Resume

Sign in

Senior Electrical Engineer

Location:
Riyadh, Saudi Arabia
Salary:
15000
Posted:
October 23, 2019

Contact this candidate

Resume:

Bedwi Mohamed Daoud

Page *

Professional Electrical Engineer C.V

Name: Bedwi Mohamed Daoud

Address: Riyadh, Saudi Arabia,

Mobile# 009***********

Nationality: Sudanese

Email: adansd@r.postjobfree.com

Date of Birth: 1961

Years of Experience in Saudi Arabia: 15

Education:

Bachelor of Electrical Engineer, Faculty of Electrical Engineer, Alexandria University, Egypt, 1986.

Trainings & Certifications

Microsoft certificate Professional 2000,

Electrical Circuit Breaker & Short Circuit Calculations 2008 British Council Course 2012.

Membership in Professional Societies:

Sudanese Engineering Council (M SEC) Specialist No: EC/RE/1243 Saudi Arabia Certificate of Registration as Professional Engineer (PE) NO: 84829 Key Qualifications:

Develop Electrical Systems:

use software programs e.g. AutoCAD, Ecodial, dialux Excel sheet to design and perfect new electrical systems, design prototypes, troubleshoot potential issues, make changes to fix any issues, and create specifications and other details for systems. Create Documentation:

Throughout the design process, responsibility for documenting specifications, schematics, and diagrams regarding to projects. Produce reports addressing project progress and other details for managerial staff.

Provide Input in Electrical System Manufacturing:

use my expertise to assist in the production of electrical systems; helping to avoid problems and addressing any issues that might arise in the manufacturing process, thus reducing downtime and ensuring that the project adheres to time and budget expectations. Experience in working effectively with work groups across a global organization. Demonstrated ability to set and manage large budgets and resources. Strong commercial acumen and understanding of financial impacts of decisions with respect to project budgets.

Bedwi Mohamed Daoud

Page 2

Able & responsible for project execution within budget; identifies and exploits opportunities for cost savings.

Ability to build strong customer relationships and effectively negotiate with customers to resolve disputes and promote win-win solutions.

Effective change and conflict management. Proven decision making skills with balanced risk taking.

Functions effectively under pressure in environments of rapid change and conflicting demands and capable of multi-tasking.

know construction methodologies, read blueprints and understand other technical aspects of construction.

Time-Management, deadlines are crucial in construction, so making sure that everything is on time and moving smoothly is a critical part of the job. SELECTED ACCOMPLISHMENTS:

Hotel Project Description:

Al Fawaz Tower Project, King Fahd Road, Riyadh, Ramada is the Hotel Operator. The project is 4 star hotel, Area about 15000 m, Build up area is 1800 m Number of floors: 23, Number of rooms and suites 190, Parking lot has 3 basements with a total of 130 parking spaces, Cost of the project 100 million riyals Wyndham Hotel Group (WHG) brand guidelines and specifications for RMU, Transformer, Capacitor bank, uninterruptible power supply UPS,MDB,SMDB, Mechanical Loads, Grounding/Earthing, lightning, backup Generator, External/internal light, Lighting Control, Fire Alarm, IP CCTV surveillance, Voice over internet protocol Telephone, Public Address, Access control, data transmission, Master Antenna System. The Hotel Room Controller (HRC) enables full lighting control, curtain control and bedside panel integration for an enhanced guest experience and advanced energy efficiency in full service and luxury hotels.

GRMS: by using EnOcean Technology and standard protocols, Honeywell, Schneider, ABB, Legrand products, Guest Room Management System GRMS offers a fully integrated control, monitoring system & Interface to BMS and also communicates with your hotel’s Energy, Building, Lighting Management and Property Management System PMS for advanced functionalities.

Applications: control the lighting, the curtains, the temperature and the fan control unit with high ROI “Return on investment”

Infrastructure & Utilities:

Coordination’s with the all competent authorities Saudi Electricity Company (SEC), Ministry of Transportation (MOT), National Water Company (NWC), Saline Water Conversion Corporation (SWCC), Municipalities, Aramco, Metro, Telecom Companies & Others. Responsible for carrying out all the infrastructure electrical engineering activities with the required quality, budget and time schedule to ensure that the client requirements have been met.

