Resume

Sign in

Power Plant Mechanical Engineer

Location:
Liliw, Laguna, Philippines
Posted:
January 14, 2020

Contact this candidate

Resume:

RESUME

Winston Perrie R. Soledad

PERSONAL PARTICULARS:

Date of Birth : October 14, 1957

Place of Birth : Surigao City

Civil Status : Married

Height : 5'4"

Weight : 135 lbs.

Passport No. :P5548814A Date Issue:09-01-2018 Exp.Date: 08-01-2028 PROFESSIONAL EXPERIENCE:

Multi-discipline engineer with 34 years work experiences in the field of Mechanical Engineering, Involved in EPC mostly in power generation and Industrial process plants, Installation, erection, commissioning, operations, and maintenance. Also involved in the design, evaluation, modification and revisions of plans prior for construction and installation. Hands on experience in the field. Project Management, Sales and Business Development. SPECIAL QUALIFICATION:

With experience in Pre-commissioning, Commissioning, Start-up and Shutdown Operations of Thermal Power Plant, Combined Cycle Power Plant, Industrial Plant and related Auxiliary Equipments which includes Steam Generator (Coal / FO / Fuel Gas Firing Boiler), Heat Recovery Steam Generator (HRSG), Steam/Turbine, Gas Turbine, Industrial Package Fire Tube Type Boiler, Diesel Generator (for emergency back-up), and balance of plant (BOP) equipments, such as Fuel oil and fuel gas system, HP and LP feed water system, Instrument air and service air system, Nitrogen plant facility, Service water system, RO Plant / Demineralized Water Treatment Plant, Potable plant, Chlorination plant, HVAC (Water Chiller System) Prepare documentation on equipment package systems prior to pre-commissioning and commissioning. Responsible to give instruction to operation staff (operators’) to carry out equipment/system valve line-up/line tracing in preparation for commissioning test schedule. Also prepares necessary tools and materials for pre-commissioning and commissioning activity such as: lube oil flushing, cooling water line flushing, instrument and service air line flushing, fuel gas piping pegged cleaning and fuel oil line flushing, acid cleaning of boiler and main steam lines, motor and equipment trial run operation test. Responsible for trial-run operation of motors and each related equipment/system(s). Responsible for daily log record keeping of equipments in operation and report to immediate supervisor for any abnormality observed during operation EDUCATIONAL ATTAINMENT:

Graduate of : Bachelor of Science in Mechanical Engineering (BSME) From : University of San Jose Recoletos (USJ-R), October1978. Masteral Degree : 6 units in Management Engineering. Level 3 British English : Dudley Technical College, Dudley,UKComputer literate on different software’s such as Microsoft and other technical software’s.

GOVERNMENT ILLIGIBILITIES

Registered Mechanical Engineer Cert. No. 19703 dated 15 August 1980 Certified Cartographer Cert. No. 30320 dated 28 March 1979. Incorporated Mechanical Engineer (IMechE) UK Reg. No.80141603 Permanent Home Address

Mabini Plains Subv. Block 10

Lot 5&6, Brgy. Mabini

Cabadbaran, Agusan del Norte

Philippines

Land Line . +638********

HP No. +639*********

E-mail: adbaru@r.postjobfree.com

WORK EXPERIENCES:

1 April 2018 – December 2018

Black & Vetch Philippines (EDCOP)

QA/QC Mechanical Engineer Inspector (Consultant

1x 500MW Mauban Coal Power Plant (Super Critical Power Plant Project) Philippines)

As an owner engineer oversee the construction and installation of different packages such as the Boiler/Steam Turbine and Auxiliaries, BOP’s, Tank Farms, WTP and Plant services. Does the quality inspection and acceptance of the equipment installed and pre –commissioning.

2 May 2007 –Jan 2018

Granite International Services/Field Core (GE)

(On Call Contract)

Philippines

Projects Assignment:

December 10 – December 19 (2018)

Mechanical Steam Turbine T/A (GE/Alstom)

Concepcion 1 Thermal Plant 1x150MW)

Ilo-ilo City, Philippines

in charge of the management responsibilities including planning, organizing, integrating and monitoring of resources such as labor, supervisors, tools and technical assistants as required to complete the work scope according to contractual requirements.

