RESUME
THANGADURAI. A Contact: - Mob No:- 91-938*******
DEEE (DIPLOMA IN ELECTRICAL
& ELECTRONICS ENGINEERING) adbigi@r.postjobfree.com
adbigi@r.postjobfree.com
mailto:adbigi@r.postjobfree.com
Career Objective
To work in a creative and challenging environment where, I can utilize all my skills and abilities in the organization that offers professional growth while being creative, resourceful, innovative and flexible.
Work Experience
Total experience of working : Gulf :4.8 years ;
India:8+years
KUWAIT : 3.8 years in Oil &Gas Field (JO & KOC & KIPIC)
QATAR : 1 Years.
INDIA : 8.6 years.
APPROVED PERMIT RECEIVER FROM FDHJV/KOC/JO
1)Organization : GOMS ELECTRICALS PVT LTD, Chennai,
CLIENT : Under BYD / PMC-CBRE
Duration : from 18.11.2018 to Till Date.
Designation : Electrical Site Engineer.
Project : RENOVATON OF BYD PVT LTD,
2)Organization : Nasser Al-Baddah Trading Company(NBTC),
CLIENT : Under FDHJV / PMC - AMEC FOSTER WHEELER
Duration : from 30.09.2017 to Till Date.
Designation : Electrical and Instrument Supervisor.
Project : New Refinary Project (K-408)
3)Organization : IMCO Engineering and Construction W.L.L
P.O.Box: 9309 Ahmadi 61004 Kuwait
CLIENT : Under JOINT OPERATIONS / KOC
Duration : From 08.07.2013 to 15.09.2015
Designation : Electrical and Instrument Supervisor
Project : (P-118) ELECTRIC POWER SUPPLY FOR WAFRA
FACILITIES
: (P-129) FIRE PROTECTION SYSTEM FOR KOC
ASSETS
4)Organization : Amwaj Catering services., Qatar.
Duration : from 16.11.2015 to till date
Designation : Electrical Supervisor.
Project : Electrical Facility Management
5) Organization : MACK TELECOM SERICES PVT LTD.,
Bangalore, INDIA
Duration : from 20.11.2008 to 20.05.2011
Designation : Assistant Engineer (Electrical)
Reason for leaving : on completion of contract
roles
Creating of BOQ as per the basic requirements of the project
Preparing of Estimation for the materials like Sub panels, Power DB, Lighting DB, Cables, Ladder & perforated trays, Earthing flats, junction box etc.,
Following up with the design team for getting approval for the drawings with the client,
Following up with the QC team to receive the FAT/SAT documents and getting approval with the client,
Co-ordinating with different vendors for the materials to be unloaded at site as per requirement
Completing FAT with the clients and rectifying the comments with the support of vendors,
Making MIR for the Materials unloading at the site,
Completing Installation & Erection works with the safety and Standard requirement
Conducting daily safety meeting and Tool Box meeting with the technicians and Helpers
Receiving and arranging Permits according to the work basis,
Getting clients approval for the Erection Checklist, Cable Megering list, Earth pits megering list, Testing & Commissioning Checklist.
Updating the MIR, Erection Checklist with the BOQ quantity for future use purpose
Making PR for the Estimated materials and following up the PO for unloading the materials to the site,
Maintaining of the store stock list of electrical items by making proper PR,
Creating of BOQ for Increased and decreased items from the work order of the project
Raising the bills for the supply and Erected quantity as per BOQ
Approving the Sub-contractor Bills as per the quantity erected in the site.
Supporting with the Testing & Commissioning team to complete the Pre-commissioning.
responsibilities
Installation of LV & HV Switchgears, Oil cooled indoor/outdoor type transformer upto 2500KVA, DG set upto 2500KVA, Bus ducts for Transformer/ DG set up to 2500Amps, according to the standard
Installation of MPCC Panels, MSB Panels, SSB panels, APFCR Panels, MCC Panels, Fire panels, UPS Panels, Battery Banks, Power DB, Lighting DB, HVAC Panels, AHU LPSB Panels, LPRM Panels, Manual COS Panels, UPS DB, EICS Cabinets, AC, VCB. Indoor Outdoor Feeder Pillar Panels, according to the standard
HT and LT Cable Pulling, Control cable pulling, Instrument Cable Pulling, Data Cable Pulling, MICC cable pulling, Cable megering, Indoor and Outdoor HT Glanding and termination, according to the standards
Installation High Bay Light fixtures, Explosion proof light fixtures, Tube light fixtures, Flood Light fixtures, Junction Box, Isolator, Cable Ladder and trays, Street light poles with light fixtures, according to the standards
Installation of Earth Pits with, Copper/GI 3mtr rods and GI Pipe earth Pits, Earthing with Different size of Flats and earthing cables, HT Panels and Transformer Neutral earthing, Installation of Neutral Panels, according to the standards
Installation of Jockey pumps, Sub mersible motors for WTP/STP,
Installation of Indoor and Outdoor AJB, DJB, Smoke detectors, Manual Alarm call Point, Fire Horn, Fire strobes, High sensitivity smoke detector, Fire alarm panels,
Installation of HVAC Instruments MVD, MD, PT, HT, TT in indoor/outdoor and in HVAC Ducts
Lighting Arrestor for the Whole Substation by installing Copper Strips, Copper / Aluminium round conductors, 2mtr and 3mtr Air terminals, Junction Boxes and Separate Earth Pits.
EDUCATIONAL QUALIFICATION
SSLC Passed Out in 2003 from St. Mary’s Hr. Sec. School, Vickramasingapuram with 75%
HSC Passed out in 2005 from St. Mary’s Hr. Sec School, Vickramasingapuram with 80%
PROFESSIONAL QUALIFICATION
Diploma in Electrical and Electronics Engineering from Gomathi Ammal Polytechnic college, Malayadikurichi, Thirunelvelli district, Tamilnadu in 2005 to 2007 with 83% in Final Year.
Computer/Software Proficiency
MS-OFFICE,AUTOCADD,
Personal Details
Date of Birth : Oct 11, 1988
Father’s Name : Shri G.Arumugasamy
Occupation Of Father : Senior spl. Grade Foreman in Tamilnadu Govt.
Electricity Board.
Martial Status : Married
Gender : Male
Nationality : Indian
Permanent Address : 2a,Balaji Avenue 2nd st.,
Thatchanallur-627358,
Thirunelvelli dist,Tamilnadu.
Declaration
I hereby declare that all the information furnished above is true to the best of my knowledge.
Place:
Date: (A.THANGADURAI)