Highway Design Engineer

Location:
Manama, Capital Governorate, Bahrain
Salary:
BD3,000
Posted:
February 23, 2020

Contact this candidate

Resume:

NAME : Wan Badrulhisham bin Wan Badaruz-zaman

DATE OF BIRTH : 16th November 1968

PLACE OF BIRTH : Kuala Lipis, Pahang

MARITAL STATUS : Married

LANGUAGES SPOKEN & WRITTEN : Bahasa Malaysia and English NATIONALITY : Malaysian

CORRESPONDENCE ADDRESS

PERMENANT ADDRESS

:

:

Flat 12, Building 653, Road 321, Block 103, Hidd,

Bahrain.

E-3-2 Pesona Villa, Jalan Melati Indah 1, Saujana Melawati 53100 Kuala Lumpur

CONTACT NUMBER : +973-******** (Bahrain Mobile) & +601*-***-**** (Malaysia Mobile), email : adbxnw@r.postjobfree.com

YEARS OF EXPERIENCE : 31 Years (approx. 17 years as an Engineer and 14 years as a Technical Assistant)

QUALIFICATIONS : Bachelor of Civil Engineering 2003 (University Technology Malaysia) Diploma of Civil Engineering 1989 (University Technology Malaysia) MEMBERSHIP : Board of Engineers, Malaysia (43982 R) KEY EXPERIENCE : Mr Wan Badrulhisham has extensive experience gained over last 31 years on roads and highway, particularly on Road Design. He has carried out extensive design works for upgrading, improvements and new road for numerous projects along federal/major roads in urban and rural area. He is an experienced user for Moss/MXRoad and Microstation/Geopak (a reputable civil engineering software) in designing roads, earthworks and other related geometries.

Prior to joining Ministry of Works, Kingdom of Bahrain in March 2012, he had acquired experience in Road Design during his term of service with Ranhill Bersekutu Sdn Bhd from September 2002 to February 2012 and was involved in the implementation of some major and high-profiled projects in Malaysia including the South Klang Valley Expressway (SKVE), Senai-Desaru Expressway (E22) & Central Spine Road (CSR). He also has acquired experiences in Road Design and Road Safety Audit during his term of service with Jurutera Perunding Zaaba from October 1996 to August 2002 and has acquired experiences in Road Maintenance and Project Management during his term of service with Jabatan Kerja Raya Jerantut from March 1991 to February 1996. WORKING EXPERIENCE

FROM MARCH 2012 TO PRESENT

Employer : MINISTRY OF WORKS, KINGDOM OF BAHRAIN

Position Held : Senior Engineer

Duties :

1. Prepare preliminary and detailed design drawings for road projects according to the requirements using Microstation Software. 2. Prepare design program and preliminary budget estimates for each project.

3. Obtain road assessment report, Soil Investigation reports and Land Information for the design projects.

4. Issue Planning Permissions and / or Wayleaves for projects as necessary and follow up with the services to complete approvals. WORKING EXPERIENCE

(Continued)

WBWB Page 2 of 7

Duties (cont’d)

5. Liaise with other Service Ministries regarding the effect of the design project on their activities and requirements. 6. Consult with surveying Department to obtain information for the design.

7. Supervise the allocated team of Design Engineer/Technicians and ensure that they are performing their duties and responsibilities accurately and efficiently.

8. Consult with Design Manager/Head of Section regarding the varying aspects of the Design.

9. Submit final detailed drawings to top management for their review and comments and arrange for pre-handover meeting. 10. Prepare land interest plans for the affected lands and follow up with the land unit to ensure timely completion of acquisition matters.

11. Submit final drawings to the Quantity Surveying Department for estimation and tendering. Follow up regarding their requirements for quantifying and production of tender documentation. Project Involved : 1. Improvement of Um Al Na’san Avenue (Dual Carriageway)

(Cost Estimate: BD2,300,000)

2. Improvement of Road 5754, Block 457, Buqwah (Dual Cway)

(Cost Estimate: BD1,500,000)

3. Improvement of Road 3410 & 4103, Riffa, Block 941 (Dual Carriageway) (Cost Estimate: BD2,500,000)

4. Link Road Between Hunayniah Avenue and Muasker Highway

(Dual Carriageway) (Cost Estimate: BD4,000,000)

