JINS RAJAN V
Field Piping Engineer
adbwb5@r.postjobfree.com
adbwb5@r.postjobfree.com
VIZAG, INDIA
CAREER SUMMARY & SKILLSETS
More than 11 years of international experience in Oil and Gas Engineering, Procurement, Construction and commissioning ( EPCC ) industry as a Construction engineer, Field Piping Engineer & Site Engineer with knowledge and expertise in various project construction and commissioning activities of projects related to Oil storage tank, Refinery, Onshore Oil / Gas operation plants, petro chemicals, Pipelines / Piping, Oil terminals and matrix manifold. Process piping Pipeline Storage tanks
Revamp projects Regeneration plant Insulation
NDRC
Ship loading &unloading facilities
Port matrix manifold
Hydro test & pre-commissioning Commissioning Method statement & procedures Blasting & coating Engineering Queries/Dossier
Monitoring subcontractor work and
Invoice
Currently working as Field Piping Engineer with TECHNIP INDIA LTD. PROFESSIONAL EXPERIENCE SUMMARY
SL
#
PROJECTS
CLIENT
PERIOD
LOCATION
1
EPCC 5 & 4 Package for revamp units
(NHT- CCR,DHT,FCC-NHT & NIU) VISAKH
REFINERY MODERNISATION PROJECT
HINDUSTAN PETROLIUM
CORPORATION LIMITED
2018 / SEP – Present Vizag. INDIA
2
EPC for Pipeline works for Petroleum
Regeneration and Processing Facility at
Fujairah FreeZoneJ-5053
CYLINGAS/ECOMAR
2017/FEB - JULY 2018
Fujairah Oil Industrial
Zone, Port of Fujairah,
UAE.
3
Electro Mechanical works-IGD-E(PHASE-
1)Package 3 Onshore Pipeline in
Habshan
TECHNICASREUNIDAS,
GASCO
2016/SEP–2017/FEB
Habshan, AbuDhabi,
4
Construction, Erection of Structure, Piping
and Installation of Equipment work for
VLCC JETTYNo.1
ROTARYENGG.PORT
2015/SEP–2016/SEP
Port of Fujairah, UAE.
5
Engineering, Construction, works of
Mechanical & Piping for SHARAFCO
STORAGE TERMINAL.
SHARAFCO
PETROLEUM FZE
2016/JAN–2016/JUL
Hamriyah Free Zone
Sharjah, UAE.
6
AEGEAN NEW FUEL OIL TANK FORM
AEGEAN
2012/NOV-
2015/AUG
Fujairah Oil Industrial
UAE.
7
Natural gas/LPG supply piping
Luxury Real Estate
Development
2012/FEB-2012/JUL
REEM ISLAND
AbuDhabi, UAE
8
Natural gas/LPG supply piping
DAMAC Abudhabi
Properties
2011/JUL-2012/FEB
REEM ISLAND
AbuDhabi, UAE
9
LPGstorage, truck loading & unloading
piping. Firefighting system.
Steel Authority of India
2011JAN/-2011JUN
Salem,India
10
Boilerhousepiping&equipment’ser
ection
Tamil nadu Paper
mill limited
2010/NOV–
2011/JAN
Karoor,India
11
LPG storage and filling station
Total Gaz india limited
2010/JUL–2010
Mangalore,India
12
High pressure well piping & process
piping
ONGC,TATA Projects
2009/JUN-2010JUL
AndhraPradesh,India
13
Sea water pumping station & cooling
water supply piping
Nuclear Power
corporation of India
2008/JUN-
2009/MAY
KudanKulam,India
JOBPROFILE
Project planning, review of project specification andP&ID. Handling all piping technical queries. Raising MTO for all materials requiredto additional materials for hydrotest. Piping and pipe support installation in accordance with scheduled. Monitoring the daily work activities andupdating daily and weekly progress report. Counter checking by Isometric drawing/ piping plan for the spool erected in the correct location, orientation, alignment and plumpness.
Preparation of ASBUILT drawings, field piping system test packages including system limiton P&ID and piping isometrics. Carrying out mechanical clearance, conducting hydro and pneumatic tests, fulfilling commissioning and pre-commissioning requirements.
Line checking after hydro test to complete the post punch list to sign off the test packages before completion of mechanical activities.
Leadership skills with experience in managing crews of upto100 Reviews the Scope of Work to assess manpower requirements, gains approval for securing of necessary resources.
Attends project kick off meeting to gain appreciation and understanding of project and to provide Engineering input.
Checks all project drawings, documentation, calculations, the PR, technical valuations and manpower estimates to ensure accuracy and completeness.
Co – ordinates activities under own responsibility with other disciplines to ensure effective progress and avoid duplication of effort.
Overall Supervision of including such as:
HSE, House Keeping, piping prefabrication including pipe supports, piping rections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore. Schedule monitoring for manpower rmobilization welding Dia-inch, No. of spools and Pipe Supports. Piping internal inspection witness for large bore piping. FollowUp of punch work.
EDUCATION
B.Tech in MECHANICAL ENGINEERING– Swamy Karthikeyan Vedic Vishva vidyalaya.
