Resume

Sign in

Civil construction manager

Location:
Ahmedabad, Gujarat, India
Salary:
As per the scale
Posted:
January 13, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

NAME : PIJUSH KUMAR BANDYOPADHYAY.

DATE OF BIRTH : Six January 1968 (06.01.68).

NATIONALITY : Indian.

PERMANENT ADDRESS : 105, JOYNARAYAN BABU AND ANANDA DUTTA LANE. HOWRAH- 711101. WEST BENGAL

. PHONE – 933*******; Mo. 967-***-****.

E MAIL ID : adbac8@r.postjobfree.com; adbac8@r.postjobfree.com MARTIAL STATUS : Married.

PASSPORT DETAILS : G 4832829;

EDUCATIONAL QUALIFICATION:

Year of

passing

Name of

Examination

Name of Institution Name of Board

% of

Marks

1991

Diploma in CIVIL

ENGINEERING.

Jnan Chandra Ghosh

Polytechnic. Kol - 23

State council of Engg.

& Tech. Education,

Gov. of W.B.

68%

1986

Higher Secondary

Examination.

Sri Ramakrishna

Sikshalaya. Howrah

– 1.

W.B. Council of

Higher Secondary

Education.

48%

1984

Madhyamik

Pariksha (S.S.C).

- Do -

W.B.Board of

Secondary Education

60%

ADDITIONAL

1997 Foundation Course in

computer application.

NIIT at Thane Dist. Maharashtra. 70%

2009 MS Project CADD CENTER Completed

COMPUTER KNOWLEDGE : MS Project, MS-Word, MS-Excel, Power Point etc. PROFESSIONAL EXPERIENCE:

From May’ 2010 to Jan’2020 with SHAPOORJI PALLONJI & CO LTD.

April ’19 to Jan’2020, at Commercial Building Project at Ahmedabad ; Gujrat. Construction of 16 Story Building & 4 Basements. Client: VENUS housing group. PMC: Master Management consulting Pvt. Ltd; consisting of RCC structure, PT slab. Floor area : 70000 sqm. Project value 165 crore.

Oct ’17 to March’19 MASS HOUSING project at Guntur, Vijaywada. AP Client: AP Township & Infra. Development corporation, As Construction Manager, Construction. of Row Housing project,Consisting 4200 flats, RCC STRUCTURE by using MIVAN system, Finishing work, UG services &Roads etc.

Nov ’16 to Sept’ 17, at SUKHOBRISTY MASS HOUSING project, Kolkata. Client: Bengal Shapoorji Housing project, As Construction Manager, Construction. Of 14 storied Housing complex at Rajarhat- kolkata work etc. Complete RCC STRUCTURE by using of MIVAN shuttering system.

Feb ’15 to Oct’16 date, at DIAMOND HARBOUR HOSPITAL project. WB Client: MSCB .WB, Consultant : RITES LTD.As Construction Manager, Const. of Super Specialty Medical Hospital bldg. of capacity 300no. Including Medical equipments etc.

Nov ’12 to Feb’15, at TCS IT PARK Project at Rajarhat, Kolkata. West Bengal Client: TATA CONSULTANCY SERVICES; Consultant: TATA CONSULTING ENGINEERS Ltd. As Construction Manager, Construction. of IT Office Complex of capacity 12000 SQM of floor area consisting of DMC Pile, RCC wall, column, Pre Stressed slab etc all complete.

May’10 to Nov’12, At Rourkela Steel Plant Expansion Project at Orissa. Client: Rourkela Steel Plant. (RSP), Consultant: M.N.Dastur (P) Ltd. As Construction Manager, Construction. Of Pre heating Furnace, and other structures of Mill area, consisting RCC Raft, wall, column, Deck slab, fixing of Insert for structural and equipments work etc.