5. Car Park at Government House, Manama

(Cost Estimate: BD350,000)

6. Several Junction Improvement along Sh. Jaber Al Ahmed Al Subah Highway (Avenue 1 junction, Sitra Mall junction & Nabih Saleh junction) (Cost Estimate: BD200,000)

7. Additional lanes at Junction Sh. Salman Avenue / Airport Avenue.

(Cost Estimate: BD200,000)

8. Junction Improvement at North Manama Causeway/Entrance 4, Bahrain Bay, Block 346, Manama (Cost Estimate: BD120,000) FROM SEPT. 2002 TO FEBRUARY

2012

Employer : RANHILL BERSEKUTU SDN BHD

Position Held : Lead Engineer (September 2009 – February 2012) Senior Engineer (July 2007 – August 2009)

Engineer (July 2003 – June 2007)

Designer (September 2002 – June 2003)

Project Involved – Nov 2010 to

December 2011

Local Infrastructure Works and Services for 20,000 Units of Residential Apartments in Benghazi, Libya (Contract Value: RM 1.3 billion)

Duties Involved in preliminary design of major and local roads including at-grade junctions and roundabout by using MOSS/MX Road Design Software.

WORKING EXPERIENCE

(Continued)

WBWB Page 3 of 7

Project Involved – Nov 2010 to

December 2011

Local Infrastructure Works and Services for 20,000 Units of Residential Apartments in Benghazi, Libya (Contract Value: RM 1.3 billion)

Duties Involved in preliminary design of major and local roads including at-grade junctions and roundabout by using MOSS/MX Road Design Software.

Project Involved – Sept 2009 to Feb

2012

: East Coast Economic Region (ECER) Project – Federal Road 8 & 9

“Central Spine Road” – Pakej 2 : Sg Lakit Bridge to Gua Musang The project is to upgrade the 63km of existing single carriageway to a dual carriageway according to JKR R5 Standard inclusive of the grade separated interchanges and junction improvement. Cost of Works estimated to be RM 400Mill.

Duties :

Checking survey data to ensure the data is accordingly to MOSS GENIO format as stated in Terms of Reference and the workability of the data for design.

Responsible to carried out the preliminary study to determine the best suite alignment and detailed engineering design for the project using MOSS/MXRoad Design Software.

Preparation of cost estimate.

Project Involved – July 2008 to March

2011

: Privatisation of the Senai – Pasir Gudang – Desaru Expressway A RM1.2 Billion, 77km, R6 Standard, 4 lane free flow highway serving as the main approach to the Desaru coastal region with a connector to the Pasir Gudang Federal Highway. The Expressway divided into 3 packages i.e. Package 1, Package 2 and Package 3 with 5 grade separated interchanges, 4 toll plazas, a long span cable stayed bridge over Johor River and 2 nos. Rest & Service Area.

Duties :

As Lead Engineer and assistant to Project Manager on construction site issues.

Responding the Design Change Request (DCR) and review horizontal and vertical alignment to suit site condition using MOSS/MXRoad Design Software.

Project Involved – July 2007 to Jun

2008

: Layang Rest & Service Area (West & East Bound) for Senai – Desaru Expressway

A 6 million project comprises of Sub-Station building, external water reticulation, sewerage reticulation, Sewerage Treatment Plant, external electrical and telephone services and other associated works. Duties :

As Senior Engineer and assistant to Project Manager on coordinating the design development with the architectural, civil, structural, mechanical and electrical disciplines.

Coordination and liaising with Client with regards to submission and approvals.

Project Involved – June 2006 to June

2007

: South Klang Valley Expressway (SKVE) – Section 1B & 3 A RM900 Million, 43km, U6 Standard, 4 lane free flow highway serving as the southern approach to West Port, Klang. This project comprises Section 1B, Section 2 and Section 3 with 5 grade separated interchanges, 6 toll plazas, 2 long box girder river bridge crossings and 4 Rest & Service Area.

Duties :

Carry out conceptual and preliminary engineering design for mainline, Interchanges and toll plazas using MOSS/MXRoad Design Software.

Preparation of bills of quantities and cost estimate. WORKING EXPERIENCE

(Continued)

WBWB Page 4 of 7

Project Involved – March 2006 to May

2006

: Proposed Construction and Completion Earthwork and Other Associated Works for the Approach Embankments of Bridge No. 25

The project is to construct approach embankments of the Bridge 25 across North South Expressway and other associated works. (Contract Value : RM2.72 Million)

Duties : Carry out detailed engineering design for approach embankment.

