Resume

Sign in

Civil Engineering Project

Location:
Visakhapatnam, Andhra Pradesh, India
Posted:
November 02, 2019

Contact this candidate

Resume:

VENKATESH KALLAAddress: No-**-***, Laxmi Nagar,Gandhi Graham, Chodavaram,Visakhapatnam, Andhra

Pradesh – 531036 Mobile: +918*********, Email:adaqm6@r.postjobfree.com. Offering 5year’s experience; capable of driving entire operations of a Project Management, Site Execution, Quality Control, Safety Department, Quality Analysis &Regular Annual Billing it to a growing & viable entity; seeking assignments across Construction sector.

PROFILE SUMMARY:

● A result-oriented professional with over 5 years of expertise in Project Management, Site Execution, Quality Control,Safety Department,Quality Analysis & Regular Annual Billing in Construction Sector.

● Experience in devising significant solutions, managing day-to-day facility management,Execution&Construction operations and projects for making effective utilization of man, machine, method & materials

● Excellence in managing maintenance processes to optimize Execution(equipment availability, energy & productivity), implementingpreventive & predictive maintenance system / condition monitoring and conducting reliability study & cost benefit (short & long-term) for equipment.

● Skills in applying continuous improvement principles to increase process and Site Execution; managing operations involving resource planning, materials planning, procurement, in-process inspection, team building and coordination with the internal/external departments

● In-depth understanding of industry, technology trends with instituting quality control techniques to achieve product excellence at the lowest overall costs.

● Proficient in executing project activities at shop floor; skilled in conceptualizing process initiatives, streamlining procedures & increasing productivity while executing technical, complex projects from inception to completion

● Leader with excellent communication, negotiation and relationship building skills; proven track record of establishing processes & SOPs, streamlining workflow and creating environment to enhance productivity

● Proven competencies in judiciously managing manpower, machines and materials resources to generate maximum operational efficiency.

● Capable of maintaining harmonious industrial relations to ensure hassle free Project Executions. Team leader, trainer and a motivator with well-organised work habits and exceptional problem-solving skills. Core Credentials

Project Management&Site Execution Construction Management Specialization

Stressing Quality Control

WORK EXPERIENCE:

November’13 – Till Now MVR Infra Projects Pvt. Ltd., (MVR GROUP),Hyderabad as Project Engineerlooking for(Project Management, Site Execution,Quality Control, Safety Department, Quality Analysis & Regular Annual Billing)

Role:

ProjectManagement:

• Directing plan & process related activities with accountability for strategic utilization of available resources & machine loading; preparing work instructions for operations of the unit and maintaining reports for decision-making.

• Supervising all Project planning & control operations including technical inputs for innovative methodologies, identifying areas of obstruction and advising on process changes of site activities for improvements

• Working out various requirements with respect to utilities, machines, manpower & monitoring overall operations for ensuring timely completion; directing & instructing Maintenance Technicians; monitoring expenses with optimum utilization of resources

• Spearheading entire gamut of maintenance operations for mechanical infrastructure available at the large construction sites of the organization; assisting with planning and implementing plant improvements and expansions

• Reviewing the operation of Project equipment and systems constantly to minimize unplanned downtime, forecasting issues in a timely manner and identifying opportunities for improvement

• Preparing reports, analyzing data and recommending improving plans for Site operations and solving maintenance related problems; initiating and executing projects that reduce operating costs. Material Management:

• Overseeing the processes for maintaining stock level through rejecting materials found non- conforming to identify a course of action for disposition of disclosed ones in the Site.

• Maintaining a minimum inventory system; generating all MIS reports & documents / reports on self-life

/ slow moving materials, after updating all indents Quality Management:

• Maintaining & controlling quality standards to check all site activities; implementing QA / QC processes to monitor incoming & in-process activities on various Materials& records / documents

• Setting-up, calibrating, operating & maintaining a variety of laboratory equipment as specified by the requirements of study.

Audits & Inspection:

• Conducting various internal & external audits / inspections of materials to ensure that quality of incoming products is in compliance with pre-set technical specifications.

