Chetan K Kumawat

E-Mail: adavtb@r.postjobfree.com

Contact:+91-853******* & 089********)

Date:

Place:

To

The HR Manager

Dear Sir / Madam,

I am Chetan K Kumawat, (DCS engineer) having experience in Power plant commissioning, DCS operation. I have good management and technical skills to solve any kind of problem in all situations. I am a good learner; my enthusiasm in work will give better output. I am searching some better opportunity to work. Herewith I am sending my updated resume for your kind reference. If I am selected, I’ll give my best in all times.

Thanking you

Chetan K Kumawat

+91-853******* & +91-894*******)

Enclosure: Resume

Contact Info

: +91-853******* &

+91-894*******

Email: adavtb@r.postjobfree.com

Experience Summary

Total : 7+ years

Employment Details

Current organization :

Thermax Limited

Site at: JK Laxmi Cement Sirohi Rajasthan

Current Designation :

Control Room Engineer

Personal Details

Gender

Male

Nationality

Indian

Marital Status

Married

Date of Birth

March 5th 1990

Father’s Name

Mr.Khemraj P Kumawat

Languages Known

Gujrati, English & Hindi

Address (For Communication):

68,part no.1,at post – tana, Teh.-Bhupal sagar,DIST.-Chittorgarh, (Raj) 312205

Objective:

To be part of a progressive company which encourages nurturing my technical skills on an ongoing basis, to take up independent responsibilities and execute them unfailingly for the betterment of the company.

Resume headline:

DCS engineer having 7+ years of experience in the field of Power Plant Operation.

Professional Experience:

M/s Thermax Limited site at jk Laxmi cement sirohi rajasthan, as a control room engineer nov 2017 to till date.

M/s Thermax Limited site at India cement ltd Banswara rajasthan as a control room engineer 24th jan. 2017 to nov 2017.

M/s Shri Sai Pumps And Energy Systems Pvt. limited (Site at surat)as a Boiler DCS engineer from 1stsep. 2013 to 20th jan.2017.

M/s Cethar Energy limited (Site at surat)as a Boiler Field operator from 1stjuly 2011 to 31 aug. 2013.

Skill Set:

Packages

MS-Office

Others

Proficient in MS word

Education:

1st Class Boiler Attendant

Ahmadabad, Gujarat, Year of passing-2014

Diploma (Mechanical)

Singhania University, Panchari, Jhunjhunu(Raj.) Year of passing- 2012 (Distance Learning)

2nd Class Boiler Attendant

N.C.V.T Vadodara Gujarat, Year of passing-2011

Apprentice Training

Jubilant Organosys Pvt. Ltd. Gujarat, 2008-2011

H.S.C

Rajasthan Year of passing-2008

S.S.L.C

Rajasthan Year of passing-2006

Experience / Jobs involved:

A. M/s. Cethar Energy Ltd. Tiruchirappalli.

Site at: Garden Sillk Mills

Ltd. Jolwa Surat.

Period: (July 2011 – Aug 2013)

Grade: Field Operator

B. M/s. Shri Sai Pumps And Energy Systems Pvt. Ltd. Tiruchirappalli.

Site at: Garden Sillk Mills

Ltd. Jolwa Surat.

Period: (Sep 2013 – Jan 2017)

Grade: DCS engineer

C. M/s Thermax Limited

Site at :India cement ltd Banswara Rajasthan

Period :Jan.2017 – Nov 2017

Grade :Control Room Engineer

D. M/s Thermax Limited

Site at :JK Laxmi Cement Sirohi Rajasthan

Period :Nov 2017 – Till date

Grade :Control Room Engineer

Highlights of Thermal power plant: - 3*18MW, 80TPH- 85ATM-515oC-Top AFBC Boiler-Pet Cock fired-Impulse Reaction turbine with Extraction Cum Condensing at JK Laxmi cement sirohi rajasthan..

Highlights Thermal power plant – 1*20 MW 95 TPH CFBC Boiler at India cement ltd banswara rajasthan.

Highlights captive power plant – 1*21MW 1*18MW 93TPH 87ATM 515oC Gardan sillk mills ltd surat.

Operation:

Working as an Operator of the power plant through distributed control system.

Maintain the Boiler water parameters. Maintain the operation of such equipment as boilers, stokers, pumps, air compressor, and other equipments.

Good Knowledge of Hot start up, Cold start up and Hot box up procedure of Boiler.

Maintain and check the Turbine parameters regularly (Pressure, Vibration, Temperature, etc.,)

Check daily logs to determine proper operation of equipment.

Commissioning:

Pre commissioning of boiler such as Hydraulic test, Slow firing, Alkali boil out, Passivation & Steam blowing.

Commissioning of all Ash handling system.

Commissioning all rotating machines (like Boiler feed pumps, ACWP, CEP, DM water pumps and fan.

Commissioning all fuel feeders (coal feeder & spreader, Bagasse feeder & distributor).

Key Strengths :

Highly flexible and can adapt to any situation and circumstances.

Leadership quality with strong work ethics.

Effective team player, Self-learning and self-confidant.

I here by declare that the information and particulars furnished above are true to the best of my knowledge.

Place : Sirohi Rajasthan truly

Date : (CHETAN K KUMAWAT)



Contact this candidate