Post Job Free

Resume

Sign in

Electro/Mechanical supervisor / QA QC Inspector/Maintenance supervisor

Location:
Quezon City, Philippines
Salary:
25000
Posted:
February 18, 2020

Contact this candidate

Resume:

Roberto D. Morales

Mobile: +639*********

Emai: adbuj4@r.postjobfree.com David St. Panday Pira DAU Mabalacat city, Pampangga. 2009

Profile:

MIDONG PHIL – MRT7 3RD RAILS SYSTEM Project, Quality Assurance, Quality Control, Preparation for Site visit / Inspection, Quotation, Method and material Statement, Job Risk Analysis, Materials and Manpower planning. Test and Inspection of materials. Installation of 3rd rail system, (stinger). Insert, Bolt, Jib, Bracket Brace, Conductor Rail, Midpoint,

Direct Current (DC) Positive & Negative Cable conductor rail installation and to Power panel. Depot to 14 Station

LRTA LINE II Railway Extension Project – OCS HEAD / Field Service Supervisor. Hands-on in AutoCAD Drawing and Concept Design. Installation of overhead power line. OCS Mast / Pole, Down guy, Counter Weight, FTA and WBA, Cantilever assembly, Messenger wire, Contact wire, Dropper wire, Lightning / Surge Arresters/I Section Insulator, Bridge / Non-Bridge Isolator, Stray Current on Plinth from Existing to Emerald Station and Masinag Station.

LRTA-LINE 2 - Maintenance in Rolling Stock division and OCS, Drives and operate, Man lift, Forklift, Operator of Railways heavy Equipment vehicles Unimog 501 and 502, Multi-purpose vehicle for Railways Maintenance.

ALSTOM/BETA - LRMC LINE I. Preparation for work plan list, P.O Purchasing tools and Materials list, Quotations. Method and Materials Statement. Depot Track 11. On-Board Installation of under frame signaling Device on Gen. 3 Train, Balise, Axle counter, AUX. Panel. ESW Way side, Permit Authorization and Documents submittal. Main line Site tracks side and station platforms Surveys, Coordination. Preparation of work force list tools, Installation of balise and axle counter in track rail, Signal light. DTI. Departure Time Indicator. Baclaran Station to Roosevelt Station

Career Summary:

July 29, 2018 – Present Hyundai Rotem / Midong Phil.

MRT-7 3RD RAIL SYSTEM – QA/QC Inspector

July 1st, 2018 – July 21, 2019 Alstom/Beta Electromechanical corporation Philippines

LRMC LRT LINE I – Signaling Test Engineer 08/01/18 – 11/07/2018

LRTA LINE-2 Extension Projects O.C.S HEAD 11/ 08/18 – 07/21/2019

February 1st, 2012 – September 19, 2017 Qatar Engineering Q-CON - Doha, Qatar

Electromechanical Supervisor 02/01/2013 – 09/21/2017

Electrical Foreman 02/01/2012 – 01/31/2013

March 5th, 2011 - October 22nd, 2011 BESIX Construction Co. - Equatorial Guinea, Africa

Electrical Supervisor

February 18th, 2010 - March 3rd, 2011 Al-Khatlhan Establishment - Riyadh, Saudi Arabia

Electrical Supervisor

July 8th, 2009 - December 15th, 2009 Samko International - Doha, Qatar

Electrical Supervisor

February 25th, 2008 - March 19th, 2009 Al Naboodah Engineering - Dubai, UAE

Senior Electrical Foreman

July 17th, 2006 - November 25th, 2007 Saudi Aramco Mobil Refinery - Yanbu, Saudi Arabia

Maintenance Electrical Foreman

February 10th, 2003 - June 30th, 2006 LRTA Line 2 - Santolan, Pasig City, Philippines

