Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Posted:
February 04, 2020

Contact this candidate

Resume:

ALLAN H. DE TORRES

adblw0@r.postjobfree.com

Abu Dhabi, U.A.E.

+971-**-***-****

OBJECTIVE:

To share my expertise, profession and work experience in achieving the goal of completing the task in a given time frame with quality of work as per international standards and client requirements. Seeking a position commensurate my knowledge and experienced, where this skill can be utilized & grow more productivity by a progressive and respectable company and to enhance my knowledge with competitiveness.

EDUCATIONAL BACKGROUND

Degree: Bachelor of Science in Electrical Engineering

University: FEATI University Sta. Cruz, Manila Philippines

June 1994– October 1999

COMPUTER SKILLS:

MS Word, Excel & PowerPoint application, Microsoft Access, AutoCAD

SUMMARY OF QUALIFICATION:

Experienced in installation and inspection of Power Plant Generation Project (2000MW combined cycle, Gas & Steam Turbine), 132/ 220/ 400 KV GIS Substation.

Experienced in Extra High Voltage & High Voltage Underground Cables, installation, inspection and testing (6.6 KV,11KV up to 33KV) Electrical Distribution network and Electrical Equipment’s

In knowledge of ITP (Inspection & Test Plan) Method Statements, International Standards & specifications, Quality Plan Electrical material approval.

Skilled in Quality System implementation for Installation/ erection

WORK EXPERIENCED:

Company: EPIC- SCALLA Contracting LLC

Project: AL TAWEELAH Refinery- Emirates Global Aluminum (EGA)

AL TAWEELAH, United Arab Emirates

Contractor: Bechtel International and Petrofac Joint Venture (BPJV)

Position: Electrical Engineer (Pre- Commissioning Engineer)

Joining date: December 19, 2016- March 31, 2019

DUTIES AND RESPONSIBILITIES

Electrical inter-trip/ Interlock scheme checking for upstream and downstream of 33kV & 6,6kV Switchgear, 33kV & 0.69kV Switchgear, 33kV & 0.4kV Switchgear 6.6kV & 0.4kV Switchgear through SCADA/ DCS communication

AC/DC Circuits Scheme Checking.

Setting the parameters on Siemen’s Simo Code Pro V relay motor management of LV motors

Pre-commissioning and energization of Product hydrate and Hydrate stacking with tripper circuit conveyor and interlock testing through the DCS.

Pre-commissioning and energization of Siemens Sivatec 690V LV switch gear

Pre-commissioning and energization of ABB 400V Switchboard, Borri Battery Charger Panel & UPS Panel, 400/ 230V Distribution Panel

Pre-commissioning and energization of 33/0.72 kV 3.4/ 4.2 MVA Transformer, 33/ 0.72 kV 4.3/ 5.4 MVA Transformer, 690/ 420V 300kVA Transformer

Pre-commissioning and energization of Siemens 6.6kV switch gear panels

Automatic transfer switching (ATS) testing of Siemens 690V LV Switchboard

Secondary injection test of relay REF620 & REM620 using Omicron CPC 356

Lead and owns Substation Electrical Distribution Systems for driving completion.

Lead for the Electrical Isolation and switching change over for Electrical equipment 690V and 400V LV Switchgear

Apply project Electrical and general procedures and prepares electrical isolation, switching & energization documents.

Lead the lock Out Tag Out (LOTO) activities during work for the Main Substation 33kV Switchgear 611SG10010 & 611SG10020, 6.6kV Switchgear 611MC10010, 611MC10020, 690V & 400V LV Switchgear, Battery Charger Panel, UPS Panel, Distribution Panel, Lighting Inverter Panel and Digestion Substation- 6.6kV Switchgear 611MC10030, 611MC10040 and confirms 100% compliance of craft sign on/off.

Applies management of change process to the pre-commissioning Electrical activities. This includes design changes to scoped drawings, produces NCR’s/ RFI’s/ FCD’s, redlines, and associated rework and retesting coordination.

Applies Electrical testing documentation and procedures and supports management of change, updating and tracking (working in conjunction with the specific document owners).

Identifies Electrical technical issues and raises queries to the Lead Electrical Testing Engineer or Process Area Lead.