* Installation & maintenance on Steam Turbine, Generators and auxiliaries

* Trouble shouting and diagnostic on Steam Turbine, Generators and mechanical system and Auxiliary System; September 5 (2017 – October 20(2017)

Mechanical Steam Turbine T/A (GE/Alstom)

TVE (Therma Visayas 2x150MW) Fluidized Bed Power Plant Toledo City, Philippines

in charge of the management responsibilities including planning, organizing, integrating and monitoring of resources such as labor, supervisors, tools and technical assistants as required to complete the work scope according to contractual requirements.

* Installation & maintenance on Steam Turbine, Generators and auxiliaries

* Trouble shouting and diagnostic on Steam Turbine, Generators and mechanical system and Auxiliary System; May 2017 – October 2017(GE Oil/Gas)

Mine Power Energy ( 3x55 MW Coal Power Plant) CFB Boiler Plant in charge of the management responsibilities including planning, organizing, integrating and monitoring of resources such as labor, supervisors, tools and technical assistants as required to complete the work scope according to contractual requirements.

* Installation & maintenance on Steam Turbine, Generators and auxiliaries

* Trouble shouting and diagnostic on Steam Turbine, Generators a; mechanical system and Auxiliary System;

*Provide technical expertise to customers, service support, field technicians and operators;

* Provide external and internal timely and accurate professional reports

* Ensure contractual obligations are met;

* Play a proactive role in problem identification & resolution;

* Manage network of resources (including contractors and subcontractors) in support of contract/project execution;

* Ensure all in-field activities carried out safely complying with company Environmental health & Safety (EHS) guidelines and procedures.

3 February 2015 – March 2016

Site Mechanical Engineer/Commissioning Engineer (Owner’s Engineer) Qaiwan Group (Bazyan Combine Cycle Project 750MW),Iraq As an owner engineer oversee the construction and installation of different packages such as the BOP’s,Tank Farms, WTP and Plant services. Does the quality inspection and acceptance of the equipment installed and pre – commissioning.

4 June 2013 - Jan 2015

T/A / Lead Commissioning Engineer, (Pahang Malaysia) Industrial Power Technology

Technical adviser and Lead Commissioning engineer in Biomass power plant in Malaysia, In charge in plant commissioning and start-up.

5 January 2013 - April 2013

Sr. Mechanical Engineer (Chana,Thailand)

2x1000MW Combine Cycle Power Plant Project (Siemens) Marubeni Power

Role Supervisor/Team Lead

Supervised and overall in charge BOP installation in Water treatment Plant and composite piping works of the CCPP project in Chana 2 power plant CCPP.

6 July 2009 - June 2012

Planning Engineer (Tipton, Midlands UK)

Doosan Power System.

Industry Utilities / Power

Role R&D Engineer

Department Planner in development of new mythology in construction and fabrication of Industrial components for power plants and industrial plants.

7 April. 2009 - July 2009

Section Engineer (Bridgewater,Sommerset, UK)

Doosan Babcock Energy Ltd, Renfrew, Scotland

Assigned in Hinkley B Nuclear Power Station in Bridgewater, UK where outage is being undertaken in retrofitting works of the power station for life extension. Assign in BCU(Boiler Enclosure Unit) and re-piping works of steam line and auxiliaries.

