coordinate supply & inspection of all equipment with vendors/ client.

Responsible for getting Time extension if any delay in project.

Should be experience in execution and commissioning of WTP Projects and water structure.

Responsible for the Budgeting of the project scheduling namely PERT charts, MS Projects etc

Contractor Management and Client Management. Maintaining Quality systems and regulation of Quality

Standards. Should possess sound knowledge of construction equipments. Timely execution of project and

Management of time delays. Will be responsible to ensure progress, maintain quality, cost-effectiveness, ensure

Timely project completion and maintain required health and safety standards. Actively involved in procurement

Of materials and coordination with client/vendor/procurement department. Will be responsible for periodical MIS

Reports to management/client/consultant. To prepare risk control matrix based on nature of activities involved for

The project.

As per our job concern mobilize our resources and manpower.

Studying different type of Civil Engineering drawing and identifying the scope of job.

Detailing the scope of job.

Preparing the Bar Bending Schedule of individual Job.

Execution Civil engineering job, lay out & other enabling Civil works with fulfill Quality and Safety norms. Co ordination with

Clients, Consultant and our different department in leadership style.

Co ordinate& improve the safety culture at our site.

Planning, programming as per requirement.

Detail planning & estimation of the total project.

Billing client & subcontractor both.

Working as a Project Manager Civil with Voltas Limited (Water Management Business Division) at RPH (River sump

House) 3MTPA Water Treatment Plant extension project, Jamshedpur Tata Steel project Tata Steel Limited is setting

up a Greenfield extant ion Water treatment Plant at Jamshedpur In the state of Jharkhand in India, with an investment of Rs. 50

Cores construction Successfully completed sludge balancing tank, Thickener-1 & 2, capacity 80,000 Litter size

23 miters o d diameter circular and height 3.5 miters. + 3 miter up to center line Thickened sludge holding tank at river

Pump house Tata steel project. Clarify oscillator water tank size 48 miter OD Diaz miter circular tank, capacity

15MJD ultra centrifuge Building. 2nd floor multi storied building, commercial, length 25 miter. Width 12.5 miter height 15 miter

PLANING & BILLING SCHEDULING ACHIVEMENT-

Execute open foundation, well cap, hollow circular pier, octagonal pier cap & hammer head pier Bricking with for CLC Level

Execute 3.00m segment of balanced cantilever PSC single cell box girder with central hinges by CLC gantry. Execute 60m simply

supported pre-stressed box grinder (Erection of supporting arrangement, shuttering Reinforce cement including BBS Building

finishing works including Expansion Joints ensuring al construction activities carried out in compliance with all codes, standards &

procedures of engineers design Prepare construction program with resource planning &schedule for every activity for Building

construction Prepare DPR &Involved in all sorts of correspondences with clients. Suppliers & different section of Head Office

Prepare Running Account Bill with quarterly escalation as per CA Preparing work orders & maintaining measurement book of sub

contractor Preparation Job permit permission &check List, Clearance according safety maintain Quality control & side insurance

&procured measurement quantity achieve reinforcement & excavation Civil structure & steel structure, water treatment WTP,STP,

Centrifuge building, flashing tank, reservoir tank, industrial construction Jamshedpur and road construction building construction

water plant and power steel chemical plant, steel plant, power plant experience in Infrastructure, Area Development, Water and

Waste Water ( HDPE, DI, UPVC Pipeline, Reservoir & Pump station construction) Utility Works, Earth Works, Hard Landscaping &

Road Projects. Should have completed minimum 5 project as Construction sewerage water pipe line with steel structure and pipe

Die 1.5 miter, laying heavy pipe laying and Di pipe and Cir. pipe and GI pipe sewerage pump house Kolkata with green field

building construction.