Work with other contractors, supplier representatives & other discipline teams to ensure proper documentation of testing.

Coordinates Electrical Spare Parts - ensure that they are available for pre-commissioning use

Update scoped drawings and databases; whilst coordinating with the Completions Department Turnover Coordinator. This includes input of any required changes into Teamwork’s and Set Route.

Prepare project completion Red marked up/ as built drawing 690V LV switchboard Single line diagram, 400/230V Distribution panel schedule, 690V LV motors Single line diagram and submitted to client.

Company: AL NASR Contracting LLC (Abu Dhabi, UAE)

Project: Upper ZAKUM UZ750K- Accommodation & Utilities (AUP) ZADCO Project

ZAKUM Field Facilities, Upper ZAKUM Island (OFFSHORE)

Contractor: HABTOOR Leighton Group (HLG)

Position: Electrical Engineer (QA/QC)

Joining date: May 15, 2015 to December 18, 2016

DUTIES AND RESPONSIBILITIES

Prepare and review Method Statement, Quality Control Procedure, Inspection Test Plan and Inspection Checklist in compliance with Project requirements for the Procurement, Installation, Testing & Commissioning of 33/6.6/.415kV Oil Immersed Power Transformer-10MVA, 7.5MVA, 2.5MVA, 1MVA & .5MVA, .415 & 6.6kV Neutral Earth Resistor, 6.6kV MV Switchgear, 415V LV Switchgear, LV/ MV Bus Duct, UPS System & Dry Type Transformer 125, 100 & 50KVA.

Ensure compliance with the requirements Contract Scope of work, technical specification and contract quality plans

Prepare Inspection & Test Request (IR, MIR & PCIR) and perform checklist for all the data required prior to final inspection

Monitor daily discipline activities and verify compliance to project procedure, specification and standards

Identify quality problem, reject non- conforming items & initiate, recommends or provide solution to problems with Client sanction and approval through designated channels

Coordinate with Project Manager/ Engineer on the approved BOQ and specific requirements of the project

Specified implementation of standards, methods, procedures for inspection to achieve product precision accuracy and reliability

Prepare and inspect incoming supplies of materials as per list condition of supply agreement and perform surveillance check if material meets with the specification and ensuring the conformity with the purchase order against delivery documents.

Prepare surveillance report of the approved Inspection Test Plan ensuring that all test procedure are being followed such as loop checking, circuit continuity, insulation testing, instrument calibration as pre-requisite for system commissioning

Identify shortcoming with respect to specified requirements and ensure that non-conformance reports (NCR) and exceptions (deficiencies, Request for Information) are checked, verified and close-out

Ensure that any repair and following inspection is done on a basis of the approved method statement and instruction included with the related Non-Conformance Report

Constant monitoring for assigned area of construction being performed without a permit or dangerous conditions and issue notices of violation where unsafe or illegal conditions exist then conducts follow up inspection

Demonstrate continuous effort to improve operations, decrease turn over times, streamline work process, and work cooperatively and jointly to provide quality seamless costumer service

Prepare ITRA & ITRB documents prior to handover of documents

Update all QC documents for inspection logs, punch list items and its progress, approval of all submitted QC document log, parallel to site inspection work

Carry out progressive partial turnover punch list items to ensure that works is completed to the fullest extent possible prior to acceptance

Compilation of all Inspection reports for QC Dossier including manufacturers vendor data, as built drawings, to incorporate all the documents in all overall QA/QC final submittal

Company: SCALLA Contracting LLC

Project: Emirates Aluminum Phase 2 Smelter Project (Carbon Area)

AL TAWEELAH, United Arab Emirates

Contractor: SNC LAVALIN International

Position: Electrical Engineer (POV Specialist)

Joining date: March 26, 2013 to May 14, 2015

DUTIES AND RESPONSIBILITIES

Point to point checking, Insulation testing of power and control cables prior to energization

Read, analyze & interpret Single line diagram (SLD), schematic diagram & block diagram of DB’s/ equipment prior testing and energization

Pre-Operation Verification of 400/200/110VAC Distribution board (ABB make) and energization

Pre- operation verification of Allen Bradley Panel View plus 1500/ 1000/ 700 HMI, PLC panel and energization by multiple power source (230VAC UPS & normal supply)

Pre-Operation Verification of Motor Control Center (MCC) ABB make, that consist of E3 plus relay- Device net, Variable frequency drive (VFD), contactors, checking of operation, testing and energization.

