Resume

Sign in

Civil Engineering Power Plant

Location:
Sharjah, Sharjah Emirate, United Arab Emirates
Posted:
March 19, 2020

Contact this candidate

Resume:

Dilip Kumar

Mobile: +971*********/056*******

Email: adcc9p@r.postjobfree.com

OBJECTIVE

Available immediately to work in a dynamic environment where I will use my expertise in both cost management and field operations to manage co-workers and equipment while strictly adhering to safety and quality standards.

Skilled engineering professional offering 20+ years of experience as a project manager and Multi storied residential & commercial buildings, Group villa, Five star hotels & Resorts, Malls, Educational intuitions, Terminal buildings, Airports, Hangers, Pre-engineered buildings, Ware houses, Modular & Light grade steel buildings, interior fitouts.

Experience includes safety; quality control; writing project plan; reports and documentation; scheduling; reviewing bid proposals and awarding contracts; preparing budgets and controlling expenses; proven record of success completing projects on time & under budget.

Strong technical and methodical aptitude with an inmate ability to analyze; coordinate and synthesize data; aggressive in identifying and resolving inefficient operational process; strong team member able to motivate coworkers to achieve method and practice. Excel in unpredictable & hectic environment

Area of expertise

. Define scope, deliverable compliance to contract documents.

. Construction planning and scheduling. . Allocate task with target productivity

. Requirement of resources . Collect and manage team

. Manage budget . Allocate resources as per task

. Track deliverable & productivity. . EHS compliance management.

. Coordination with subcontractor and interface and correspondences.

. Knowledge of FIDIC . Ensure Time, cost and quality.

. Management information system (P&L, progress weightage, resources required and release projection, cashflow).

Academics

Graduate: B tech in Civil engineering

Specialization: Civil engineering

Institute: CMJ

Professional Education: 3Years Diploma in Civil Engineering

Specialization: Civil Engineering

Institute Rourkela Institute of Technology

Post-Graduation: GPPM: ACM

Specialization: Construction Project Management Degree from NICMAR

Institute: National Institute of Construction Management and Research. NICMAR

Computer Specialization

Project Management : MS Project, Ms Office, Auto cad

Work Experience

June 2007 – Aug 2010: Shapporji pallonji Mideast llc ( Dubai, Abu Dhabi- UAE).

Project1: Gold crest executive (5B+G+39) Commercial & Residential at JLT on plot C2. Project constitutes of external glass cladding 39 storied with half a million square feet of area. The total height of the building 140 meters. G + 19 commercial use which consists executive offices with business center and meeting rooms with public address, BMS, Access control system. From 21st to 38th floor project consist of residential area including modern facilities and recreation center such as swimming pool, club house, multipurpose hall, sauna steam and Jacuzzi, recreation room with billiards table and table tennis, electronics game hall.

Client: ETA-GIGA STAR.

Contract Value: 187 Million Dirham.

Project2: Construction Fair Mont bab albahar five star hotel (G+9) &19 Nos Resort villa at Abu Dhabi between two bridges, with 321 guest rooms, 50 service apartments, spa & night club, banquet hall, regular guest room, royal presidential suites, public area, which includes interior decoration work of all day dining, al naba’a lounge, chocolate gallery, Frankie’s Italian restaurant and bar, steak restaurant,Lebanese restaurant, sedar lounge, Susie bar, health club.

Client: ALFAHIM

Developer: TDIC

Contract value: USD 200 Million

Role: Construction Manager

Jan 2017- Till date Line Investment llc ( Abu Dhabi- Uae)

Project: Construction of Al Dhafra Mall at western region consists of built up area of 32400 sqm with (B+G+M) 12456 sqm hyper market, 58 nos retail, food outlets and food court, restaurant and entertainment area having 347 covered parking with offices. With HVAC heat recovery system, firefighting, co2, voice evacuation, fire suppression system, cctv, public address system, storm, drainage and drinking water network,.

Client: Lulu hyper market and department store

Contract value: 127.5 Million AED

Role: Project Manager

Nov 2014- Jan 2017: Nael & Binharmal llc (Abu Dhabi- Uae)

Project 1: Construction of 162 no’s of villa with Majlis, infrastructure, water, road, storm and drainage network as Al shuiaba residential complex design, construction & maintenance with infrastructure.

Client: Musanada

Contract value: 330 Million AED.

Project2: Construction of Upper zakum 750 central island surface facility EPC2 Project No- P7512. (Central Island offshore- Abu Dhabi- Uae). project compromises construction of pilling, island field control centre buildings, Harbour building with arrival, departure and transit passenger facility, Cicpa accommodation and data building,.

Client: ZADCO

Contract value: 850 million AED

Role: Project Manager

Aug 2005 – June 2007: Dolphin Steel Construction llc (Dubai- UAE).

Projects: -Wonu International with pre-engineered factory building, mainoffice building, storage, chemical tank, flair foundation.

-Astra polymer pre-engineered factory building with equipment’s foundation, overhead rolling crane foundation, office building.

-Apparel group pre-engineered structural storage area, factory ware house.

