CURRICULUM VITAE
.
V.UMACHANDRAN-
Pondicherry-605003
Mobile No:+918*********
Email:adbrbc@r.postjobfree.com
Skype id: umachandran.venkataraman
Valid UAE / Qatar Driving License (LMV)
Availability: Immediate.
Position Looking for A SR-ELECTRICAL ENGINEER
(EDUCATIONAL QUALIFICATION:
• Bachelor of Technology-Electrical/Electronics-2013
• Diploma in Electrical and Electronics Engg-1987 April(3yrs)
• Diploma in Industrial Safety (1yr)
• Certificate course in refrigeration and air conditioning
• REVIT-MEP BIM Modeler
CARRIER OBJECTIVE:
An Electrical Engineer with 28+years of experience in designing and handling MEP installation for Residential, Commercial, Infrastructure and Process industries seeking challenging role with multinational organization to contribute accurse expertise in formulating organizational profit objectives. SKILL: Electrical Engineering, Project Management, Technical Consultancy for MEP Systems, Installation /Testing inspection/Trouble shooting of MEP System. Tendering project constructability- Reviews/Cost/Time Estimation Project closeout, Site management, Client and supplier Contractual negotiations, Coordinate with department and technical Heads, Management reporting communication and interpersonal skill. Computer MS office Auto cad, Internet. EXPERIENCE: 28 YEARS GULF & INDIA.
OVERSEAS AND INDIA EXPERIENCES
MEP Freelancer-Pondicherry
Period: Sep-2019- Till date
Jobs Description: MEP design from concept to as built and MEP Coordination, Electrical LV/HV design and Execution.
GOLDENPALM PETROLEIUM SERVICES –Kuwait.
Designation: Project Manager
Period : Jan-2019- Aug-2019.
Page 2 of 6
Project: Kuwait International Airport-Terminal –II (14nos of Substation 11KV/1600KVA and 2Nos 11KV switching substation and ancillary Buildings) Electrical Design from concept to DGA A approval.
Job Profile:
• Electrical design for substation and ancillary building work-(Lighting,Small power,Fire Alarm,Extra Low Voltage services.
• Earthing system for all Electrical substation and switching substation.
• Prepare the BOQ and fianalise for all substation.
• Coordination with Main contractor,Clients and consultants.
• Manager the Project within Budget.
• Liaise with local authorities for the approval of MEP services drawings and service connection.
• monitoring overall progress and use of resources, initiating corrective action where necessary
• Prepare of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard
• Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.
SKV CONSTRUCTION- Trichy-India.
Designation : MEP MANAGER
Period: Jan-2017 – APRIL-2018
Job Profile:
• In-charge for overseeing all Mechanical and Electrical works
• Selection of Materials &Materials proposal.
• Monitor the MEP work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.
• Monitor the installation, inspection and testing of all the MEP equipment, fittings and work implemented meets the specification and the consultant requirements
• Prepare of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.
• Quantity Take off &Ordering Material proposal, Site supervision.
• Monitor the day to day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work, conducted, supplying resources and dealing with operational issues and problems.
• Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.
• Liaise with local authorities for the approval of MEP services drawings and service connection.
ETA STAR ENGINEERING-DOHA-QATAR
Designation: MEP DESIGN MANAGER
Period: September-2011 -Feb-2016
Company Profile: ETA Group of Emirates Trading Agencies-LLC - Qatar Page 3 of 6
Project Involved
• Barwa Commercial Avenue- Commercial and Residential complex in Doha Qatar Type-1(240million) (1.7Km Long ResistentialComplex-B+G+MF+2F+RF) &Type-2-
(190million) (1.3KM Long Commercial and Residential Complex(B+G+MF+2F+RF) 2) 2B+21Floor+Roof Multi storey building in Pearl Qatar-Doha (Magnificently designed Tower located on the water front with private Beach at Pearl, Qatar. 3) DOHA CONVENTIONALCENTRE-(400million)(Total approximate 47700Sqmtrs that includeFire Exhibit hall(29000Sqmts) with 18mtrs ceiling height and 96mtrs column free span that run 342 mtrs in length. Convention centre contain Main foyer, Bistros, PublicRest Rooms, Prayer Rooms, a loading Zone, Storage and Circulation space and Car park in Basement(Capacity of 2800Nos).