Senior Train Electrical Maintenance; O.C.S. Electrical Foreman

February 2000 - January 2003 TESPHIL MRT Line 3 - North Edsa, Philippines

T.P.S.S - Technician B - High Voltage Equipment

November 1999 - March 2000 SUMITOMO MRT Line 3 - North Edsa, Philippines

Comm Technology - Electrician

Professional Work Experience:

Hyundai rotem MIDONG PHIL – MRT7 3RD RAILS SYSTEM Project,

June 24. 2019 to November 15, 2019

MRT7 3RD RAILS SYSTEM- QA QC inspector

Quality Assurance, Quality Control, Preparation for Site visit / Inspection, Quotation, Method and material Statement,

Job Risk Analysis, Materials and Manpower planning. Test and Inspection of materials. Installation of 3rd rail system,

(stinger). Insert, Bolt, Jib, Bracket Brace, Conductor Rail, Midpoint, Direct Current (DC) Positive & Negative Cable

conductor rail installation and to Power panel. Depot to 14 Stations.

Alstom/Beta Electro Mechanical Corporation. Philippines,

August 1st 2018 – July 21st 2019

OCS HEAD / Field Service Supervisor L-II - Test Engineer L-I

LIGHT RAIL TRANSIT LINES - LINE II & I Extension Projects. (LRT I and II)

Alstom / BETA Railway Extension Project. Preparation for work force list, P.O Purchasing tools and Materials list, Site Surveys, Coordination, Permit Authorization and documents submittal. On-Board Installation of under frame signaling device for Gen 3, 1 & 2 LRT Train set, Signaling antenna. Install new unit for Signal and telecom, Balise, Axle counter, AUX. Panel. ESW Sideways Preparing for Working Permit on Mainline and Depot, Execute Job Plan assignments, Cable laying and cable Pulling. Demarcation for Aux Panel Installation, Installation of new Signaling Balise and counter axles, Install new Pole/Mast for Signaling light, Power cable laying,

Qatar Engineering Q-CON - Doha, Qatar

February 1st 2012 – September 19th 2017

Electro Mechanical Supervisor

QATALUM, QATAR PETROLEUM LUMP SUM and MAINTENANCE.

Preparation for Site visit Quotation, Method Statement, Job Risk Analysis and Job Hazard Analysis. Materials and Manpower Quotation, Lump Sum Job Quotation.

Maintenance of U.P.S unit (delta conversion, standby online and battery cell units, water top up and electrolyte checking, Supervise pot line 1 and 2, cast house, reduction area, cathode and anode baking, flux area and Rectifier station for electrical problems and troubleshooting; Maintenance and repair of automatic shutter door motor, relays, and control box relay and switch; Maintenance for 19 units of 5000kva, 1200kva, 750kva and 500kva diesel generators; Rewires and installs new equipment in 3-phase motor for filter and air blower. Motor repair and maintenance of 3-phase motor for water and fire pump;

Plans weekly and monthly roster of workers; Port Area, Pumping Station and Silo maintenance For Ship Un-loader. Gearbox shafting mechanical Fittings Repair and installation, Conveyor belt, motors, rollers, sensor, filters changing, Control repair and modification; Preventive Maintenance for Heavy Equipment Machinery. Repairing of motor starter of Diesel Generator 06kv, to 1500kv, Repairing of motor starter of Heavy Equipment Caterpillar, Miller. Repairing of Alternator and motor assembly, rotor, stator, coil winding, solenoid assembly Bearing, Perkins and Hitachi Grader, SDR single drum roller, Backhoe, Breaker, Pay loader, Mobile Crane, Bob caT, Skid loader, Bulldozer. Automotive electrical trouble shooting, lights, wiper, back light, forward reverse horn, beacon light. Signal light, head light, sensors, control board and Battery maintenance. Assisting Hydraulic and engine repair., Repair Conveyor Machine, Electric Overhead Crane, Motors.