Pre-Operation Verification of Un Interruptible power supply 400V/ 230VAC (UPS) GUTOR/ Schneider electric, testing of battery bank and energization.

Pre-Operation Verification of Emergency Lighting Inverter (GUTOR/ Schneider electric), testing of battery bank and energization

Pre-Operation Verification of 400VAC conductor crane rails, Maintenance isolation panel (S1, S2 & S3 castle key) for Anode Baking Furnace FTA crane & Green and baked Anode Stacker crane and Energization,

Pre-Operation Verification of Green anode line & baked anode line 400VAC motor actuated by conveyor

Pre-Operation Verification of 400VAC Switchgear (GE)

Pre-Operation Verification of 400/ 110VAC Step Down Transformer

Pre-Operation Verification in building General Services such as indoor/ outdoor lighting and power electrical system

Responsible for the field inspection, construction completion and mechanical completion walk down activities for all equipment and material and ensuring the correct standards and specification.

Coordination with our client, sub-contractor and vendor prior start of any activities.

Responsible for Isolation and LOTO of under handover system/ equipment that required shutdown for EMAL maintenance team

Responsible and review for the handover package binder to client

Company: TARGET ENGINEERING & CONSTRUCTION CO.

POWER, INSTRUMENTATION & CONTROL DIVISION

STATE OF QATAR 47200

Joining date: June 2008 up to March 25, 2013

Project: QATAR PETROLEUM (Refinery)

EPIC of Process Analyzer at QP Refinery- MESAIEED Qatar

Oil & Gas Industry

Client: QATAR PETROLEUM (QP)

Date: May 2012 to March 25, 2013

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES

Prepare method statements, ITP’s, pro forma checklist, work procedure and submit to the client (Qatar petroleum) for approval prior to commencement of installation of work

Ensure that the quality control systems work properly in accordance with the quality manual for the installation of scope of work

Project: QATAR PETROLEUM (NGL 1 & 2 Plant)

Relocation of Gas detectors in NGL 1 & 2, Gas Operations- MESAIEED Qatar

Oil & Gas Industry

Client: QATAR PETROLEUM (QP)

Date: April 2012 to May 2012

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES:

Prepare method statements, ITP’s, pro forma checklist, work procedure and submit to the client (Qatar petroleum) for approval prior to commencement of installation of work

Ensure that the installation of work such as cable trays installation; cable laying & relocation of detectors are done per specification & approved drawing.

Assist the client for the commissioning of the system.

Project: QATAR PETROLEUM (NFA PS-4 OFFSHORE Project)

Upgrade of UPS system, battery charger & battery banks at NFA (north field alpha) Qatar

Oil & Gas Industry

Client: QATAR PETROLEUM (QP)

Date: June 2011 to April 2012

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES:

Prepare method statements, ITP’s, pro forma checklist, work procedure and submit to the client (Qatar petroleum) for approval prior to commencement of installation of work.

Ensure that the quality control systems work properly in accordance with the quality manual for the installation of scope of work such as upgrade of UPS system, battery charger and battery banks at each corresponding platform

Responsible for the field inspection activities for all equipment and material and to ensure that materials and equipment are provided to the correct standards and specification.

Project: QATAR PETROLEUM (ONSHORE QPL-NGL2)

EPIC for Replacement of Damaged Instrument Panels & Obsolete Analyzers in NGL-2, Gas Operation

MESAIEED Industrial City, Qatar

Oil & Gas Industry

Client: QATAR PETROLEUM (QP)

Date: October 2010 to June 2011

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES:

Ensure that the quality control systems work properly in accordance with the quality manual for the installation of scope of work such as installation of local control panel of LPG storage tank T1 to T4, installation of local control panel light, exhaust fan, electronic hooter, air filter regulator, two position and pushbutton switches, indicating lamps and installation of Foxboro make PI converter.