Preparation of bills of quantities and cost estimate. Project Involved – May 2005 to Feb.

2006

: North South Expressway Pendang Interchange and Toll Plaza Phase 2 (Main Works) : (Contract Value : RM26.4 Million) Duties :

Carry out revised construction drawings for interchanges and toll plaza using MOSS/MXRoad Design Software.

Review drainage design and advised Resident Engineer on the changes to suit site condition.

Project Involved – Sept. 2003 to April

2005

: Upgrading of Federal Route 5 (FR 5) from Masjid Tanah to Tanjung Keling, Melaka

The project is to upgrade the 18km existing road to R5 Standard inclusive of the junction improvement.

Duties : Checking survey data to ensure the data is accordingly to MOSS GENIO format as stated in Terms of Reference and the workability of the data for design.

Carry out preliminary engineering design for main alignment and junctions using MOSS/MXRoad Design Software.

Preparation of bills of quantities and cost estimate. Project Involved – Aug.2003 to March

2005

: Besut Flood Mitigation Project

Part of this project is to provide access road (1.5 km length, R1 Standard) into the barrage.

Duties : Carry out detailed engineering design for access and internal road using MOSS/MXRoad Design Software.

Preparation of bills of quantities and cost estimate. Project Involved – Jan. 2005 to March

2005

: Proposed Upgrading of FR51 – Seremban to Kuala Pilah Duties : Assisting the Lead Engineer in preparing the conceptual geometric design for the proposal and presentation.

Project Involved – Sept. 2002 to Aug.

2005

& July 2008 to

Present

: Proposed Traffic Dispersal at the Vicinity of Jln Tun Sambanthan for the Development of KL Sentral, Malaysia

A RM57 Million project cost, U3 Standard, total length of 3km ramps comprises of a dedicated elevated structure from KL Sentral and Jalan Travers to Jalan Syed Putra towards Petaling Jaya and KL City (Ramp 1,2 &3). Also improvement of Seputeh Interchange which includes Loop Ramp, Directional Ramp and left slip Ramp (Ramp 4,5,6,7 & 8). Duties :

Carry out detailed geometrical design for elevated ramps and at grade junctions using MOSS/MXRoad Design Software

Assistant to Project Manager for headquarters support during construction.

Preparation of bills of quantities and cost estimate for detail engineering design.

Review horizontal and vertical alignment and advised Resident Engineer on the changes to suit site condition.

Attend Monthly Progress Meeting.

WORKING EXPERIENCE

(Continued)

WBWB Page 5 of 7

FROM SEPTEMBER 1996 TO

AUGUST 2002

Employer : JURUTERA PERUNDING ZAABA SDN BHD & TRARS CONSULT SDN BHD (JPZ Group of Companies)

Position Held : As Technical Assistant at Jurutera Perunding Zaaba Sdn Bhd and an Assistant Road Safety Auditor at Trars Consult Sdn Bhd. JURUTERA PERUNDING ZAABA SDN BHD

Project Involved : Upgrading of Federal Route 8 from Bentong to K.Lipis (Package 2)

(R5 Standard, 30km length, Project Cost : RM30 Million) Duties :

Assisting the Project Engineer in revising the design, preparing bill of quantities and tender document.

Assisting to Project Engineer for headquarters support during construction.

Attend Monthly Progress Meeting.

Project Involved : Proposed Trumpet Interchange from Federal Route 1 to Pasar Borong, K.Lumpur (Project Cost : RM50 Million)

Duties : Assisting the Project Engineer in the design of drainage and signages.

Project Involved : Realignment and upgrading of Route B15 at Putrajaya dan Cyberjaya.

Duties : Carry out detailed engineering design for major junctions and road furnitures.

Project Involved : Upgrading of Federal Route FT001 from Johor Bahru to Simpang Pontian, Johor (Project Cost : RM80 Million)

Duties : Carry out detailed engineering design for major junctions and road furnitures.

Project Involved : Upgrading of Felda Sg. Retang Road in Jerantut, Pahang Darul Makmur (Project Cost : RM5 Million)

Duties : Carry out road furniture design for main alignment. Project Involved : Proposed Upgrading of FR51 – Seremban to Kuala Pilah, Negeri Sembilan (Project Cost : RM250 Million)

Duties : Carry out detailed engineering design for major junctions and road furnitures.

