Name Nationality : : Pakistan Mohammad Ijaz
Date of Birth : 01/10/1985
Marital Status : Married
Passport No : BQ1519014
Salary Expectation : Not Specified/Negotiable
More than 11 year experience in Electrical Projects & Operation and maintenance and petroleum sector. Have a good experience in Trouble Shutting.& Have a good experience in Installation, maintenance Repair Electrical and instrumentation.
1- as Foreman An excellent Electrical experience From with 21 TRAGS -April- 2019 ELECTRICAL to till date. ENGINEERING LTD Qatar,
2- An excellent experience with DESCON ENGINEERING LTD International Gulf, Oman, Dubai, Saudi, Pakistan, as Supervisor Electrical From 23 Jan 2016 to 05- Feb 2019.
3- Sponsored Company: M.S Al-Suwaidi Industrial Services Co. Al-Jubail Saudi Arabia Duration: 18 -09- 2008 to 07-12-2015.
Position: Electrical Technician
Clients: Plant Maintenance in SABIC Plant and ARAMCO Plant) Saudi Arabia
4- Company: An excellent experience with SIEMENS PAKISTAN ENGINEERING CO.Ltd. Duration: 12-01-2007 to 30-07-2008
Position: industrial Electrician
Electrical Technician
SUMMARY, Profile
CAREER SUMMARY
Professional Experience
Contacts:
Mobile: 009**********
Home: 0092-308-***-****
adbsdh@r.postjobfree.com
adbsdh@r.postjobfree.com
IMO ID: 009***********
Skype ID: 009***********
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) My roles and responsibilities during my tenure is as below.
I will come in Day shift or night shift for 12 hours and individually handle the shift and responsible for Electrical jobs during the shift
Attending to all Electrical complaints initiated by Operation department
Carrying out preventive maintenance (PM) job as per PM schedule. Task & Job Responsibilities
Plant Maintenance, Electrical Field. To do Preventive and Breakdown maintenance, & Testing, Servicing
Maintenance& Testing of Motors –Maintenance of motor up to 2000 Kw, 4.16 kV, Including Testing of motor.
Maintenance,Fault Finding & Trouble shooting of MCC,PCC unit, Medium & low voltage, and also Maintenance & Trouble shooting of VFD unit, Control & Power unit.
Motor Control Centers (Single and Three-Phase AC Motors)
AC Electrical Equipment (Three-Phase 208, 460, 600 volts)
To establish & Work with Profibus connector, profibus loop, Communication between DCS System
LV, MV Motor installation, Cable Termination and joints & Disconnection,Cable and testing
Installation of switch gears & panel boards.
Installation, cable termination, fixing of switchgears, change over switch axes, circuit breakers.
Experienced in the installation of transformers, breakers, feeders, isolation switches, control boxes etc., cable lying, testing and termination, cable splicing, tunnel works, PLE wiring etc.
Maintenance and Operation Indoor type Sub-station.(34.5/4.16 kv,34.5/0.480kv)
Operation and Maintenance and &Troubleshooting of HV/LV switchgears and breakers like SF6, VCB’s, ACBs, MCCB’s etc. (Worked in 480V, 4.16KV, 11KV, 13.4KV, 34.5KV)
Operation, and Maintenance of Transformer up to 20/25 MVA,34.5/4.16 kv.
Opinion and, Maintenance (P, M) Repair, of Feeder/Emergency Diesel Generator Set, Alarm systems, Alternator set, communication systems, etc. up to 400,1600,2400 KVA
Maintenance of lighting Circuits, Plant light as Emergency lighting and its batteries etc..
Maintenance of UPS system, Battery unit, Rectifier unit, Inverter unit.
Maintenance of EOT Crane up to 15 Tone
Maintenance of Sub Station HVAC System.
Monitoring of HV,MV Electrical Equipment’s, Monitor the healthiness & status of equipment as per standard
Maintenance and Repair of Barkers. Motor, Blowers, fan and same Tools and equipment.
Lighting: I made overhaul for most lighting by changing old system by new one. Perform daily inspection.
Fully aware to prepare different types electrical boards and to manage holders, sockets, button, switch etc.
Maintenance of Shut down plant activity.
Also responsible of permit Accepter & Familiar with the Work Permit and Lock-out/Tag-out Procedures of Safe work, Hazardous work, Confined space work.
Responsible of plant availability, Reduce Break Down Time.
Main substation 34.5KV & MCC 4.16KV and MCC 480 volt Monitoring job.
All MV Volt breakers Isolated and Energized.
Professional Experience
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
Daily morning discussion on Safety tool box talk and any other issue related to Safety.
Well understand and follow company’s permit to work system.
Control risk by issuing isolation certificate by means of LOTO (Lock out Tag out) during energize and DE-energize.
Observed any unsafe condition or unsafe act in the plant and immediately reported to Supervisor.
Undertake Risk assessment of various electrical activities and controlling the risk associated with them.
Active ERT (emergency response team) member in my present company for handling any emergency jobs.
Preparation of action Plan for Handling Emergency.
Checking of Earth system effectiveness and using ELCB for various Installations.
Matriculation with Science Board of intermediate Rawalpindi Pakistan
Diploma of Electrician from Govt. Technical Training Institute Pindigheb Attock.
Internet - Email, Downloading, Search & Surfing
Ms. Office - Ms. Word, Ms. Excel, Ms. Power Point
Others - Windows OS,
I wish to work in an international Company with good working environment and I will prove to be a smart worker working from dawn to dusk for the dignity and development of the company by enhancing my skills and experience as well. Urdu, Hindi, Arabic & English
Safety on Job:
Education
Technical Qualification
Computers Skills
Key Profile
Knowledge of Languages
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) Filename: CV-Electrical Technician.
Directory: D:\AL-New folder (15)\Rig cv\POST APPLIED FOR Rig Electrician - ok Template:
C:\Users\user\AppData\Roaming\Microsoft\Templates\Normal.dot m
Title:
Subject:
Author: user
Keywords:
Comments:
Creation Date: 21/11/2016 10:25:00 AM
Change Number: 25
Last Saved On: 25/05/2019 12:33:00 AM
Last Saved By: user
Total Editing Time: 95 Minutes
Last Printed On: 25/05/2019 1:47:00 AM
As of Last Complete Printing
Number of Pages: 3
Number of Words: 934 (approx.)
Number of Characters: 5,326 (approx.)
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)