Preparing, supervising the development of Project Execution Plan (PEP) Ensuring all engineering submissions meet the quality requirements of the Client. Developing recommendations for very complex designs processes and design changes to meet Client's requirements.

Maintaining/validating the adopted electric systems specifications and to perform regular review to ensure its integrity and suitability of the specified systems for project. Bedwi Mohamed Daoud

Page 3

Define clear roles & responsibilities and deliverable requirements in terms of both scope and schedule to all the team members.

Implementing of the scope of work as related to construction Manage and oversee the day-to-day construction management of the project Plan and developing organize the construction effort to formulate the most cost-effective plan to timely completion within budget and to implement the execution of that plan. Load out, installation the facilities in conformance with project specifications and Scope of Work in accordance with the approved Project Schedule. Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance.

Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions.

Communicated with customers regarding change orders and how they affected the projects, and redistributed manpower accordingly keep projects within established deadlines. Project Close-out.

Waste Water Treatment Plant:

Safety first and Adhere to Company Safety Standards and promote safety culture I was Manage all electrical construction effort.

Monitor and report to Project Manager for project details. Supervision for all sub-contractors activities, procurement and Constructions Liaison and coordinate with Utility Authorities on a technical basis Supervision on review construction for Lift station for wastewater pumping with all structural, wet well, valve chamber, control room, electrical and control systems and Wastewater treatment facilities and general infrastructure systems. Managing construction contracts regarding to approved shop drawing and materials. Carry out scheduled inspections to ensure that works are constructed in accordance with the contract documentation and method statements.

Liaison with the subcontractors, venders on all construction related matters. Monitoring and inspection of construction electrical and wiring work in accordance with quality requirements.

Daily field supervision on actual execution of works according to drawings and specifications for preparing As-Built drawing for approval.

Reverse Osmosis:

Material ordering regarding to Bill of Quantity (BOQ). Achieve coordinate with other disciplines.

Coordination with material deliveries with distributors for distribution, installation regarding to approved shop drawings, layout and pulling Medium & Low voltage network cables, erection equipment’s for desalinating deep wells water motors & valve control, filtration equipment, instrumentation & protection system. Develop working relationships with sub-contractors. Oversee the installation of multiple projects from beginning to completion Provide support and work closely with staff to ensure projects are completed efficiently and on time.

Coordinate post inspections to verify installations have been completed as proposed. Problem solves various challenges that arise on projects. Prepare and submit final documents for billing purposes. Bedwi Mohamed Daoud

Page 4

District Cooling Plant:

Carrying out all electrical works installation activities of district cooling plant. Preparing compliance statements, method statements technical submittals Lightning layout Monitor and report to Construction Manager for project details, including progress, risks and opportunities in a timely manner.

Ensures all changes to specifications, work scope and drawings are documented Selection of instrumentations for the hazardous area and Prepares necessary documents for the completion of work.

Employment Record:

December 2017 To 2019

Company: LLC

Position: Electrical Construction Manager

Project: Al Fawaz Hotel

Compliance with building and safety codes, Schedule and budget time required to meet deadlines, determine Labour requirements to construction sites. Inspect review and other regulations.

Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors. October 2016 To 2017

Company: Louis Berger

Position: Electrical Engineer

Project: Saudi Industrial Property Authority (MODON). Duration of the contract, Twenty Five Months, Developed on an area of more than 250,000 m2 and the value is 50 Million SR

The project comprises the construction of infrastructure & utility for Yanbu Oasis City and includes earthworks and grading, storm water pipes network and detention ponds, sewerage network, potable/fire and irrigation networks, MV cabling and street lighting, telecommunication network, potable water and irrigation networks, pumping stations, reservoirs and ancillary equipment.