ORGANIZATION PROJECT CLIENT DESIGNATION PERIOD

SRACO Group & Saudi Armco Industry Armco refinery QA/QC Civil Engineer 11.04.2010 to

International company Refinery project Project 02.01.2011

SRACO All shaeed R-Zahrani Contracting company SRG project petroleum @power plant building construction work, Oil & Gas

Aram co project port pipe line foundation of project

Gulf Saudi Arabia Oil & Gas Aram co project pipe line foundation and boundary fence civil construction steel structure pipe support

and Building construction work technical institute tanning Good Experience in Large Industrial Projects. Pipe line Armco refinery in

side port sea area machinery Foundation and boundary fence foundation and pillar fixed casting concreting. And pipe rack

foundation tentative Foundation RCC and PCC exaction work and steel pipe spot making and fixing work Experience in project

management Site Administration, General Management, and Strategic Planning Managing by Planning, Scheduling, Monitoring,

Organizing, Controlling, and Execution of projects in all respect switch Quality & safety Deftly handling all finishing items viz.

flooring, tiling plumbing plaster in planning pivotal role in Managing by Planning, Scheduling, Monitoring, Organizing, Controlling

and Execution of projects in all respects with Quality & Safety. Reviewing designs, drawings, specifications, BOQ &modifications

required to suit to prevailing site conditions Center all- Jubal-Dammam & Maintenance works (Project value approx.

SR.1000million.) Include this finishing of work DAMAM city hospital Project —technical institute Mani group is setting up the

hospital building including Commercial Building at Armco Saudi Refinery Project Building Construction Masonry Foundation and,

Pipe rack foundation, Excavation up to compaction with RCC work. All type masonry foundations per drawing structure layout

execution work and client dealing and billing as Scaffolding casting Road work Grade -1 & Grade -2 prepare project in Industrial

compound area road work sub contractor building and monitoring hard working with controlling, planning and document

estimation achieving work excavation all type different foundation achieving work.

Organization Project Client Designation Period

Tara pore & Company

Ltd

500 mw TATA Power

project, Jamshedpur

Tata Power Project Engineer Civil &

Steele Structure )

29.06.2009 to

07.04.2010

Responsible for QA/QC Supervising Project site works. Site measurements, site layout and other works including Representative

the interest of the client and provide independent professional advice.

Overall responsible for the planning management coordination and financial control of a construction project Oversee performance

of all trade contractors and reviews architectural and engineering drawings to make sure that all specifications and regulations are

being followed. Report to owner and GM about progress and any necessary modifications of plans that seem indicated. Involved in

Structural Erection work of Tara pure & Company, Chimney with Staircase Coordinate all predevelopment work associated with

projects. Prepare project proposal and determine time frame, budget, staffing requirements and allotment of available resources

to various phases of project. Preparing project requirements of manpower, machineries & materials, bar-chart, cost implications,

extra items & its rate finalization, monthly budget, complying with project control budget etc handlings.

Sub-contractors bill till payment after certification from execution team monitoring client bill in timely manner from preparation to

payment & Documentation with my team.

Successfully completed the Foundation & Super-structure of Boiler, Foundation of FD Fan & ID Fan, Molasses Tank, UGR,

Crystallizer in Power Plant, Tata Power Jojobara successfully completed the 1200 mm Dia. casing piling up to 23 meter depth Post

tensioning pile cap, Normal Pile cap & completed the RCC Super structure with the arrangement of Slimly form shuttering up to

120 meter height Responsible for the quality of all materials also reporting and assisting for Quality control in monitoring and

process control for all activities related to the project. In addition to this, I am assisting the Engineer/Contractor in all aspect of

Billing, project management and Quality control Execute Twined D type well foundation (caisson) with injuring safety and quality

standard as per codes & design. Execute Building Super Structure with Cantilever Construction beam Preparing work order and

marinating monthly measurement book for sub Contractor planning and monitoring day to day Activities & preparing Construction

program for building Construction Execute Erect ion of Shuttering & staging materials. Chimney 175 miters Height, 12 Diaz miter /

thickness500mmconcreting Chimney, 120 kV switch Location Tata Power Project JOJOBERA site Complement of work. Foundation

To Pedestal & Bolt Life Foundation 24 Diaz to 32 Diaz Thread Bolt Fixing as per drawing Work, Cost Of Project-60 Cores chimney

height 175 miter location Tata Power Project JOJOBERA Site, Complement For Work.