Prepare all documents, method statements and submit to the client (Qatar petroleum, QP) for approval, prior to commencement of installation of work. QA/QC plan identify contractor personnel responsibilities, pro-forma checklist, work procedures, pro-forma request for inspection approval, request for material approval and non-conformance reports forms.

Prepare and submit Site Acceptance Test (SAT) for QP review and approval, carry out cable continuity checking, carry out necessary pre-commissioning installation checks and punch listing along with QP representative

Preparing for the final DOSSIER for the hand over documentation that include integrated drawings combining the existing and new system drawing, specification of all hardware along with details, loop diagrams, wiring interface diagrams, catalogues technical literature, cable schedule and interconnection diagram, operation and maintenance manuals.

Project: QATAR ALUMINUM

QATALUM, Power Distribution Project (SPAB)

MESAIEED Industrial City, Qatar

Oil & Gas Industry

Contractor: SNC-Lavalin International Inc.

Date: October 2009 to October 2010

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES:

Managed the Implementation of quality system, Inspection and Test Plan, Quality records and certifications, performs inspections and testing activities based on international standards on the construction QATAR ALUMINUM (QATALUM)-POWER DISTRIBUTION PROJECT. Low, medium and high voltage 6.6 KV, 11KV & 33KV electrical distribution network, responsible for the preparation of Request for Inspection (RFI) Field Test Document and other related documents required by client.

Responsible for the Quality Assurance and Quality Control of the project, preparation for client approval of all Electrical System as per visual and testing in accordance with plans and specification provided in the project execution procedure.

Conduct Field Test Inspection for Electrical System with Client representative as per Inspection Test Plan (ITP) of the project.

Review all the necessary records and report and monitor construction activities to ensure conformance to project requirements and specified Method Statement.

Ensure that the quality control systems work properly in accordance with the quality manual.

Project: 2000MW COMBINED CYCLE POWER PLANT, 400/220/132kV GIS SUBSTATION

MESAIEED (A) IPP PROJECT

MESAIEED Industrial City, Qatar

Power plant industry

Contractor: IBERDROLA INGENIERIA Y CONSTRUCCION, Spain

Consultant: Parsons BIRCHENHOFFS (PB)

Client: Qatar Petroleum

Date: June 29, 2008 to October 2009

Position: QC Inspector- Electrical

DUTIES AND RESPONSIBILITIES:

Ensure that work in 400/220/ 132 KV GIS Substation and Power Plant have done in approved design, specifications, approved drawings and standard to fulfill the requirements.

Carried out erection inspection of 400,220,132 KV GIS Substation.

Conduct inspection of Cable tray installation in 400/220/132kV GIS basement that have done in approved drawing and standard.

Prepare and review Inspection Test Plan in compliance with Project Requirements

Coordinate with construction team and all other discipline in keeping work standards

Prepare Request for Inspection (RFI) and perform checklist for all the data required prior to final inspection

Report / coordinate with Contractor and Project Management Team personnel for Updates, Project Status to ensure meet the project deadline

Monitor daily discipline activities and verifies compliance to project procedures, specification and standards. Identify quality problems, reject non-conforming items and initiate, recommends or provide solution to the problems with client sanction/approvals through designated channels

Prepare and inspect incoming supplies of Electrical and Instrument materials as per list condition of supply agreement and perform surveillance check if materials meet with the specifications and ensuring the conformity with the Purchase order against the delivery documents

Prepare surveillance report for the approved Inspection Test Plan ensuring that all test procedures are being followed such as loop checking, circuit continuity, insulation testing, instrument calibration, as pre-requisites for system commissioning

Check and inspect instrument drawing wiring and termination on instrument panels as per approved drawings connections on I/O, ensuring that all connections are being followed including wire tagging

Prepare Loop Package Test, Punch List and Non-Compliance report

Compilation of all inspection reports for QC Dossiers including ITP & IPP, NCR, Protocols, checklist, RFA, RFI, as built drawings, to incorporate all the documents in the overall QA/QC final submittal

Demonstrate continuous effort to improve operations, decrease turnovers times, streamline work processes, and work cooperatively and jointly to provide quality seamless customer service.

