Post Job Free

Resume

Sign in

Piping Engineer

Location:
Posted:
February 20, 2020

Contact this candidate

Resume:

JINS RAJAN V

Field Piping Engineer

adbwb5@r.postjobfree.com

adbwb5@r.postjobfree.com

+91-809*******

VIZAG, INDIA

CAREER SUMMARY & SKILLSETS

More than 11 years of international experience in Oil and Gas Engineering, Procurement, Construction and commissioning ( EPCC ) industry as a Construction engineer, Field Piping Engineer & Site Engineer with knowledge and expertise in various project construction and commissioning activities of projects related to Oil storage tank, Refinery, Onshore Oil / Gas operation plants, petro chemicals, Pipelines / Piping, Oil terminals and matrix manifold. Process piping Pipeline Storage tanks

Revamp projects Regeneration plant Insulation

NDRC

Ship loading &unloading facilities

Port matrix manifold

Hydro test & pre-commissioning Commissioning Method statement & procedures Blasting & coating Engineering Queries/Dossier

Monitoring subcontractor work and

Invoice

Currently working as Field Piping Engineer with TECHNIP INDIA LTD. PROFESSIONAL EXPERIENCE SUMMARY

SL

#

PROJECTS

CLIENT

PERIOD

LOCATION

1

EPCC 5 & 4 Package for revamp units

(NHT- CCR,DHT,FCC-NHT & NIU) VISAKH

REFINERY MODERNISATION PROJECT

HINDUSTAN PETROLIUM

CORPORATION LIMITED

2018 / SEP – Present Vizag. INDIA

2

EPC for Pipeline works for Petroleum

Regeneration and Processing Facility at

Fujairah FreeZoneJ-5053

CYLINGAS/ECOMAR

2017/FEB - JULY 2018

Fujairah Oil Industrial

Zone, Port of Fujairah,

UAE.

3

Electro Mechanical works-IGD-E(PHASE-

1)Package 3 Onshore Pipeline in

Habshan

TECHNICASREUNIDAS,

GASCO

2016/SEP–2017/FEB

Habshan, AbuDhabi,

4

Construction, Erection of Structure, Piping

and Installation of Equipment work for

VLCC JETTYNo.1

ROTARYENGG.PORT

2015/SEP–2016/SEP

Port of Fujairah, UAE.

5

Engineering, Construction, works of

Mechanical & Piping for SHARAFCO

STORAGE TERMINAL.

SHARAFCO

PETROLEUM FZE

2016/JAN–2016/JUL

Hamriyah Free Zone

Sharjah, UAE.

6

AEGEAN NEW FUEL OIL TANK FORM

AEGEAN

2012/NOV-

2015/AUG

Fujairah Oil Industrial

UAE.

7

Natural gas/LPG supply piping

Luxury Real Estate

Development

2012/FEB-2012/JUL

REEM ISLAND

AbuDhabi, UAE

8

Natural gas/LPG supply piping

DAMAC Abudhabi

Properties

2011/JUL-2012/FEB

REEM ISLAND

AbuDhabi, UAE

9

LPGstorage, truck loading & unloading

piping. Firefighting system.

Steel Authority of India

2011JAN/-2011JUN

Salem,India

10

Boilerhousepiping&equipment’ser

ection

Tamil nadu Paper

mill limited

2010/NOV–

2011/JAN

Karoor,India

11

LPG storage and filling station

Total Gaz india limited

2010/JUL–2010

Mangalore,India

12

High pressure well piping & process

piping

ONGC,TATA Projects

2009/JUN-2010JUL

AndhraPradesh,India

13

Sea water pumping station & cooling

water supply piping

Nuclear Power

corporation of India

2008/JUN-

2009/MAY

KudanKulam,India

JOBPROFILE

Project planning, review of project specification andP&ID. Handling all piping technical queries. Raising MTO for all materials requiredto additional materials for hydrotest. Piping and pipe support installation in accordance with scheduled. Monitoring the daily work activities andupdating daily and weekly progress report. Counter checking by Isometric drawing/ piping plan for the spool erected in the correct location, orientation, alignment and plumpness.

Preparation of ASBUILT drawings, field piping system test packages including system limiton P&ID and piping isometrics. Carrying out mechanical clearance, conducting hydro and pneumatic tests, fulfilling commissioning and pre-commissioning requirements.

Line checking after hydro test to complete the post punch list to sign off the test packages before completion of mechanical activities.

Leadership skills with experience in managing crews of upto100 Reviews the Scope of Work to assess manpower requirements, gains approval for securing of necessary resources.

Attends project kick off meeting to gain appreciation and understanding of project and to provide Engineering input.

Checks all project drawings, documentation, calculations, the PR, technical valuations and manpower estimates to ensure accuracy and completeness.

Co – ordinates activities under own responsibility with other disciplines to ensure effective progress and avoid duplication of effort.

Overall Supervision of including such as:

HSE, House Keeping, piping prefabrication including pipe supports, piping rections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore. Schedule monitoring for manpower rmobilization welding Dia-inch, No. of spools and Pipe Supports. Piping internal inspection witness for large bore piping. FollowUp of punch work.

EDUCATION

B.Tech in MECHANICAL ENGINEERING– Swamy Karthikeyan Vedic Vishva vidyalaya.

