PRAVEEN PUSHPALA

SENIOR BIM MANAGER

Ph: +60-10-429-****

adbnhz@r.postjobfree.com

EDUCATIONAL QUALIFICATIONS:

Highest Qualification : Diploma in Mechanical Engineering

University : Sri Venkateshwara University

PROFESSIONAL EXPERIENCE:

1)Present Organisation : Country Garden Pacifiview Sdn. Bhd.

Project Name : Forest City, Johor Bahru, Malaysia

Role in Project : Senior BIM Manager

Project Duration : Aug 2017 – Ongoing

Project Summary :

FOREST CITY at Malaysia consists of four man-made islands, total land area of 1,817ha - about three times the size of Singapore Sentosa island. The project is valued around S$225 billion. The Integrated City with 8 major industries (Foreign Investment, Tourist Attractions, Education Hub, Entrepreneurial base, MICE, Retirement Community, E-Commerce Centers & Financial District

Main Roles & Achievements as Senior BIM Manager-Digital Engineering Center

Facilitate construction by applying BIM, VDC and CAD technologies in the design phase

Check, collaborate & validate 3D models compatibility & facilitate Common Data Environment.

Model setup, Clash detection, & Coordinate with Digital engineering team & IBS team for building constructable 3D models of residential buildings, apartments Multi storey villas & five-star hotels in Revit & Tekla structures (developed Revit Models for references & clash detection using Solibiri model checker/Navis works)

Developed BIM protocols, modelling guide and asset information modelling guidelines.

Achieved 4D Crane Simulations of 40 floors residential building in liaise with contractor’s crane schedule.

Implementation of project & 6D Facility management software ‘EcoDomus’ is a facility management software for life cycle featuring a common data environment which provides for real-time integration of the Asset Information Model

3D Model, clash detection & Coordination with projects & construction team for the Sultan Ibrahim Larkin Stadium JDT Football stadium with span of 140,000 square meters with a total built area of 70,000 square meters and can accommodate up to 40,000 people in Johor.

Achieved 4D sequencing Crane simulation for Foot Ball stadium using Navis works under superior guidance in line with contractor’s crane simulation schedule.

Achieved 3D Modeling, checking & coordination of Sales Gallery of Forest City with 3 floors & radial steel structure for asset information, using Tekla structures for Steel & concrete structure and Autodesk Revit for Architecture modeling.

Enhanced IBS rebar production rate by 60% per day by developing & implementing the rebar quantity take-off along with rebar bending shapes to document format using from Tekla structures, enabling the operators to feed in the data directly to machines.

Coordination & support to 5D YTWO formative team for implementing the Test Project at Forest city.

Managing & driving BIM standards, policies, library, parametric modelling and developing Plug-in for faster modeling.

Trained the team on Tekla structures, Solibiri & Tekla BIM Sight.

Collaboration, collection & maintaining the Asset Information

Collection, management and distribution of Forest City data and Information allowing graphical reports and Analysis.

Keeping up to date with new BIM developments by attending relevant seminars, conferences and subscribing to relevant information sources.

Formwork & Scaffolding standards enhancements and implementations.

Software and hardware records, recommendations & record maintenance.

a)Skills utilised during the Project (including period utilised):

Skill

Period

1)Tekla Structures 2018

Aug 2017 – Ongoing

2)Revit

Aug 2017 – Ongoing

3)AutoCAD

Aug 2017 – Ongoing

4)iTWO

December 2017 – Ongoing

5)EcoDomus

September 2017 – Ongoing

6)Solibiri Model Checker

December 2017 – Ongoing

7)BIM 360

November 2017 – April 2018

8)Bluebeam

Basic operational knowledge

9)Bentley ProjectWise

Basic operational knowledge

10)Tekla BIMsight

July 2018- Ongoing

2)Previous Organisation-1 : Sembcorp Design and Construction Pte Ltd (EOSM)

Projects Handled : 1) MCL Land (Vantage), Singapore

: 2) Kranji Camp Singapore

Role in Project : Assistant Manager

Project Duration : Aug 2016 – Aug 2017

Project-1 Summary:

MCL Land (Vantage)

Proposed condominium housing development comprising 4 block of 17- storey apartments, total of 710 units with 2 basement carparks, childcare centre and communal facilities on lot 04758X MK 6 at Jurong west street 41, Singapore.

Project-2 Summary:

Kranji Camp

Construction of accommodation, Administration, storage & common facilitates buildings along Choa chu kang way, Singapore.

Leading the BIM Engineering team for PPVC Modular construction, structural drawings & consulting. Leading a team of 5 BIM modelers with an average of 2 projects.

3D BIM models reviewing & coordination with project managers, IBS managers & clients.

Preparation of BIM Execution plan & BIM Implementations, standards, modelling workflow & methodologies

Coordination follow up & control among all the disciplines involved in the project, especially with design, 3D modeling, shop drawings, clash & interference checks.

Slashed 30% of engineering outsourcing cost for the parallel project by planning the engineering task internally forecasting the team capabilities, while ensuring the targets of other priority project deadlines.

Optimized the engineering time & manufacturing cost by standardizing the connection details in line with the design requirement in accordance to project schedule

Trained, supervise and practiced the standards of design and BIM modeling.

