Professional Engineer with more than Ten (10) years of experience as Project Engineer

(Oil & Gas) field during Design, Procurement, and Construction phases and ensure Quality & Safety are met Saudi Aramco standards, having Electrical/Telecommunication

& E&I experiences of multiple Sites Projects.

ACADEMIC EDUCATION & MEMBERSHIPS:

Bachelors of Engineering in Electrical /Telecom Engineering. (Pakistan) Pakistan Engineering Council (PEC) Membership # ELECTRO/10089 Saudi Council of Engineering (SCE)-Membership # 180326 TRAININGS AND SKILLS:

Course of CCNA.

Course on (PLC) programmable logic control.

ISO 9001:2008 as Auditor/Lead Auditor.

Course on Dies & Mould Machines.

Familiarity with ISO-9001:2008 Quality Management System.

Familiar to SAES, SAEP, SATIP, SAIC and SAMSS, Schedule Q”.

Written and oral communication skills

Familiar to Telecom, Electrical, Instrumentation, and civil materials.

Valid Saudi Driving License

PROFESSIONAL EXPERIENCE:

Duration

Years

Name of Project – Saudi Aramco Employer Position Held September –

2017

to date

Saudi Aramco, Process Control system

upgrade and Replacement of Process

Analyzers (GAS Chromatographs) at

Shedgum Gas Plant (BI-10-016**-****) and

Uthmaniyah Gas Plant (BI-10-014**-****)

Schneider

Electric –

Invensys Saudi

Arabia

Sr. Project

Engineer

2016 - to

August-2017

Saudi Aramco, Replacement of Process

Analyzer at RTR, BI-10-009**-****:

RAS Tanura Refinery

NAIZAK GLOBAL

ENGINEERING

SYSTEM (NAIZAK)

Project Engineer

2014 to 2016 Saudi Aramco Leak Detection and Corrosion Monitoring system KSA - BI-10-006**-****: -

Eastern Region Location Include : BERRI

GAS PLANT, KHURSANIYAH, UTHMANIYAH

GAS PLANT, SHEDGUM GAS PLANT,

GOSP- AINDAR,KHUFF

MANIFOLDS,HARADH, HAWAIYAH.

Muhammad Ali A

Swailem company

(MASCO)

Project Engineer

2013 to 2014 Saudi Aramco Project Up gradation of

Network Security and Communication

System Facilities

BI-10-00669

Peaks Construction

Company

Project Engineer

Construction

Page 2 of 3

2011 to 2012 East West Pipelines Projects

Saudi Aramco

BI-10-000795

SAMEC Contracting

Company Jubail, KSA

Site Electrical

Engineer

2008-2011 Site Services Department Pak Datacom Limited Pakistan

Network

Engineer

Brief Description of the work:

VSAT and IDirect installation, configuration country wide design of complex network over WAN using Radio Modem, wireless Ethernet bridges, SCPC (Single Carrier per channel )

2006 to 2008 Telecommunication Industry ZJPTC Chinese communication

company.

Engineer

Brief Description of the WORK

Commissioning of Microwave Antenna for Mobile Networks RESPONSIBILITIES AS PROJECT ENGINEER/ CONSTRUCTION ENGINEER: 1) Develop project objectives by reviewing project proposals and plans conferring with management.

2) Interpreting client’s requirement, identifying and addressing design parameters, engineering problems, and ensuring solution are implemented. 3) Control project plan by reviewing design, specification and schedule changes recommendation actions.

4) Determine project responsibilities by identifying project phase and elements, assigning personnel to phase reviewing bids from contractor. 5) Determine project specification by studying product design, customer requirements and performance standards completing technical studies preparing cost estimation.

6) Monitoring, controlling & appraising the overall construction activities of contractor’s scope of work.

7) Weekly meetings with construction team and management to discuss the site difficulties and find their solutions.

8) Coordination with designing team in order to report/change any difficulty in the drawings not obeying the site conditions.

9) Maintain project schedule by monitoring project progress, construction activities. 10) Coordination with SAPMT & SAPID representative. 11) Preparing the schedule and responsible for estimating and arranging all kinds of site construction material.

Page 3 of 3

12) Ensuring all justifications for contractual variations during projects are prepared and maintained to support subsequent commercial claims. 13) Support evaluating, organizing and prioritizing work with in the overall project schedule.

14) Liaising and managing third party contractors to ensure all equipments are fit for the purpose.

15) Site surveillance on daily basis to check the safety and quality standards are meeting with client requirements.

OVERALL RESPONSIBILITIES ARE INCLUDED:

1) Testing, Installation and termination of (power instrumentation, telecommunication & grounding) cables as per SA approved drawings and standards. 2) Installation of all kinds of transmitter, elements valve gauge, transformer, Junction Box’s, RTU ‘Pedestals, switchgear (RIB) remote instrument building panels and other electrical equipment’s etc.

3) Monitoring the installation of different sizes of lighting system, fire alarm system and PA/PS in the substation.

4) Installation of lighting poles.

5) Overall lighting protection of the project.

6) Site surveillance to check the construction work and give comments if necessary according to standards.

7) Maintain & compile the documentation and records which is needed by SAPMT & SAPID.

8) Weekly meetings with Client have to discuss the site difficulties and the find solutions.

Personal Profile:

Name: Ahsan Raza

Passport No. : BK5179253

Nationality: Pakistani

Marital Status: Single

Contact No. : +92-033*-*******)/+92-034********) Pak Email Address: adbvnk@r.postjobfree.com;

References:

Will be furnished upon request.



Contact this candidate