(2012 – 2015)

DiplomainMechanicalEngineering–Governmentpolytechniccollege,Nagercoil.(2005– 2008)

ASNT level 2(RT,UT,MPT,DPT )

Auto cad

PERSONALDETAILS

Date ofBirth:28-06-1988 Sex :Male

Marital Status: Married Nationality : Indian

Computer Proficiency: Primavera & MS Office Driving License: Valid INDIA Passport Number Old: H 9729174 Passport Number New: U4207926 Passport Date of expiry : 02/ 01/ 2030

Languages known: English, Tamil, Hindi, Malayalam & Telugu. PROJECT SUMMARY

PROJECT: EPCC 4 & 5 Packages for revamp units (NHT- CCR, DHT, FCC- NHT & NIU) Visakh refinery modernization project. HPCL.

DETAILS: EPCC works for new equipment’s erection and replace old equipment’s related Piping, structural works to increase the production.

PROJECT: EPC for Pipeline works for Petroleum Regeneration and Processing Facility at Fujairah Free Zone j-5053

DETAILS: EPC works of Pipeline and Piping from Fujairah Port FOTT- MLA to Ecomar Facility Tank farm PLR.4 Lines 1800mAG(FOTT&POF)+1500mUG,lineare(1x24”,2x20”& 1x8”).Engineering of Civil, structural, Pipeline and Mechanical Deliverables. Procurement and Installation of Pipes, Fittings, Valves and Stripping Pumps. Construction work are Excavation & Backfilling, NDRC, Pipe &Structure prefabrication, Painting &erection, Welding and Insulation work of 3300m.Pre-commissioning and Commissioning of Flow lines andcommissioning of Rotary equipment- stripping Pump.

PROJECT: Electro-Mechanical Works of IGD-E (Phase-1) Package 3 Onshore Pipeline and HABSHAN Modification Project.

DETAILS: Steel Structures Erection, Fireproofing Works (including the Materials Supply),Piping Works, Equipment Erection, Painting and Insulation Works (including the Materials Supply), Electrical and Instrumentation Works, and the FireFighting System erection, both at the existing and the New Units. Piping of More than 315000 Inchdia. And 5000 Tons of Structural Steel work (Approximate quantities). The new Units are: Unit510: NEBSlugCatcher(New), Unit510: IGD-E Pipeline Scraper Receiver and Condensate Pipeline Scraper Launcher,Unit510: Stripper Over head Compressors(New), Unit511A/B: Stripper and Depentanizer Trains 1 and 2(New), Unit517: Substation(New), Unit 562: Boiler Area(New)and Modification work of other Existing units. PROJECT: Supply, Fabrication, Construction, Erection of Structure, Piping and Installation of Equipment work for VLCC JETTY No.1 at Fujairah

DETAILS: Very Large Crude Carrier Jetty Construction for OilTankers. Morethan 70000 (Inchdia.) of Pipe Fabrication, Welding Erection and Painting, Morethan 1200 (MetricTons) of Structural Steel Fabrication, Welding Erection & Painting. 2.7 km of Break water roads–Piping and 9Nos Structural steel loops, 90 Meter Access Trestle,6 Pipelines includes 2x40” line with Hydro-testing and Pigging. Equipment Installations–PLRs, Pressure Vessels, Pumps, Over Head Crane, Marine Loading Arm, and Gang way Tower, Fire & Security Equipment’s, Valves. Pre- commissioning and Hydro-testing.

PROJECT: Detail Engineering, Fabrication, and Installation and Erection works of Mechanical & Piping for SHARAFCO STORAGE TERMINAL at Hamriyah Free Zone Sharjah. DETAILS: Sharafco Storage Terminal Tank Farm Piping. Detailed Engineering from FEED to development to fall Process, Piping, Mechanical Drawings deliverables for Piping and Structural works. More than 38000(Inch dia.) of Pipe Fabrication, Welding, Erection and Painting. More than 35 (MetricTons) of Structural Steel Fabrication, Welding, Erection and Painting. Equipment installation-PLRs,Pumps and Valves. Under Ground flow line works, Pigging Pit & Bunker Pit Structural/ Piping work for Main Harbor & Inner Harbor.Pre-commissioning and Hydro-testing. PROJECT: EPC work of new oil storage and connected to port of Fujairah Existing matrix manifold .TIE-IN FOR existing black oil header and white oil header. AT Fujairah Oil Industrial Zone (FOIZ). Fujairah, UAE. DETAILS: Site survey work, Topographical & Geotechnical survey. Engineering development of Process, Piping, Pipeline, Civil, Electrical, Instrumentation and HSE drawing deliverables. Procurement of Civil and Structure bulk items and Mechanical, Electrical and Instrumentation Material includelead items. Construction-Prefabrication of Piping Spools. Excavation and UG Flowline work according to Piping routing layout and Installation of Pre- cast Trench. Pipeline- Spool installation, Welding, and Hydro- testing. E&I –Cable installation, Field instrument installation, Valve installation, Tie-in works.15 nos vertical oil storage tank (49.2 M dia & 23 M height) fabrication and erection with aluminium doom roof and internal floating duct.2 nos horizontal slop oil tank fabrication and erection. Heavy fuel oil pipeline with heat raising pipping. Pump house and high pressure pump installation, commissioning for heavy fuel oil and light Fuel oil.Truck loading arrangement. Boiler and boiler accessories erection & commissioning. PL/R erection and piping, pipeline,tanks commissioning.



Contact this candidate