4) Integrated Health Centre and Worker hospital-Ras Laffan,Qatar. (63.2Million) Integrated health Centre consist of a Ground, Basement and one upper floor and the 120bed capacity worker hospital having Basement, Ground and three upper floors Job Profile:
• Monitoring the project budget and schedule and oversee performance to ensure the time, quality and on budget the project execution.
• Review the Tender documents from the MEP prospect including scope of the work, package of Subcontractor technical submittal and test report.
• Coordinate all construction/design matters between the key stakeholders-Design Team, Third party, Special designers, Contractors.
• Manage coordinate and control all meetings in relation to the construction/design/shop drawings of Specialties contractor’s packages to ensure the overall design requirement are integrated into project.
• Manage the review of key milestone deliverables for completion in relation to quality of construction/design implementation and coordination of design changes including Quality assurance in accordance with design consultants, contracted scope of services.
• Provide input during the development of material and shop drawing submittal.
• Coordinate with consultant/main contractor regarding project technical specification and requirements.
• Selection of Material &Material proposal.
• Quantity take off &Ordering material proposal.
• Identify resources needed and consolidate in project manpower plan and assign responsibilities.
• Monitor Subcontractors and vendors and provide feedback to the Project managers.
• Identify resource needed and consolidate in project manpower plan and assign responsibility
• Ensure all as built drawings are properly issued, stored and maintained.
• Developing procurement strategies for the Sub contractors/Suppliers in terms of packaging and scope of work.
• Develop individual as well as team capabilities
• Assist the project manager in preparing periodical report and other report.
• Follow up Testing, Commissioning, startup and handing over the clients. Page 4 of 6
M/s. PAL TECHNOLOGY-Abudhabi-UAE
Designation: Electrical Engineer-MEP
Period: Jan 2010- April-2011
Company Profile: PAL Technology Services L.L.C.(A subsidiary of Royal Group, UAE) is leading construction company in UAE involving the Major infrastructure Development in Abudhabi. The Major projects are AlReem Island,Yas Island, Hydra Village Shahama) etc. Projects details:
HYDRA VILLAGE : Hydra village is a very big infrastructure development project by HYDRA Properties and it consists of 5 different type of 2500 villas, G+2 Apartments. M/s. SENSAIRE SERVICES, L.L.C.-Dubai.
Designation: Project Engineer-Electrical
Period : Jan 2007- Dec 2009
Projects details:
i) 3B +G+27 +R- ( AI Ajmi consulting) in internet city, Dubai ii) 3B +G+27+GYM+R –( Arch dome consulting) in Tecom city, Dubai iii) U Bora tower- Whitby & Bird Consulting Engineer, Business Bay in Dubai. (2B+52+Roof- Office Tower+16Floor Residential Tower.
Job Profile: (Sensaire Services and Pal Technology)
• Supervise the installation of MEP works and ensure the work has been completed as per the approved shop drawings with in time frame and progress of approved consultants programs.
• Negotiate and maintain relationship with vendor and sub-contractor.
• Assist the Project Manager with scope review, budgeting and justification of MEP change order work.
• Collaborate with Engineers in identifying and flagging technical MEP issues.
• Plan the project requirements for materials, equipment, machinery, drawings, labor, etc. to ensure that they are within budget and completed in a timely manner in order to avoid any undue delays and costs to the project.
• Lead periodic on site coordination meeting with the Subcontractors.
• Supervise the testing and commissioning of new MEP equipments.