8 May 2007 – April 2009

Project Manager

Truba Arabia Engineering Co. (Jeddah, KSA)

Overall in charge in management and execution of project assign by the company, Conduct progress meeting with the project team and liaise with the client and their consultant for whatever changes of the work being done and other related matters

Project Undertaken:

Project Manager: KAAU CUP-2 Project (King Abdul Aziz University Central Utility Plant), Jeddah. Aug. 2008- March 2009

Support Project Manager : Shoiba Power Station Stage 2, 6x400MW Steam Power Plant LPO by Alstom Power, client Saudi Electric Company (SEC), Shoiba, Jeddah, May 2008- Jan. 2009

Project Manager : Najaran PP# 10 OCGTPP 1x 60MW (Client Saudi Electric Company, Frame 7FA (GE) (Fast Track Project) Sept.2007 – May 2008

Support Project Manager: Riyadh PP9 OCGTPP 10 x 60MW(Client Saudi Electric Company, Frame 7FA (GE) May 2007- July 2007

9 July 2003 - April 2007

Project Site Manager (Thailand, Malaysia)

INDUSTRIAL POWER TECHNOLOGY PTE LTD

Over all in charge in the execution, Managing of project such as construction, fabrication, installation and commissioning of the power plants.

Project Manage:

1. JS Energy Co. 7.0MW Power Plant Jong Stit Industrial Park, Bang Bon Samut Sakhon, Thailand 2. MGP 10MW Rice Husk Fired Power Plant Surin, Thailand 3. FELDA Biomass 7.5MW PFB Fired Power Plant Lahad Datu, Sabah, Malaysia 10 Apr 2002 - Jul 2003

BUSINESS ADMIN. MANAGER

BABCOCK-HITACHI PHILIPPINES

Oversee plant operation of each department. Apply company quality standard of manufacturing. Assist the president in implementation of company guidelines. Act sometimes as project manager of projects being undertaken by the company.

11 Feb.2000 – Feb 2001

Turbine & Auxiliaries Commissioning Engineer, (Allepo,Syria) Mitsubishi Heavy Industry, MHI Takasago

Duties: In charge in pre-com & commissioning works of Aleppo Thermal Plant 5x213Mw Steam Turbine generator and its Auxiliaries. Train client engineers & operator in standard operating procedure and safety of the plant equipments. Accomplishment: Completed all the testing and acceptance performance as per contract agreements. 12 Jan 1999 - May 1999

Mechanical Engineer (Singapore)

Kranji Sewage Treatment Works Phase III

KSTW-III, Ministry of Environment Singapore

EBARA CORPORATION, SINGAPORE

Duties: In charge in commissioning of Sludge Treatment Plant (STP) and its equipment, train client operators in process plant operations. Accomplishment: Completed in advance schedule due to good teamwork. 13 December 1995 – January 1999

4 years 1 month

Project Coordinator/Proj. Engr/Comm. Engr. (Indonesia, Malaysia) Industrial Power Technology Pte. Ltd

Duties: Oversee company project in ASEAN region, erectly involved in the construction work from conception to post construction, commission the plant and train client operators. Accomplishment: Completed the task and testing of the plants for acceptance of the project.

14 February 1995 – December 1995

Boiler Commissioning Engineer (Singapore)

Ishikawajimaharima Heavy Industries IHI

Role Supervisor/Team Lead

Duties: Plan and schedule the pre-&commissioning work of 3x375MW Reheat Boilers and its auxiliaries, start- up and shut down, operation of the said units conduct testing, and other safety test of the equipment and to keep the plant in good condition prior to hand over to client. Accomplishment: Completed the schedule task of my work and contract 15 February 1994 – November 1994

Commissioning & Start-up Operator (Dubai, UAE)

Dubai Electricity and Water Authority (DEWA)

Duties: Responsible in site testing and commissioning, and operation of equipments such as WHRB,GT,Desal plant at Central control room DCS and on local site, and shutdown of units, conduct corrective maintenance during operation and shutdown, assist in plant training of operators. Accomplishment: Completed all job task and keep the plant in good operation prior to hand over to the owner.

16 September 1991 – October 1993

Power Plant Supervisor (KSA)

ABV ROCK GROUP KB

Duties: In charge during installation and construction of the Diesel Power plant 10 units, and commission the plant and operation, maintenance and plant management, overall in charge of operating personnel during shift operation. Accomplishment: Keep the plant in good condition during operation and minimized the down time due to good maintenance to maximized plant utilization as per program. Reason for leaving did not re contract. 17 April 1987 – September 1991

Shift Charge Engineer (Phil.)

