Resume

Sign in

Document Controller

Location:
Riyadh, Saudi Arabia
Salary:
4500 Basic salary+allowances
Posted:
May 17, 2020

Contact this candidate

Resume:

CONTACT

Mob: +966*********

EMAIL:

adc9w8@r.postjobfree.com

EDUCATION

Govt. Degree College Gujrat

Pakistan

**** ** ****

Intermediate F.A.

RESPONSIBILITIES

1. Arrange numbering system for all

the Technical submittal, Shop

drawings, QA/QC and the project

Correspondence according to the

project specification and the

consultant requirement.

2. Handle document control

system independently.

3. Scanning and hyper-linking of all

incoming documents /drawings

/material/ RFI,s and stored in

respective logs.

4. submitting all shop drawings,

Material submittal, RFI & Sample to

Consultant and maintain logs with

complete history of the drawings,

material and samples.

5. Review comments and approval

received from consultant and

distributing to respective discipline

for updating.

7. Maintain an efficient filing system

for easy reference of catalogues,

technical data and other office

routine files.

8. HR Manual job description

updating up to higher

management.

9. Handle all project contract

Agreement documents.

SUFYAN BAIG KHALID BAIG

Document Controller

Objective:

Seeking a challenging career in a progressive organization where I can acquire current and relevant knowledge and develop effective skills to maximize individual and organizational productivity. WORK EXPERIENCE

Fourteen (14) years of experience in the field of construction in K.S.A. Al Fouzan Trading and Construction Co {Secretary / Document Controller} Project Name: Tiling of Western Piazza,s Medina – (Prophet Mosque Expansion) Project of MOF.

(February 2019 To Continue….

Submitting all shop drawings, Material submittal, RFI & Sample to Consultant and maintain logs with complete history of the drawings, material and samples .Review comments and approval received from consultant and distributing to respective discipline for updating. Al Fouzan Trading and Construction Co {Snr. Document Controller} Project Name: Dar AL Hijrah Madinah, Project of MOF.

(September 2014 To January 2019)

Operate PWS (Project Web Site) to upload and download all types of documents and coordinate with the other projects through electronic and telephonic media.

Al Fouzan Trading and Construction Co {Document Controller}

(January 2013 To August 2014)

Project Name: Governmental Complex Makkah, Project of MOF. submitting all shop drawings, Material submittal, RFI & Sample to Consultant and maintain logs with complete history of the drawings, material and samples .Review comments and approval received from consultant and distributing to respective discipline for updating. Al Fouzan Trading and Construction Co {Secretary / Document Controller}

(January 2010 To December 2012)

Project Name : Imam Ibne Saud Islamic University Riyadh Maintain an efficient filing system for easy reference of catalogues, technical data, correspondences and other office routine files. Khatib & Alami Consultants {Secretary / Document Controller} Project Name: King Abdullah Medical City Makkah, Project of MOH.

(October 2006 To October 2009)

Maintain an efficient filing system for easy reference of catalogues, technical data and other office routine files.

SOFTWARE SKILLS

Language: English, Arabic, Urdu. (Read & write)

Valid transferable Iqama

Driving License Available

85%

45%

85%

MS Office

AutoCad

Project Web

Site (PWS)



Contact this candidate