CV OIL& GAS PLANT SUPERINTENDENT or CONSTRUCTION MANAGER (E&I) ROTATION JOB 28/28=ON/OFF

CANDIDATE NAME

RADHAKRISHNAN.K.T (R.K.NAIR)

EDUCATINAL QUALIFICATIONS

Educational S.S.L.C.Board of Examination, Kerala Govt.

Technical I.T.I. (Electrical Engineering)N.C.V.T, India Govt.1980to1982

Technical Diploma in Electrical Engineering Ninans Polytechnic,Kottayam Kerala,1982to1985

CERTIFICATE DETAILS

BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING BY SURAKSHA MARINE

OPITO CERTIFICATE NO; 64765700221117611 EXPIRED ON 21-11-2021. . Sea survival HSE Personal Passport: Issued by Gulf Technical & Safety

Training Centre, UAE

C D C Passport Technical : Issued by the Govt. of Panama.

Electrical Engineers License : Issued by Govt. of Kerala.

Driving License : C/4016-85 Issued by Govt. of Kerala

INDIA .

PTW ADCO : JOB PERFORMER

PTW GASCO : ORIGINATOR/ACCP/PICWS/2019

PERSONAL PROFILE

NATIONALITY : INDIAN

DATE OF BIRTH : 13/05/1964

MARITAL STATUS : MARRIED

RELIGION : HINDU

LANGUAGES KNOWN: ENGLISH, HINDI, ARABIC, MALAYALAM & TAMIL

RESENT ADDRESS : ANJANAM,KAPOTHEKAVE ROAD,ANJAMPEEDIKA

POST, MOTTAMMAL VIA,KANNUR DIST,KERALA - STATE,INDIA, PIN 670331. Ph;+918*********

Mail id : adannw@r.postjobfree.com

adannw@r.postjobfree.com

PASSPORT DETAILS

PASSPORT NUMBER : K .8442572

DATE OF ISSUE : 11/11/2012

DATE OF EXPIRY: 10/11/2022

PLACE OF ISSUE : Abu Dhabi, UAE

https://ae.linkedin.com/in/radhakrishnan-k-t-0402b496

Skype Id : radhakrishnan1437

CAREER SUMMARY

An accomplished operations Project Execution Management with wide experience in all project Execution Phases within Operational Completion and Operational Warranties of Oil & Gas Onshore and Offshore Process Facilities include Upstream and Downstream LNG, Petrochemicals Plants and Marine Terminals. Worked as a Senior Electrical & Instrumentation Engineer In a Spanish company with High Standard accredited with ISO 9001:2000 and Quality Electrical & Instrumentation Contractor have wide experience in Design, Engineering, Procurement, Supply, Installation, Commissioning, and Maintenance Services for Instrumentation, Control Systems, Electrical field &IT Projects in the Gulf regions for major oil and gas industries like ADCO, ADNOC, ADMA-OPCO,

ZADCO, ADGAS, TECHNIP, CHIYODA, TOTAL, SHELL,NSQ IRAN, ONGC, NEB, GASCO, TAKREER,PETROFAC, SAUDI ARAMCO/ SAIPEM etc.

Language Handling – English, Hindi, Malayalam, Tamil, basic Arabic

Company

Saipem Saudi Aramco Project

ARBI 20_23 &TP 1,TP 6 Gas well Head Platforms

Arabiya Oil field

Zuluf,Karan,

Dammam Base- Saudi Arabiya

Experience

21-1-2018 TO 19/12/2018

Projects

Arabiya Oil field

Position

E&I SUPERINTENDENT

KEY SKILLS:

I worked in Saipem co as a E& I superintendent and handling well head pneumatic pressure line,Catholic cables and panel irection,Battery UPS panel fixing, Temporary power supply to Transformer, transformer oil tank oil filling and commissioning,navigation light fixing, CCTC camera,

And patch panel connection, well head instruments installing, Cable pulling for Transformers and switch gear room and control room,varies instruments fixing, Crain Beacons,Speakers,and panel connections, power & instruments cable try fixing & cable laying, All panel and instruments body grounding, in ARBI 20-23 WELL HEAD PLATFORMS. AND IN ZULUF PI Platform M O V fixing and cable laying and connections, fixed H2S detectors, panel board for MOV,

Company

GCMC Project Petrofac- Iraq; CLIENT B.P

Offshore Project & Operations (OPO);

Petrofac Base, North Rumaila Field;

Basrah, Iraq.

Experience

4TH April 2017 to 20/12/2017

Projects

GCMC Project, Rumalia Operating Organisation-Basra-Iraq

Position

E&I Manager

31 years’ experience ( 27 onshore& offshore & 4 years near shore shallow waters; 20 years management experience) in all practices of the Project execution.

Project Execution management operations of Brownfield’s Conceptual Design and Governmental Approval (include TEOC in India), Development of the Contract Strategies, Project Front loading such as Basic of Design (BOD) and Front End Engineering Design (FEED), Tender and Bid evaluation (T&B), Detailed Engineering Design (DED) On- and Offshore up- & downstream facilities. Construction management, with hands-on experience in Commissioning and Start-up management and close out projects with Final Operational Warranty.