Total power load is 57 MW; storm water pipe reinforced concrete ASTMC 76 up to Ø1600mm; potable water network pipe PN10uPVC Up to Ø250mm; sewerage force main pipe HDPE up to 100mm; irrigation PN10uPVC pipe up to Ø160mm. My Job Duties

Carrying out all the infrastructure electrical engineering activities with the required quality, budget and time schedule to ensure that the client requirements have been met. Preparing, supervising the development of Project Execution Plan (PEP) Ensuring all engineering submissions meet the quality requirements of the Client. Developing recommendations for very complex designs processes and design changes to meet Client's requirements.

Maintaining/validating the adopted electric systems specifications and to perform regular review to ensure its integrity and suitability of the specified systems for project. Define clear roles & responsibilities and deliverable requirements in terms of both scope and schedule to all the team members.

Implementing of the scope of work as related to construction Manage and oversee the day-to-day construction management of the project Bedwi Mohamed Daoud

Page 5

Plan and developing organize the construction effort to formulate the most cost-effective plan to timely completion within budget and to implement the execution of that plan. Load out, installation the facilities in conformance with project specifications and Scope of Work in accordance with the approved Project Schedule. Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance.

Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions.

Communicated with customers regarding change orders and how they affected the projects, and redistributed manpower accordingly keep projects within established deadlines. Project Close-out.

June 2013 - 2016

Company: Mouchel

Position: Electrical Engineer

Project: Ministry of Transportation (MOT)

Duration of the contract, Thirty Six Months, Design and supervision street lighting roads in Riyadh Jazan, Hafar Al-Batin for more than 150 Km; value of 20 Million SR My Job Duties:

Coordination’s with the all competent authorities Saudi Electricity Company (SEC), Ministry of Transportation (MOT), National Water Company (NWC), Saline Water Conversion Corporation (SWCC), Municipalities, Aramco, Metro, Telecom Companies & Others. Advised contractors on all electrical equipment’s specifications related to Projects, namely Substations and other electrical equipment, have knowledge on safety measures regarding, electrical equipment installation, power grid lines and other electrical equipment’s. Design and review the design of street lighting systems within budgetary constraints. Review, supervise and participate in the preparation of contract plans and specifications. Supervise engineering personnel and skilled and semi-skilled street lighting employees. Analysed problems and to logically arrive at solutions present ideas effectively in oral or written.

November 2009 – February 2013

Company: Drake & Scull International

Position: Senior Electrical Engineer

Project: King Khalid University Hospital.

Public Pension Agency “Information Technology &

Communication Complex” ITCC

Atturaif Project, Visitor Canter & Bridge.

Princess Nora Bint Abdurrahman University. (PNU)

The project for developed on an area of more than 800,000 m2 for Information Technology Communications Complex (ITCC).

District cooling project was a major development from the Operations and Maintenance Perspective.

The initial plans called for creation of a District cooling system with a capacity of 25,000 TR capacities, which as designed to be expandable to 30,000 TR to cope with increased demands for cooling with more residents moving into the premises. Bedwi Mohamed Daoud

Page 6

Drake & Scull Water and Power also undertook the construction and installation of the two Thermal Energy Storage tanks (TES) works with 40,000 TRH capacities with max flow for each tank is 471 l/s.

Project content cooling tower make up water pump; chilled water pressurization booster pump; side stream filter pump with water supply pipe up to Ø 1300mm; also there are two fire potable water tank dimension 13x11x -6 meter with domestic capacity = 381.3 m for each and two water tank dimension 20x20x-7.5

The complete construction includes aspects of civil, process and MEP services. I was present in a close way the work of erection and installation of HYOSUNG; Power Transformer 132/13.8kv 60MVA and SF6 Gas-Insulated-Switchgear (GIS) system with Al- Othman Consultants company, and Al-Babtain Contracting company; the total power load for project District cooling is 22MW.

Duties and responsibilities:

Attend project kick-off meeting

Holding regular meetings to ensure that everything is going according to time and budget restrictions.

Committed to health & safety HSE requirements and all applicable legislation and contractual requirements affecting the HSE activities at project site and administrative offices.

Handle all electrical issues.

