Post Job Free

Resume

Sign in

Engineer Civil

Location:
Beirut, Beirut Governorate, Lebanon
Posted:
February 09, 2020

Contact this candidate

Resume:

Page *

Chafic Hindawi

Profession : Civil Engineer

Nationality : Lebanese

Date and Place of Birth : December 29th, 1994 – Kuwait Marital Status : Single

Address : Beirut, Lebanon

Mobile : +961-**-******

Email : adbo4n@r.postjobfree.com

Membership in

Professional Societies : Lebanese Order of Engineers & Architects Education

Sep 2018 - Present

Sep2012 - Jan2017

Candidate for Masters of Business Administration (MBA)

(Expected to graduate in May 2020)

Lebanese American University, Lebanon

Bachelor Degree in Civil and Environmental Engineering (ABET Accredited) Beirut Arab University, Lebanon

Jan 2014 International Computer Driving License (ICDL) program Beirut Arab University, Lebanon

2011 - 2012 Lebanese Baccalaureate

Mission Laïque Française

Lycee Abel Kader, Beirut

Professional Experience

16/10/2017 -

31/7/2019

Danash Contracting & Trading Co

Site Engineer

Project: Rehabilitation of Dekerman Sewage Network Client: Council for Development & Reconstruction

Consultant: Abdul Wahed Chehab Consulting & Engineering Office Construction of road in Saida, 15 kilometers long and 3 meters wide (one way in each direction). The works include leveling, excavation and backfilling, base course, asphalt concrete with all related finishes (marking, signs, sidewalks etc).

The road underground services consist of:

− Storm water system

− Street lighting

− Water & waste water supply network (Concrete & PVC pipes with related manholes).

Page 2

Responsibilities:

− Supervision on the execution works for roads, including excavation, backfilling, compaction, leveling, pavement, marking road, signing and street lighting.

− Fixing potable water, storm water and phone cables.

− Taking decisions by changing in the proposed design. 05/05/2017 -

14/10/2017

Khoury Contracting Company

Site Engineer

Project: ZoukMosbeh Municipality

The project consists of 3 basements, 3 floors that include offices, gym and theater. The total built up area 7000m2.

Responsibilities:

- Perform daily reports concerning finishing (masonry, cladding) and casting activities (steel and concrete).

- Check the acceptance of material and equipments to be used inconformity with the specifications.

- Check and verify quantities executed by subcontractor for final payments.

- Handle site correspondence and shop drawings to insure timely collaboration between all trades (civil, electrical, mechanical and architectural).

- Perform inspections and supervision on all finishing works (screeding, plastering, tiling, painting and cladding).

- Maintain records updated and coherent with the changes for As-built.

- Reporting to Construction Manager.

04/04/2017 -

04/05/2017

A.R. Hourie Enterprises

Trainee Engineer

Project: CPF-Collège Protestant Français (Extension of the School) The project forecast the Construction of a building for sportive activities consisting of 7 stories: 3 basements for parking with swimming pool, large water tanks, G.F. with a polyvalent hall, Gym and cafeteria and 3 floors for administrative and Technical locals.

The training included the following trades:

- Excavation and Backfilling Infrastructure works.

- Infrastructure works (Mechanical embedded piping,earthing, …,).

- Installation of Tower Crane (2 Towers).

- Foundations and Retaining walls (Reinforcement and Casting).

- Engineering coordination for execution details and “RFC” preparation. Khatib &Alami – Consolidated Engineering Company S.A.L; Beirut - Lebanon

Trainee Engineer

Project: ABC Verdun Mall – Beirut

The project is a shopping mall. It consists of 6 upper floors, 1st basement and 6 other lower basements used for parking to serve the building. To have a pleasant promenade, Food &Beverages, Cinemas and Entertainment areas. The Total built-uparea is 150,000 m2.

Page 3

27/06/2016 -

30/09/2016

01/03/2014 -

31/03/2014

The training included the following trades:

1) Phase II:

- Concrete works, steel reinforcement and formwork of columns, beams, and slabs (hollow core, precast, and solid slabs). Also inspected most finishing works on site (Block, plaster, painting, tiling and cladding).

- Steel Structure for Cineplex.

2) Phase I:

- Shoring works: piles (drilling, and casting), anchors (grouting, and stressing), and cementitious shotcrete blasting.

22/06/2015 -

25/10/2015

Project: American University of Beirut Medical Center - Academic Clinical Center

Trainee Engineer

The project is a combination of clinical and educational services, the building consists of basements including: parking areas, technical rooms, storage areas and 9 upper floors including offices clinics and operation rooms. The total built- up area is 36,000 m2.

The training included the following trades:

- Concrete works, steel reinforcement and formwork of columns, beams, and slabs (hollow core, precast, and solid slabs). Also inspected most finishing works on site (Block, plaster, painting, tiling and cladding).

- Post tension for slabs and beams.

- Steel construction pedestrian bridge.

- Steel structure for apron and canopy to support stone cladding.

- Curtain walls envelop for the project including unitized aluminum and stick system.

24/12/2014 -

24/03/2015

Project: Rive Gauche Offices Tower, Beirut – Lebanon Trainee Engineer

RIVE GAUCHE Tower is a prestigious retail and office development, located in Achrafieh, corniche AL-Nahr Street, lot 3527. The total built-up area: 40,870 m2 with a total height 122 m.

The training included of the following trades:

- Concrete works, steel reinforcement and formwork of columns, beams, and slabs (hollow core, precast, and solid slabs). Also inspected most finishing works on site (Block, plaster).

- Post tension for slabs and beams.

- Steel construction for stairs and beams.

01/06/2013 -

01/07/2013

Bureau D’Etudes et TraveauxHydrauliquesElectriques Elie Selwen; Beirut – Lebanon; Contracting Company

Trainee Engineer

Project: Bechara El Khoury Tunnel, Beirut - Lebanon The project involved constructing an underground tunnel with service roads on both sides. The tunnel, which stretches over 350 meters, is made up of two cells, with two lanes each.

The training included the follow up of Infrastructure works: wastewater and storm water drainage systems, telephone networks, electricity and Internet cables and local excavation.

Page 4

Technical Skills

− Extended 3D Analysis of Building Systems (ETABS) from Computer and Structures Incorporated

(CSI) – January 2016.

− ICDL, AutoCAD 2D/3D, Robot Office.

Languages

Arabic: Native Speaker

French: Full Professional Proficiency

English: Full Professional Proficiency

IELTS Overall Score: 7



Contact this candidate