Company: AG&P CONSTRUCTION PHILIPPINES

Construction

Location: LIPA City Batangas, Philippines

Date: May 2004 to May 2008

Position: Site Engineer- Electrical

DUTIES AND RESPONSIBILITIES:

Ensure all work activities are in conformance with contract requirements, drawings specification and method statements

Ensure specifications and drawing are reviewed and clarifications on unclear issues are obtained

Ensure all necessary submission/ approvals and supporting activities in smooth and timely execution of construction works such as permanent material, shop drawings, subcontractors etc.

Preparation, submission, re-submission of methods statements including risk assessment and job hazard analysis

Interact with HSE/ safety and ensure all permits are available for works on site and all safety precaution are taken

Ensured required inspection and test are carried out, and completing records of successful completion of works and approval of hold and witness points identified on the inspection and test plan

Ensure adequate training of the people under their control, for the required procedures and specialist applications

Ensure materials and equipment are requisitioned on time in correct quantities

Ensure safety of all personnel on site, identification of potential hazard

Reporting progress to the Project Managers, Ensure Nonconformance’s if any are closed and taking timely preventive and corrective actions, necessary liaison with QA/QC and HSE department

Responsible for keeping the as Built records and ensuring this reflected on the drawings as work progresses

Responsible for completing of all Punch Items and Project Close Out, Handover Documentation and finalization of all outstanding issues at Hand over and other duties delegated by Division manager

SAFETY GUIDELINES:

All personnel to work at site must be properly oriented with the safety guidelines.

Safety personnel must make sure that the Safety Guidelines as per Project Safety Plan are being complied properly.

Since the work takes place in operational areas of a running plant special care must be taken and constant supervision is required.

SEMINARS ATTENDED:

Electrical safety in healthcare facilities & essential electrical system for healthcare facilities

SHEZAN hotel, Doha State of Qatar- October 14, 2011 (8:00am-4:00pm)

Electrical arc flash awareness and protection, New technology trends in LV Switchgear

Millennium Hotel, Doha, State of Qatar- July 29, 2011 (8:00am- 5:00pm)

Elements of a distributed control system, Subsea cable design for offshore platform, Behavior based safety

Philippine School- Doha, State of Qatar- April 29, 2011 (8:00am – 5:00pm)

Significant Changes to the 2009 Philippine Electrical Code (PEC), Lighting system design using RELUX, and Technical Seminar on Power Cables

Millennium Hotel (Al SADD), Doha, State of Qatar- November 19, 2010

Control system presentation, lighting system design using DIALUX, Hi Pot test presentation, Transformer oil testing presentation

Philippine School- Doha, State of Qatar- April 30, 2010

Process Control Instrumentation (With ISA Standards) & Street Lighting- New technology

Gulf Paradise Hotel, Doha City, State of Qatar- July 10, 2009

Light Rail Transit LRT Philippines

Paranaque, Metro Manila, Philippines- August 1997

BENGUET Hydro Electric Power Plant, Philippines- September 1997

American Wires Gauge and Cables (AWG) Co. Ltd.

BALINTAWAK, Metro Manila, Philippines- February 1998

Phillips Bulbs and fluorescent company ltd. Makati, Metro Manila, Philippines- April 1998

TRAINING ATTENDED:

Helicopter underwater escape training (HUET) & Sea survival

Venture gulf training center, Industrial city, Doha, State of Qatar

July 12, 2011 (8:00am- 5:00pm)

Hydrogen sulfide (H2S) and Breathing Apparatus (BA)

ENERTECH Aviation & Maritime Academy- Doha, State of Qatar

September 30, 2010 (8:00am-5:00pm)

Industrial Electrician

MFI TECHNOLOGICAL INSTITUTE- MERALCO center, ORTIGAS Avenue, Pasig City Philippines

August 5, 2007 to September 30, 2007

Building Wiring Installation and Maintenance

MFI TECHNOLOGICAL INSTITUTE- MERALCO center, ORTIGAS Avenue, Pasig City Philippines

July 16, 2007 to August 14, 2007

PERSONAL DATA:

Date of Birth : August 18, 1977

Sex : Male

Citizenship : Filipino

Place of Birth : San Jose, Batangas Philippines

Marital Status : Married

Height : 173cm

Weight : 170 lbs.

Father’s Name : Edmundo A. De Torres

Mother’s Name : Iluminada H. De Torres



Contact this candidate