Design Review (DR)

Co-ordination and integration of different elements or packages of the design. Prepare shop drawing, materials submittals and get approval. Prepare Request for Inspection (RFI), Technical Inquiry (TQ) or Site Certification Request

(SCR).

Preparation for proposal drawings and mock-up for approval. Making sure that every electrical device or circuit installed meets the Codes and standards.

& this is important due to the liability issues that can be caused by improper installation & this can be a challenging task.

Write reports and giving presentations to managers and clients. Offers advice in the planning, co-ordination and supervision of technical aspects of construction.

Solving technical issues, providing advice, management and preparing reports. Testing, maintenance & Final Inspection.

Preparation, Planning, Pre-Commissioning, attend & witness checks and tests, for Transformers, Switchgear, Induction and Synchronous Motors, Generators & Instrumentation, Trial Run of each Equipment, Safety and Precautions, safety rules clearance certificates, procedure for the control and Handling of Defects and commissioning reports

Bedwi Mohamed Daoud

Page 7

Code & Standard:

Saudi Arabian Standard Organization SASO

Canadian Standards Association CSA

National Electrical Code NEC

International Electro technical Commission IEC

National Electrical Manufacturers Association

NEMA : National Electrical Manufacturers Association British Standards Institution BS

Institute of Electrical and Electronic Engineers IEEE December 2008 – August 2009

Company: Mouchel

Position: Electrical Engineer

Project: Limitless Infrastructure & Utilities Consultancy Services. Al Wasl Project include more than 60,000 homes (a mixture of villas, townhouses and apartments); over 300 hectares of green, open space; one million square metres of office space; three large mosques, each accommodating up to 2,000 people; more than 2,000 hotel rooms; seven shopping centres, including a world class mall, with a total of 270,000 square metres of retail facilities; schools and a university; a hospital; a sports stadium; easy access to King Khaled International Airport (15 minutes by car); and an internal transit system providing convenient links to and from areas within the development. Duties and responsibilities:

Infrastructure & Utilities Consultancy Services for electrical infrastructure services. Prepare "BOQ" Bill of Quintets for electrical distribution network, design medium & low "MV

& LV” voltage electrical distribution system drawings, Sewage Treatment Plant (STP), Pump Room & deep wells Pumps.

Prepare Technical specification for 13.8kv, Cable layout for High Voltage (HV) Overhead Lines Relocation.

Code & standard:

SAUDIELECTRICITYCOMPANY.(SEC)“SDMS“SECDISTRIBUTION MATERIALS,SPECIFICATION.“TMSS“SECTRANSMISSIONMATERIALSTANDARD SPECIFICATION. SDCS “SEC DISTRIBUTION CONSTRUCTION STANDARD. September 2006 – October 2008

Company: Zuhair Fayez & Partners

Position: Electrical Engineer

Project: Ministry of Health & Others Private Buildings Duties and responsibilities

Assist in monitoring and reporting on the progress of all services site activities within the construction program, including any new design conditions which may affect the overall project cost and schedule.

Inspect all materials and equipment supplied by contractors. Follow up project progress and schedule to ensure that activity and progress accomplishment meet project time lines.

Bedwi Mohamed Daoud

Page 8

Working cooperatively and effectively with a wide variety of interests/authorities Involved in all aspects of projects, electrical engineering utilities, applications, Infrastructures applications.

Assure that the electrical requirements of Engineering Department clients and external business associates are satisfactorily met.

Advised contractors on all electrical equipment’s specifications related to Projects, namely Substations and other electrical equipment, have knowledge on safety measures regarding, electrical equipment installation, power grid lines and other electrical equipment’s. October 2004– August 2006 “Saudi Arabia”

Company, House of Measurement

Electrical Engineer

Project: Miscellaneous

Duties and responsibilities

Automation, Control Panel Switching, Motor Control Centres (MCC) variable frequency drive(VFD),Soft Starters (SS),Lift Station, Wastewater Treatment Plant (WWTP), prepare shop drawings, materials submittal, respond to comments if any, installation cabling wiring grounding, lighting, internal/external, parking, lightning arresters, low current installations, motors, pumps, commissioning & testing and prepare as built drawing.



Contact this candidate