(2012 – 2015)
DiplomainMechanicalEngineering–Governmentpolytechniccollege,Nagercoil.(2005– 2008)
ASNT level 2(RT,UT,MPT,DPT )
Auto cad
PERSONALDETAILS
Date ofBirth:28-06-1988 Sex :Male
Marital Status: Married Nationality : Indian
Computer Proficiency: Primavera & MS Office Driving License: Valid INDIA Passport Number Old: H 9729174 Passport Number New: U4207926 Passport Date of expiry : 02/ 01/ 2030
Languages known: English, Tamil, Hindi, Malayalam & Telugu. PROJECT SUMMARY
PROJECT: EPCC 4 & 5 Packages for revamp units (NHT- CCR, DHT, FCC- NHT & NIU) Visakh refinery modernization project. HPCL.
DETAILS: EPCC works for new equipment’s erection and replace old equipment’s related Piping, structural works to increase the production.
PROJECT: EPC for Pipeline works for Petroleum Regeneration and Processing Facility at Fujairah Free Zone j-5053
DETAILS: EPC works of Pipeline and Piping from Fujairah Port FOTT- MLA to Ecomar Facility Tank farm PLR.4 Lines 1800mAG(FOTT&POF)+1500mUG,lineare(1x24”,2x20”& 1x8”).Engineering of Civil, structural, Pipeline and Mechanical Deliverables. Procurement and Installation of Pipes, Fittings, Valves and Stripping Pumps. Construction work are Excavation & Backfilling, NDRC, Pipe &Structure prefabrication, Painting &erection, Welding and Insulation work of 3300m.Pre-commissioning and Commissioning of Flow lines andcommissioning of Rotary equipment- stripping Pump.
PROJECT: Electro-Mechanical Works of IGD-E (Phase-1) Package 3 Onshore Pipeline and HABSHAN Modification Project.
DETAILS: Steel Structures Erection, Fireproofing Works (including the Materials Supply),Piping Works, Equipment Erection, Painting and Insulation Works (including the Materials Supply), Electrical and Instrumentation Works, and the FireFighting System erection, both at the existing and the New Units. Piping of More than 315000 Inchdia. And 5000 Tons of Structural Steel work (Approximate quantities). The new Units are: Unit510: NEBSlugCatcher(New), Unit510: IGD-E Pipeline Scraper Receiver and Condensate Pipeline Scraper Launcher,Unit510: Stripper Over head Compressors(New), Unit511A/B: Stripper and Depentanizer Trains 1 and 2(New), Unit517: Substation(New), Unit 562: Boiler Area(New)and Modification work of other Existing units. PROJECT: Supply, Fabrication, Construction, Erection of Structure, Piping and Installation of Equipment work for VLCC JETTY No.1 at Fujairah
DETAILS: Very Large Crude Carrier Jetty Construction for OilTankers. Morethan 70000 (Inchdia.) of Pipe Fabrication, Welding Erection and Painting, Morethan 1200 (MetricTons) of Structural Steel Fabrication, Welding Erection & Painting. 2.7 km of Break water roads–Piping and 9Nos Structural steel loops, 90 Meter Access Trestle,6 Pipelines includes 2x40” line with Hydro-testing and Pigging. Equipment Installations–PLRs, Pressure Vessels, Pumps, Over Head Crane, Marine Loading Arm, and Gang way Tower, Fire & Security Equipment’s, Valves. Pre- commissioning and Hydro-testing.
PROJECT: Detail Engineering, Fabrication, and Installation and Erection works of Mechanical & Piping for SHARAFCO STORAGE TERMINAL at Hamriyah Free Zone Sharjah. DETAILS: Sharafco Storage Terminal Tank Farm Piping. Detailed Engineering from FEED to development to fall Process, Piping, Mechanical Drawings deliverables for Piping and Structural works. More than 38000(Inch dia.) of Pipe Fabrication, Welding, Erection and Painting. More than 35 (MetricTons) of Structural Steel Fabrication, Welding, Erection and Painting. Equipment installation-PLRs,Pumps and Valves. Under Ground flow line works, Pigging Pit & Bunker Pit Structural/ Piping work for Main Harbor & Inner Harbor.Pre-commissioning and Hydro-testing. PROJECT: EPC work of new oil storage and connected to port of Fujairah Existing matrix manifold .TIE-IN FOR existing black oil header and white oil header. AT Fujairah Oil Industrial Zone (FOIZ). Fujairah, UAE. DETAILS: Site survey work, Topographical & Geotechnical survey. Engineering development of Process, Piping, Pipeline, Civil, Electrical, Instrumentation and HSE drawing deliverables. Procurement of Civil and Structure bulk items and Mechanical, Electrical and Instrumentation Material includelead items. Construction-Prefabrication of Piping Spools. Excavation and UG Flowline work according to Piping routing layout and Installation of Pre- cast Trench. Pipeline- Spool installation, Welding, and Hydro- testing. E&I –Cable installation, Field instrument installation, Valve installation, Tie-in works.15 nos vertical oil storage tank (49.2 M dia & 23 M height) fabrication and erection with aluminium doom roof and internal floating duct.2 nos horizontal slop oil tank fabrication and erection. Heavy fuel oil pipeline with heat raising pipping. Pump house and high pressure pump installation, commissioning for heavy fuel oil and light Fuel oil.Truck loading arrangement. Boiler and boiler accessories erection & commissioning. PL/R erection and piping, pipeline,tanks commissioning.