Next -Project: C.R.M Bara project (CRM Complex) Cost of project- 150 Cores

LPG System Mounded 72*2propend tank overhead tank & Fire Fighting Building &over head tank Foundation Pedestal Bolting

/Cooling Tower size 65 miter length 45 miter width Water System Building Foundation & Wall With Pedestal Dispatch Office

Building Dining Room Bulling/Electrical Building /Coil Receiving Building Foundation To Slab Work, Security Gate Building And

Administration Building Second Floor Building.

SURVEING OF AREAS RSPONSBILITIES ESTIMATE PLANING & BILINGS.

Checking & maintaining centerline building Establishing T.B.M at site Transfer of levels & Bench marking shifting.

Maintaining alignment prepared of all segment cantilever beam Profile leveling for supporting arrangement erection & building

finishing works.

Prepare construction program with resource planning & schedule for every activity for Building construction.

Prepare DPR & Involved in all sorts of correspondences with clients, Suppliers & different section of Head Office Prepare Running

Account Bill with quarterly escalation as per CA Preparing work orders & maintaining measurement book of sub contractors

Preparation Job permit permission & check List, Clearance according safety maintain Quality control & side insurance &procured

measurement quantity achieve reinforcement & excavation Preparing construction program from CLS super structure with restores

and schedule Preparing monthly T.0 sheet & involved in all sort of correspondence with client supplier & different section of

Preparing and maintaining execution documents measurement book of sub contractors.

ORGANIZATION PROJECT CLIENT DESIGNATION PERIOD

IJM India Municipality Ghazi Eastern QA/QC (Civil Engineer 12.09.2007 to

Infrastructure Ltd. Corporation Limited 17.02.2009

Limited.

Munshipalti on Corporation Project Cost of Project 675Crores Clint-Consultant: Ghazi eastern Limited mint road New Dehli-110002

Complex Building multistory construction project contract company Name- IJM (India) INFRASTRUCTURE LTD COMPANY

PROFILE-

Successfully completed the 3rd Basement + G.F + 38th multi Storied Commercial Building From the DMC pile cape Project

Municipality Corporation Civic Centre New Delhi Construction Central Plaza ESS Building ABCD Block Building Handing.

As per our job concern mobilize our resources and manpower Studying different type of Civil Engineering drawing and identifying

the scope of job detailing the scope of job preparing the Bar Bending Schedule of individual Job.

Execution Civil engineering job, lay out & other enabling Civil works with fulfill Quality and Safety norms. Co ordination with

Clients Consultant and our different department in leadership style Coordination with HSE Department for improving the safety

culture at our site.Road project Táchira pale Chennai- Next-NH-45 Project of kilometer 48 km cost of project:-645 CRORE Execute

Twin D type well foundation with ensuring Safety & Quality standards specification.Position of Work Structure Major Bridge Minor

Bridge Box Calvert and Drain work.Description of Duties-Acquainted with Bitumen Extraction, Sieve Analysis, Marshall Stability,

Softening Point Test, Penetration Test, Flash & Fire point test, Stripping Value test, Aggregate Impact Value, Aggregate Flakiness

&Elongation Test etc Preparation and submission daily & weekly progress report to the Main Office Calculate the quantity as per

Drawing and Record Maintained proper documentation of site works Followed up the work progress on site. Supervise contractor,

works for Execution of Roads like Sub grade Excavation Sand Blanket, GSB, WMM LEVEL and FDD Prepared & issued monthly

progress report Followed up Health &Safety environments regulation (HSE) at site Responsible for Projects Execution like Flooring

Boundary Wall Paver Block Plant Road Equipment Foundation Plant Drainage Car Parking SS Railing etc.

Got experience in steel Structural Erection, including civil structure foundation.

Overall QA/QC in charge for the Multi Storied building project on behalf of ensure that work done on site meets specifications &

complies with national & international standards & best practices.

Acquainted with Sieve Analysis, Aggregate Impact Value, Flakiness& Elongation Test, Specific Gravity, Water absorption, Bulk

Density, various cement tests fineness test, initial and final setting time, compressive strength, Bricks test, TMT bar test — Rolling

Margin etc. To



Contact this candidate