• Administering the following activities such as kaizen, cost reduction / optimization, space utilization and cross functional training

Process Improvement:

• Identifying the areas of bottlenecks & breakdown; taking steps to achieve zero accident through the application of troubleshooting tools like root cause analysis.

• Implementing operational techniques for reduction in cycle time & identification of improvement opportunities and cost reduction measures to achieve substantial reduction in project expenditure

• Designing and implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project.

Man Management:

• Recruiting, mentoring, training, capacity planning, of the team to ensure operational productivity; supervises Site maintenance personnel and ensuring that maintenance technicians are adequately trained, equipped, and motivated so that the maintenance program can be accomplished in a safe, timely, and cost-friendly manner.

• Deploying suitable manpower, equipment / materials and ensuring proper planning for timely execution of the projects; managing a team and guiding site staff members to address and resolve performance bottlenecks.

• Directing & instructing Maintenance Technicians; monitoring expenses with optimum utilization of resources.

Significant Accomplishments:

• Evaluated methods for the project as well as facilitated improvements in project work, these included Utility saving outcomes.

• Spearheaded production with 100% machine availability & 0.1% wastages.

• Initiated successful implementation of total Project, resulting in an increase of In time Completion of projects& savings by 20% in Project cost as well as through effective use of the rotation method for defect & rejection.

Knowledge Perview:

• Plan and Direct the Execution of Technical, Economical and Administrative Functions of Various Project.

• Active member of construction in Grand separator flyovers, Multi-level fly overs, Building Works & under pass (sub ways)

• Execution of Steel structure in Footings,Piers&Piers-caps,Desk slabsaccording to Drawings.

• Checking Workability of Concreate at Site.

• Construction of Pre-CastingGirderBy using Pre & Post Tensions Methods, Calculating Modified Pressure

& Elongation

• Quantity estimating as per Drawings. Scheduling Required Man Power & Machinery for Day to Day Work.

• Preparation of RA Bills as per Contractors Completed Work as per Reference Drawings.

• Checking of stressing & grouting in PSC Girders and Erection of PSC Girders in between spans of Piers. Making of Bearing Fixing Arrangements,Diaphragms and Desk slabs Castings.

• Giving Markings & levels by using Total station and Auto level.

• Tested soils to determine the Adequacy and strength of concreate, asphalts and steel foundations

• Computed load and grade requirements and material stress factors to determine design specification

• Implemented Complex Design software and drawing tools to plan and design transportations system

• Collaborated with Contractors and clients as the on-site Engineers several projects.

• Write Daily detail reports logging work progress for quality assurance process. AREA OF EXPOUSURE:

Project managment:

● Schedule and undertake periodic maintenance on all Siteequipment’s, components, and installations.

● Provide prompt response to inquiries whenever there is a breakdownand resolve the issue as quickly as possible.

● Ensure that equipment’s are in good working order so as to prevent disruption of activities.

● Assist in forecasting requirements, creating a budget and scheduling expenses for the Construction department.

● Keep record of all stock and supplies, including company’s Site equipment.

● Working in collaboration with the Construction team to formulate the best cost-effective Work.

● Help the organization to reduce Project costs.

● Troubleshoot machine breakdowns and provide preventive maintenance services.

● Learn new skills and attend training programs in other to increase knowledge of trends and best practices in the Projects.

● Provide safe working environment for members of staff, and ensure Projects induced accidents and mishaps are prevented.

● Support the company in increasing profitability by managing resources efficiently and making necessary recommendations.

EDUCATIONAL DEVELOPMENTS:

CIVIL ENGINEERING, 2013

VSPT College, J.N.T.U.K, University

Aggregate-65%

Class XII, 2009

Narayana Junior College, State board

Aggregate-71.4%

Class X, 2007

Sree Vignan Public School, State board

Aggregate-68%

PROFESSIONAL IT KNOWLEDGE:

• MS-Office Suite,

• Working Platform for Auto cad & Total Station

• Good understanding of Internet tools.

Date of Birth:04MAY, 1992

References:Available on Request

Languages: English, Hindi & Telugu

VENKATESH.KALLA



Contact this candidate