Project Involved : Internal Road for MLRS in Gemas, Negeri Sembilan. Duties : Carry out detailed engineering design for internal road and junction using MOSS Design Software.

for TRARS CONSULT SDN BHD

Duties : Assisting the Road Safety Auditor in carrying road safety auditing for road projects which includes the following;

Identify the road safety deficiencies and suggest corrective treatments that can be taken to rectify the safety deficiencies.

Analysis the performance of the proposed junctions in term of traffic serviceability through out the design period by using traffic software package called SIDRA.

WORKING EXPERIENCE

(Continued)

WBWB Page 6 of 7

Project Involved : 1. Road Safety Audit for Upgrading of Federal Route from Temerloh- Mentakab, Pahang. (Project Cost: RM20 Million) 2. Road Safety Audit for Upgrading of Federal Route from Kuala Terengganu to Kuantan, Km 97 – Km 108, Terengganu.

(Project Cost : RM30 Million)

3. Road Safety Audit for Federal Route from Jerantut to Maran

(Project Cost : RM40 Million)

4. Road Safety Audit for Upgrading of Fedral Route FT001 from Seremban to Senawang, Ampangan, Negeri Sembilan. (Project Cost : RM60 Million)

MARCH 1996 TO AUGUST 1996

Employer : ADVANCED ROAD TECHNOLOGIES SDN BHD

Position Held : As an Assistant Construction Manager at the Sole Distributor company for soil stabilisation additives called Perma-Zyme 11X. Duties :

Pavement / road shoulder design using Perma-Zyme 11X.

Monitoring of progress and quality control of stabilisation works.

Marketing of Perma-Zyme 11X.

Project Involved : 1. Stabilisation of Road Shoulders on Federal Route 2 in Maran, Pahang.

2. Stabilisation of Road Shoulders in Alor Setar, Kedah. 3. Stabilisation of Road Shoulders on Federal Road 1 in Ulu Bernam, Hulu Selangor.

4. Stabilisation of Earth Haulage Road in Sungai Buloh, Selangor. 5. Stabilisation of Steel Fabrication Yard at Batang Kali, Selangor. 6. Stabilisation of Road Shoulders on Federal Route 109 in Teluk Intan, Perak.

MARCH 1991 TO FEBRUARY 1996

Employer : JABATAN KERJA RAYA, JERANTUT, PAHANG

Position Held : As a Technical Assistant and assistant to District Engineer on road maintenance works.

Duties :

Responsible for the planning, overseeing and preparing annual budget for road maintenance works of state and federal roads in the district of Jerantut which is about 330 km.

Responsible for roadside developments in the district of Jerantut.

Responsible for monitoring of progress and quality control of works in the road construction.

Project Involved : 1. Upgrading of State Road in Bkt. Ketupat, Jerantut 2. Resurfacing of State Road in Sg. Lekok, Jerantut 3. Upgrading of State Road in Pulau Tawar, Jerantut 4. Widening of State Road in Tembeling, Jerantut

WORKING EXPERIENCE

(Continued)

WBWB Page 7 of 7

Project Involved (cont’d) 5. Flyover crossing KTM Railway in Mela, Jerantut 6. Upgrading of Federal Route FR64 in Batu Balai, Jerantut DECEMBER 1989 TO FEBRUARY

1991

Employer : FORENSIC ENGINEERS SDN BHD

Position Held : Assistant Engineer

Duties : Assisting the project engineer in the structural design and preparing Bill of Quantities

Supervision of building construction.

Project Involved : 1. Proposed Factory on Lot 1012 in Gurun, Kedah 2. Proposed MRSM College in Kuantan

3. Proposed Petrol Station in Sri Hartamas, Damansara, K.Lumpur 4. Proposed Bungalow on Lot 156 at Jalan Lai Tek Lok, K. Lumpur 5. Proposed Terrace House on Lot 7838 in Petaling Jaya, Selangor 6. Proposed Al-Khairiah Mosque in AU3 Hulu Kelang, Selangor 7. Residence for a Member of the Brunei Royal Family, Beribi, Brunei Darussalam (Site Supervision for Structures Works).