• Monitor the progress of all the work conducted in order to ensure that any possible delays or issues are dealt with in a timely manner and at minimum cost to the company.
• Responsible for leading construction teams for the MEP construction
• Selection of Material &Material proposal.
• Quantity take off& Ordering material proposal
• Recommends appropriate actions to ensure compliance with all local regulations.
• Preparing technical proposals and reports.
• Follow up Testing, Commissioning, startup and handing over the clients Page 5 of 6
M/s THERMO LLC, Dubai-UAE
Designation: Electrical Engineer
Period: Nov2005 - Dec2006
Project Details: Dubai international Airport- Phase II Expansion. M/s NATIONAL CONSTRUCTION COMPANY.
Jeddah-Kingdom of Saudi Arabia.
Period: May 2000-May2005
Designation: Project Engineer-Electrical.
Project Details: Multi storey buildings, Commercial Complex, Villa's,Hospital's. Job Profile:- (Thermo LLC, National Construction Company) Duties and Responsibilities:
• In-charge for overseeing all Mechanical and Electrical works
• Monitor the MEP work carried out is as per approved shop drawing and within the time frame and progress of the approved construction program.
• Monitor the installation, inspection and testing of all the MEP equipment, fittings and work implemented meets the specification and the consultant requirements
• Prepare of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.
• Monitor the day to day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work, conducted, supplying resources and dealing with operational issues and problems.
• Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.
• Liaise with local authorities for the approval of MEP services drawings.
• Prepare material submittals for consultant’s approval.
• Coordinate and/or participate in pre, weekly (e.g. OAC, MEP Coordination, Pre- installation, etc.) and post construction meetings. Prepare meeting minutes. Outline all items discussed, indicating the status of each, and assign responsibility and date for completion of open items. Coordinate with concern persons to compliance monitoring, update and report.
• Verify, price and prepare change order documentation. Maintain change order log to review weekly status of changes.
• Project completion closeout documentation. Compile as-built drawings, warrantee Letters, O&M manuals, and other documents to complete the closeout package. EXPERIENCE IN INDIA-13YRS(1987 MAY-APRIRL-2000)
HCL PERIPHERALS,
(Aunit of HCL Infosystems Ltd)
Designation: Executive-Project-liaison.
Page 6 of 6
Period : May 1994-April2000
Project Details: Industrial Building, Commercial complex. M/s:VENKATARAMANA CONSTRUCTION COMPANY.
Pondicherry - India.
Designation: MEP Supervisor.
April 1990 –April 1994.
Project Details: Process Oriented Company(Ceramic tiles, Food process) M/s:SIMCO ENGINEERING LTD, Trichy -India.
Designation: Jr. Maintenance Engineer.
Period: May 1987-March1990
Project Details: Different type of Industrial
Job Profile:-( HCL Peripherals, Simco Engineering Ltd,Venkataramana Construction Company)
• Plan implements and administrative a preventive maintenance programs to provide maximum life to facilities and reliabilities to support production team.
• Direct ground personnel.
• Provide the verbal/written report to Maintenance manager&perform the duties as assigned
• Maintenance the DG set, Process oriented machineries like mechanical press, Hydraulic press, Belt conveyor, Pneumatic conveyor. Electrically operated Furnace, LPG operated kiln, Spray drier (TileMfg).
• Erection and commissioning of different type Electrical Panel, Electrical Equipment
(Power Transformer. DG Sets, UPS)
• Coordination with plumbing, firefighting and Air conditioning work.
• Earthling system for the entire facilities including separate clean earth system for electronics equipment and lighting protection
• Liaise with government authority to obtain the approval to setup the new factories (Dept of industries, Inspector of factories, Pollution department and Electricity department.
OTHER DETAILS:
• Passport no : J5372073 valid till 2021-December.
• Marital status : Married
• Nationality : Indian
• Date of Birth : 23-01-1966
DATE:
PLACE: Signature