-Safety electrical pre-engineered factory shed with office building with staff quarters at JAFZA, TECHNO PARK.

-Pre-engineered structure Labor accommodation at Al Quoz Industrial area.

Role: Senior project engineer

April 2001 – August 2005: Joannou & Paraskevaides (O) Ltd ( UAE, Qatar, ksa)

Project1: Construction of a 6nos each 5000SQM(G+3) residential building facility, community centre (6240 SQM) with indoor game recreation and fitness hall, mosque, clinic, swimming pool, indoor and outdoor recreation facilities paved air strip with terminal building, related infrastructure, site development, sewage treatment plant, gathering tent, medical Centre at Haradh ( Haradh- Ksa).

Client: Saudi Aramco

Contract Value: USD 81 Million

Project2: Construction of a luxury five star hotel. The total built-up area 34000 SQM and comprises of three floors of public area and six typical guest floor. Providing 300 bedrooms. The facilities include distinguished restaurants, coffee shops and ball room (600 SQM). The hotel also includes indoor and outdoor sports and recreation facilities, beach club, swimming pools, landscaping, gardens and reclaimed land which required sea protection work

Client: Gulf Hotels Company

Contract Value: USD 57 Million

Role: Project Engineer

Project3: Construction of 7 nos hangers for airbus A 380 at Dubai international airport for EMIRATES NEW ENGINEERING CENTRE (Dubai-UAE), with all required facilities (workshops, power plant, stores, car parks, administration building, mosque and all services).

Client: Emirates Airlines

Contract Value: USD 440 Million.

Role: Project Engineer

Feb 1997 – Jan 2000 : Alfaraa General Contracting llc (Abu-Dhabi .UAE.)

Project1: Rumaity multi-storeyed buildings (2B+G+M+18) at Khalidiya street

Cleint: Khalifa committee

Project2: Al salam Multi-storeyed buildings ( 3B+G+M+18)

Client: Khalifa committee

Project 3: Al sabbah joinery

Production of wooden doors, counter tops, carcase, vanity tops and installation. GRC production and installation

Role: Site engineer

May 2013 – Nov 2014: Shaksy Engineering Services LLC (Muscat- Oman)

Project: Construction of G+7- 11 no’s Commercial and Residential Building with Built up area is about 40,000sqm at Mumtaz in Muscat.

Client: - Sheikh Raid Al–Araimi.

Contract Value: 11Million Omani Riyal.

Role: Senior construction manager

Jan 2000 – April 2001: Dodsal pte ltd (Muscat-OMAN)

Project: Construction of petroleum refinery at al nimar with facility of Treating 150,000 BPD of crude oil plus associated water and Engg, procurement, construction, testing & commissioning of facilities capable of generating 575,000 BWEPD of steam and gas (comprising central processing facility with oil treatment untimed-oiling train foundation, tank farm foundation with cathodic protection, de-sanding facilities, VRU compression system foundation, flare facilities foundation, utility system and two satellites with group separation facilities, pumps foundation and flaring system foundation)

Client: - Petroleum Development of Oman

Contract Value: - USD 60 Million.

Role: Site Engineer

Aug 2010 – May 2013: Jindal Steel Power Ltd

Project: Construction of integrated steel plant,-wire mill, bar mill, ballast furnace3MTPA, coke oven, sinter plant, steel melting shop, cast house, control room, battery house, Effluent treatment plant, offices & town ship for employees( precast, Modular, LGS, Speed floor systems),infrastructures, Road, Project office, Fitness centre, Medical Clinic, School, Technical Collage, laying of railway track of 6 km, raw material wagon siding, sick wagon siding, wagon tippler, coal handling plant, captive power plant.

Client: Jindal steel power LTD

Project value: 300 crore.

Role: Deputy General Manager.

March 1992- Feb 1997: B.L. Kashyap & Sons Ltd

Project1: Construction of Flex chemicals plant at Malanpur, Gwalior in (M.P). Pilling for machines foundation, manifold towers, compressor foundation, raw material storage, flairs foundation, silo foundation, pipe line and pipe racks, warehouses buildings with double basement, ware house of pre-engineered and prestressed design pre-engineered towers up to 37 M height, overhead water tanks tailing pond and evaporation pond, powerhouse, substation, underground water tank, sewer and water treatment plant. Pipe racks with steel structure.

Project2: Construction of Nahar spinning mill at Bhopal (M.P). includes construction of 141m tower with its machine foundation, cable trench, return air and dust air trench ducts, warehouses of pre-engineered design.

Project3: - Construction of mayur spinning mill at baswara (rajas than) work includes main machine building with machines foundation cable and return air and dust air trench.

Role: Assistant project manager

Appreciation letter

• Dolphin steel construction for achieving the project in time schedule

• Saudi Aramco for accomplishment of project before schedule.

• Petrofac for accomplishment of building project.

• Jindal steel and power for project accomplishment.

Personal Information

Date of Birth- 17 may 1973

Place of Birth- Jaduguda

Passport no- N0718943

Place of issue- Abu Dhabi

Date of expiry- 16 April 2026

Valid driving license- Dubai



Contact this candidate