Ludo and Luym Corporation

Duties: Power plant operation in charge during shifting operation of the power plant, direct controls of all operators of the plant and to keep the plant in good condition to maximize the company production, to keep continuous power supply to the complex. Accomplishment: During my entire stint with the company only encounter minimum problem during operation due to proper operating procedure of the plant equipment and minimized shutdown. Reason for leaving: To work overseas and carrier advancement. 18 January 1984 – March 1986

Turbine Supervisor/Boiler Supervisor(Phil.)

Semirara Coal Corporation

Duties: In charge in the turbine plant section of the power plant supervised operators and technician under my shift and to keep the plant in good operation to maintain steady power supply to the mine complex. And to give decision in times of emergency. Accomplishment: Conduct study and improvement of the plant operation and some modification of process system to maximize the utilization.

19 January 1981 - December 1983

Mechanical Works Engineer

ERECTORS INCORPORATED(Phil)

AGUS V Hydro-Electric Power Plant Project 2x55MW

Duties: Involves in supervision of installation and inspection works of various mechanical equipment and check sub contractor accomplishment and check workmanship as per specification required. check bill of materials and billings from contractors. Accomplishment: Done all the specific duties required to complete the project on schedule. TECHNICAL TRAINING ATTENDED

1 MS PROJECT INTRODCUTION AND ADVANCE COURSES

Conducted By: Computer Training Solution, Birmingham UK Date : 3-12 March 2010

2. HEALTH AND SAFETY IN THE ENGINEERING CONSTRUCTION INDUSTRY COURSE Module 4 Conducted by: Institution of Occupational Safety and Health (IOSH) with association with ECITB UK Date : Oct. 27 to 30 Oct. 2009 Cert. No. 883523 Issued: 12 Jan. 2010 3. MANAGGING SAFETY IN THE ENGINEERING CONSTRUCTION INDUSTRY Conducted by; Engineering Construction Industry Training Board (ECITB) UK Date : 27 Oct. to 30 Oct. 2009

4. Government Scholar in Construction Management Development Foundation, CMDF, Training Programs for Plumbing and Pipefitting given by JICA, July 1986 to October 1986 5. Attended in Diesel Power Plant Operation Upgrading Program given by CATERPILLAR, TRACTORS, Jeddah, K.S.A

Date : March 9 to March 10 1991

6. FAG SOUTH East Asia BEARING LUBRICATION AND MAINTENANCE SEMINAR Conducted By: FAG SEA CORPORATION

7 SUPERVISORY UPGRADING SKILLS TRAINING PROGRAMS FOR SUPERVISOR Conducted by: Semirara Coal Corporation and Don Bosco Technical College Date : November 26 to December 1984

8. QUALITY CIRCLE LEADERSHIP COURSE

Conducted By: Semirara Coal Corporation, HRD

Date : March 9 to March 12 1985

9. SUPERVISORY DEVELOPMENT TRAINING PROGRAM

Conducted By: NMYC - WORLD BANK TRAINING PROGRAM

Date : October 22 to October 26 1985

ORGANIZATION AFFILIATED

1. Philippine Society of Mechanical Engineers (PSME) 2. American Society of Mechanical Engineers (ASME) (In Active) 3. Institute of Mechanical Engineer (IMechE) UK (In active) REFERENCES:

1.0 Duane Schumacher

President

Energy Experts Now

Dominican Republic

Tel. No. +1-809-***-****

HP- +964**********

2.0 Edilberto Sabandal

Project Manager

AVP Trading and Construction Inc.

Cagayan de Oro, Philippines

HP No. +639*********

3.0 Danny Hoon

CEO/Managing Director

Faeda Industrial Power Technology

Singapore

Tel. No. +659*******

4.0 Jason Tan

Senior Project Director

Industrial Power Technology IPT

Singapore

HP - +659*******

DECLARATION

I declared that all the information mention on my resume are true and correct in the best of my knowledge and beli



Contact this candidate