Clarified the RFI’s from production & construction team for the design related queries on day to day basis & also extended the support to work on installation feasibilities and material purchase requisitions documents.

3D Modeling, Checking & Coordination of 4 blocks of apartment building for MCL project.

3D Modeling, Checking & Coordination of 5 blocks of defence buildings for Kranji project.

Use BIM for coordination, sequencing, constructability & field use & Ensure model Quality control.

Mentor the team on best practices and tips and tricks to improve workflow.

Advocating the BIM tools to deploy, manage their interoperability and ensure compliance with procedures and BIM standards

Skills utilised during the Project (including period utilised):

Skill

Period

1)Tekla Structures 2016

Aug 2016 – Aug 2017

2)Revit

Feb 2016 – Aug 2017

3)AutoCAD

Aug 2016 – Aug 2017

4)BIM 360

November 2017 – April 2018

3)Previous Organisation-2 : TecGates Engineering Sdn.Bhd, Malaysia

Project Duration : April 2014 – Aug 2016

Role in Project : Assistant Manager

Achievements & Roles as Assistant Manager:

Lead for structural design and drafting team, mainly 3D Modeling, checking, client & project coordination.

3D Model review, clash check and comments.

Detailing of steel & concrete structures using Tekla structures (AutoCAD for desired zones) w.r.t fabrication, transportation & site erection feasibilities.

Responsible for team of engineers for structural, erection & design G.A drawings preparation & raising technical RFI & coordination.

Developed connection details according to the design requirement & site installation feasibility.

Slashed 30 tons of material wastage by preplanning the splice joints locations of structural steel column for 2000T process building.

Achieved 5000 MT of structural steel fabrication drawings using Tekla structures in 2 months.

Coordination & follow up with customers, project managers, engineers and vendors for technical delivery of wide range of engineering drawings for projects of varying complexity.

Responsible for maintaining the drawings, revisions, standards and Engineering correspondence & documentation.

Acted as a single point contact for client approvals & RFI’s.

Also involved in preparing technical proposals, drawings & attending the technical discussions with clients and consultants.

a)Skills utilised during the Project (including period utilised):

Skill

Period

1) AutoCAD

Aug 2014 – Sep 2016

2) Tekla Structures 21

April 2014 – Sep 2016

3) MS Project

Jan 2015 – Sep 2016

4) Bentley Stadd Pro

Aug 2014 – Sep 2016

4)Previous Organisation-3 : Bevcon Wayors Pvt Ltd, India.

Project Duration : Dec 2010 – March 2014

Role in Project : Assistant Manager

Achievements & Roles as Assistant Manager

Planning & designing of Plant layout drawings & Design documents, Shop drawings of Structural Steel, RC drawings like Transfer Towers, Crusher houses, silos, silos supporting structures, Trestles, sheds, Open & Closed Gantries for steel, Cement, fafa & Power plants using Tekla & Auto CAD software

Deriving the Layout schemes of Coal, Lime, Ash, Iron ore, Fafa systems etc. handling systems

Tekla structural Modeling, checking & placing connections of Structural Steel and RC Buildings.

Awarded as Process Excellence Champ for Planning & achieving drawings for 100 nos. conveyors and 20 nos. structural steel Transfer towers of a single DRI plant in 3 months of time with a team of 4 people.

Awarded as Customer Eye candy for grabbing repeated order from UltraTech client as the engineering was completed before the schedule by 15 days.

Planning and co-ordination with internal departments like Projects, Site installation team and external members like Vendors & Client team for ensuring the necessary actions.

Skills utilised during the Project:

Skill

Period

AutoCAD

Dec 2010 – Mar 2014

Tekla Structures 18

Dec 2010 – Mar 2014

Pro-E

Jan 2012 – Mar 2014

5)Previous Organisation- 4 : Hyquip Systems Ltd, India.

Project Duration : May 2008 – Oct 2010

Role in Project : Senior Engineer Executive.

Achievements & Roles:

3D Modeling & 2D detailing of transfer towers, process buildings, concrete crusher houses, screen houses using Tekla structures & AutoCAD.

Checking & preparation of Detailed Mechanical & structural drawings for Bulk Material handling.

Preparation of shop drawings for Transfer Towers, Open & Closed Gantries, Trestles, Stringer & Short supports, Gravity take-up unit structures & Tramp iron separator supporting structures.

3D Modeling & detailing of transfer towers, crusher house, screen houses using Tekla Structures for required projects.

Extracting Bill of Quantity for Fabrication drawings.

Preparing raw material indents

Preparation of Proposal layouts & Plant layouts for Material handling systems

a)Skills utilised during the period:

Skill

Period

1) AutoCAD

May 2008 – Oct 2010

2) Tekla Structures 18

May 2008 – Oct 2010

3) Solid works 2000

August 2009 – Oct 2010

4.COURSES ATTENDED:

Basic, Intermediate & Advanced training for Tekla Structures 19 (3D BIM modelling software)

Advanced & Intermediate Training for Tekla structures 2018 & 2016i (3D BIM modelling software)

Beginners Training for iTwo software (5D, costing software)

Beginners Training for EcoDomus software (6D, Facility Management software)

Introduction to GIS (Geographic Information System Mapping Technology)

5.CERTIFICATION:

Tekla- 2018 Professional Advanced user- Precast- Distinction grade