From Jan’ 2009 to Dec'2009 with Afcons Const.Mideast LLC at Dubai-UAE. An Associate Co. of M/S Shapoorji Pallonji & Co. Ltd

Jan’09 to Dec’09, At Infrastructures Development project, MDN; Dubai. Client: Road & Transport authority (RTA) ; Consultant – AFRICONS & ALL BURJ JOINT VENTURE, As Execution Manager, Construction of Post Tension Bridge consisting Piling work, foundation & Superstructure of Pier, Deck slab etc. From Jan’ 2008 to Dec’2008 with SimplexInfrastructures Ltd. at Doha-Qatar.

Jan’08 to Dec’08, At Power Plant (Gas based) Construction for Qatar Aluminum factory (QATALUM).Main contractor-Doosan H.I. & Const. Co; Consultant – Mott MacDonald. As Asst. Manager (QA); Preparation of Project Quality Plan, Method Statement of all activity, Vendor and project material approval, Submission of PQ Doc. etc and interaction with consultant etc. From August’2004 to Dec’2007 with Larsen & Toubro Ltd. (ECC Div.)

Aug’04 - May’05, At Bangladesh,Lafarge Cement Plant construction. As Sr. Engineer in const. of Raw Mill Feed Hopper, LSS Shed, Sub Station Bldg etc all RCC work including Piling, pile cap, Foundation, superstructure etc and handing over the same to the other Agencies etc.

June ’05 - May ’07, At Guwahati, National Games Stadium & Village construction. As Sr. Engineer in const. of RCC Structure and Finishing work of Stadium ( Rajiv Gandhi Stadium) and Township concrete bldg,(G+6 Full RCC framed) from foundation, Superstructure & finishing Activities all etc and handing over to GMDC.

June ’07 to Dec ’07, at Kolkata Leather Complex, CTS IT Park construction. As Sr. Engineer in Process Quality control, Batching plant operation etc and ISO Site Coordinator (QA Engg.).

From May’2003 to July’2004 with Simplex Concrete Piles (I) Ltd.

May’03-July’04, At Surat, Shell-Hazira Port and LNG Terminal Project Consultant-Technimount ICB & SAIPEM) As Asst. Engineer in const. of Sub Station bldg, Pipe rack consisting of sub. & superstructure, all RCC, Insert fixing, finishing and handing over the project etc.

From June’1998 to April’2003 with Gammon India Ltd.

June’98-July’99 At Nagaland, Doyang Hydro-Electric Project. As Asst. Engineer in preparation of client billing, Monthly cash flow, Rate analysis, dept. billing etc.

Aug’99-Sept’2002 At Tamilnadu, Adavinainar Koil Masonry Dam Project. As Sr. Engineer in const. of R R Masonry, RCC Retaining etc and ISO Site coordinator (QA-QC Engineer)

Oct’2002-Apr’03 At Orissa, Bridge Project on NH 60. Client-National Highway Authority, Consultant-Louiceberger

(USA) & Lee Associates. As Sr. Engineer in const. of Flyover & bridge for National Highway Project. Supervision of DMC Pilling, Pile cap, Abutment wall, Pier, Bridge deck slab, Voided Slab etc.

From July’1996 to May’1998 with Unitech Ltd. Mumbai.

July’96-Feb’98 At Virar, Mumbai. Town ship (Bldg) Project. As Sr. Supervisor, Grade- II. Supervision of all civil activities –Piling, Foundation, sanitary, plumbing, finishing etc of Township bldg

Mar’98-May’98 At Khandala, Hill Retreat (Bun glow & Housing) Project. As Sr. Supervisor, Grade- II. Supervision of all civil activities etc like Piling, footing etc all RCC of superstructure, finishing work, Area Development (Till handed over) etc.

From October’1991 to June’1996 with Panchdeep Construction Pvt Ltd.

Oct’91-June’96 At Howrah, Indoor Stadium Construction. As Junior Engineer, Supervision of pilling work & super Structure of Indoor stadium Including finishing activity etc.

Date :

Place :

PIJUSH KUMAR BANDYOPADHYAY.



Contact this candidate