Repairing of Motor Starter, Alternator for Mobile cranes, backhoe, Grader, welding generator, tower light, compressor, single and double rolling drum and Electrical parts. Electromechanical supervisor of Industrial plant, Refinery and building constructions; Inspection, testing and commissioning of electrical installations,

Qatar Petroleum – Project in-charge (PIC)

(QP) Multi-Purpose Berth (MPB) jetty maintenance. Loading Arm (1) ONE to FIVE (5) for naphtha, crude oil loading. APEX, LUFF, SLEW heavy-duty hoses checking and replacement Regulator valve and nitrogen replacing, PM for power pack hydraulic oil and filter, check function on pendant/ remote control from PLC, vent valve checking ERS test function manual and electrical. Operator Man lifts and Forklift. Job Requirements, (Licensed). Qatar Petroleum / Qatar Steel, Qatalum. PTW in QP Qatar Petroleum, Qatar Steel and Qatar Aluminum, Qatar Petroleum QP, P.T.W Level 1. Id #C10898.

BESIX Construction Co. - Equatorial Guinea, Africa

March 5th 2011 - October 22nd, 2011

Electrical Supervisor

Supervises installation of 11Kv cable for power supply / generator back-ups, UPS, data bank cable trays installing lightning arrester / protection;

Oversees setting-up of conduits for lighting fixtures, fire alarms, smoke detectors, panel board, switching

Device and modules; Performs Quality Assurance of termination of power cables to their respective

Panel and supply board; Installs pre-wired power and bus bar panel, control system, Layouts and

Installs cable tray cable trenching, Building Maintenance System (BMS), Conducts work force segregations,

Al-Khatlhan Establishment - Riyadh, Saudi Arabia

February 18th 2010 - March 3rd 2011

Electrical Supervisor

Works as an Electrical Supervisor for the King Abdullah petroleum science and research center project. Supervises installation from generator to respective plan/drawing allocation area, from 480 Kv generator to distribution panel, cable laying of 300mm, 185mm, 125mm to auxiliary power supply, installation of lightings, power outlet, A.C.C.U power;

Supervises work area at 500 lay down yard, cable laying for power supply, warehouse shelter and office, Mosque, Mechanical Fabrication, Carpenter fabrication area and street lighting and post lighting;

Supervises termination and glanding of all cables power supply from MDP to DP, wiring installation for Oversees installation of two generator machines, for standby and for operations purposes;

Implements Safety rules and P.P.E., conducts work force segregations, toolbox meeting.

Samko International - Doha, Qatar

July 8th 2009 - December 15th 2009

Electrical Supervisor

Works as an Electrical Supervise for the Al-Sadd 4 towers apartment construction project. Conducts inspection in building and apartments of the installation for Electrical Equipment, such as switch lights, Convenient outlet, water heater, hand dryer module, alarm bell, Alarm toggle switch, smoke detector and electrical fixtures, Prepares reports for accomplishments and delay of assigned tasks, Assists Site Engineer and consultants for as-built inspections, Oversees the revision of work as ordered by site engineer,

Al Naboodah Engineering - Dubai, UAE

February 25th 2008 - March 19th 2009

Senior Electrical Foreman

Works as a Senior Electrical Foreman on Palm Jumeirah Islands’ Gateway Tower monorail project,

Enforces safety rules on workers, inspects work accomplishments, activity implementations and work force distribution; Participates in the installation of high voltage cable that includes setting up of overhead cable ladder and tray, cable jointing, generator connection control and DCS digital distribution system;

Supervises cable termination of high voltage cable, power distribution on MDP and DP auxiliary, lightings, FCU units and telephone connection panel, Prepares method statement, material details, N.O.C, damage reports, Rectification and R.F.I report work schedule,

Saudi Aramco Mobil Refinery - Yanbu, Saudi Arabia

July 17th 2006 - November 25th 2007

Maintenance Electrical Foreman

Coordinates to Electrical Maintenance technicians and Engineer. For day-to-day activities on different plant area. Assists on planning spare parts replacement schedule required for MV panels,

Monitors and controls breakdown of MV panels / transformers up to 33 Kv. Conducts work activities in hazardous process at the refinery off shore and on shore area. Performs troubleshooting on single / three-phase motor pump and compressor on 480, 220 and 120 voltages on breakdowns, Performs electrical maintenance on elevator powers and repairs faulty motors for catalic cracker unit, water, air and gas separators, crude vacuum, sooth blower, water and sump pumps; Performs preventive maintenance schedule of 115 Kv transformer, sub-station electrical panels’ rectifier panel and U.P.S equipment,

LRTA Line 2 - Santolan, Pasig City, Philippines

February 10th 2003 - July 15th 2006

O.C.S. Electrical Foreman

Conducts inspections, testing and commissioning of overhead contact, messenger, dropper, guy wire and

Jumper wires. Rectifies and repairs misalignment of cantilever assembly. Operates and drives heavy equipment vehicles for railways like Geismar vehicle, Unimog vehicle 501 to 503;

Rolling Stock - Senior Train Electrical Maintenance February 10th 2003 – March 25, 2004

Inspects inverter unit, on-board radio panel, lighting fixtures, filter capacitor box and air compressor unit for repairs, replacement and maintenance;

Performs light and heavy maintenance of boogie assembly, and driver’s cab manual and automatic TOCP;

Conducts train inspection of pneumatic door, brake operating unit, pantograph and horn.

TESPHIL Maintenance Team, MRT Line 3 - North Edsa, Philippines

February 2000 - January 2003

Technician B - High Voltage Equipment

Repairs 34.5 Kv incoming power to distribution, auxiliary, rectifier and feeder panels, and transfers AC to DC volts for overhead catenaries, power to 750 DC volts for train power during failures;

Operates U.P.S. for backup power for communication and signaling electronic equipment, and all DC power communication control panel; Performs troubleshooting, on operating T.P.S.S and high voltages equipment on failures.

SUMITOMO Mitsubishi Heavy Industries, MRT Line 3 - North Edsa, Philippines

Comm Technology November 1999 - March 2000

Electrician

Part of the technician team on testing and commissioning of power, distribution, rectifier and auxiliary panels, and transformers; installs power panels at stations, sub-stations, and power supplies for train operation.

Trainings

Man Lift and forklift training

Bureau VERITAS: BV.DOA.12.ISV.124.80 Man Lift ML 01. 01/12/15 I.D validity 01/12/18,

Qatar license 275******** Validity 11/11/2018 first issue 11/12/2012 Total 60 hours

CSE Awareness, fall protection 100% tie-off, Basic fire Extinguisher, Confine Space, defensive Driving, Stop card, Hear stress, Hand Power Tools. Environmental awareness– Qatar February 4th to 5th, 2012 refresh on March 2017 – Total 24 hours.

Autodesk Training Center - Philippines

AutoCAD for Professionals (Levels 1 and 2). March 9th to April 7th, 2009 - Total 80 hours

Fuchs Lubritech - Philippines

Seminar on railways lubrication and tools. March 3rd and 4th, 2006 - Total 16 hours

Balfour Beatty Rail Power System - Philippines

Seminar and Workshop on OCS Phase 1 and Phase 2. November 3rd to December 22nd, 2003 - Total 245 Hours

Japan Toshiba & Korea Rotem Consortium - Philippines

Seminar on rolling stocks and train maintenance. February 3rd to March 25th, 2003 - Total 254 Hours

Australia Pandrol System Maintenance - Philippines

Railways track works maintenance. March 16th and 17th, 2003 - Total 16 Hours

Singapore Technologies Electronics - Philippines

On-board and portable radio system maintenance. March 18th, 2003 - Total 8 Hours

Education

Bachelor in Science Electrical Engineering, 1991

Feati University - Manila, Philippines - Undergraduate

Personal Information

Birth Date: November 15, 1975

Height: 5’5



Contact this candidate