Project Execution Management operations of off shore &on shore project of multidiscipline scope.

Offshore Island Train iii extension facilities 350K BOPD, SURF (Subsea, Umbilical, Risers, Flow lines), Satellites & Well Head Platforms slot extension, hook-up pre- and commissioning, power upgrade, process control and DCS / ESD modification, Well Head sites include WHCU and Injection control, On Shore Process Facilities (OPF), Storage and Tank Farms facilities, Loading Marine Terminals (LNG & petrochemicals), Tankers mooring systems, Offshore Platforms topsides design and construction, risers and umbilical design and installation, landfall technical interfaces, and Pipe Lines Compression Buster Stations, HIPPS, PIG Stations, Custody Transfer Metering, Underground Gas Storage, Refineries and LNG, Tie-in and Infrastructure Site Utilities projects;

Project Engineering expertise of multidiscipline and multi-location scope from accepts or reject gate proposal for execution (Selection Phase), Final Investment Decision (FID) gate, up to Operations Handover and project close out. Practically trained Project Management mastering Shell EP OPMG EP.64. Settling up the Change order Procedure and approval of change orders on an order within contract. Approval of Invoices, approval of assigned project stuff, approval of HSE documents like HEMP (Hazard & Effect Management Process) studies and close-out action points. Project Risks analyses and monitoring TECOP (Technical, Economical, Commercial, Organizational, and Political) project execution risks, PCM (Project Change Management) execution of the assigned projects within Chain Supply – identification and recording of change, evaluation, screening, proceed, facilitating of approval by PCRB/DCRB, tracking of implementation and closing out;

Project Execution Management (single responsible and collegial decision made) of the project with total amount from US $ 100 million up to 1.5 billion (collegial board decision made);

Project Execution Management Indirect Managing 30,000 mhd (man hours day) multidiscipline projects field manpower and Direct Managing of 20 Company Engineers and 5 Company Construction Coordinators, 5 EPCM Project Managers, 10 EPCM (sr.) Project Engineers, 8 EPCM Commissioning Managers. Offshore Heavy Lift Superintendence and supervision including SIMOPS approval and coordination, within exclusion zone of offshore installation (Shell,Adma- Opco,Adgas, Gasco, Thakreer, internal training) for LNG and Desalination Power project& K1 Yas Merina Circuits in Yas Island

Managing and responsible for HSE matters for assigned project, major HSE focal point in project home office and on site Area Responsible PTW, PIC PTW– licensed International Safety Operations Supervisor by Numero Uno Training and Consulting and Emirates Technical & safety Development Centre.

Leading Risk Assessment workshops PSRRMP(Chevron), TECOP(Shell), JSA;

Excellent ability to liaise with Governmental Approval Institution;

Estimating Project scope in budget and scheduling, review and approve project appraisal Gate 3 estimates of the previous decision gates, guarding Projects Budget on behave of project operator (Company);

Managing achievements and Define of the assigned project milestones, monitoring on project execution scheduling Level 3 and Level 4;

QA/QC objectives expertise, liaison with PAP (Project Assurance Plan) holder submission, detection of ownership and managing authorization by DRB & TA of CPN (Change Proposal Notice), managing NCR (Non Conformity Report); ;

Review and Approval of Financial Reports of EPC and PMC Contractors, Approval Company Pay-off(s) of the assigned projects;

Role Representative (sr.) Project Management ob behave of Operator (Company) in establishing of Project Execution Management Contracting (PMC), EPC (Engineering, Procurement, Construction);

Specify Definition of Engineering Approval Procedures and Project Execution Monitoring;

Specify Definition and Monitoring of the project execution QA/QC matters;

Project Assurance, Mastering ORP Opportunity Realization Process from Gate 3 to Gate 5;

Define and Managing of Submission and Implementation of the all Project Deliverables - Functional and Technical Specifications, leading of Technical and Financial Audit;

Facilitate of the Engineering tools such as Value Engineering workshops, Feasibility, HSE, HAZID, HAZOP, IPF (included SIL definitions and calculation) for the New Projects such as LNG and Underground Gas storage, Marine Loading Terminals and Green-in-Brown fields Tie-In modification projects,

Expertise to being working in a multidiscipline and multination environment and able to work with people at levels within the organization;

Managing of the Technical Review and Technical Audits and Tests (FAT, FIT, SAT, SIT) Project Specification (PS), Basics of Design (BOD), TEOC, Front Engineering End Design (FEED), Detail Design and EPC project phases on the project’s total amount up to $10 milliards ;Define, Develop, Review, Optimise and Liaise of the project deliverables during FEED, Request for Quotation (RFQ), Tendering; EPC Contracting and Main Automation Contracting; Managing Project Execution during Tie-in and modification Green-in-Brown field process facilities packages for downstream Refineries, LNG within LNG loading and unloading (reversing process and degasification), implementation Integrated Control and Safety System (ICSS), liaison and multidiscipline interfacing engineering;

Develop, review and evaluate of Project Execution and Test & Inspection Plans, Bid Proposals, Scope of Work, Project Execution Estimating, Project Scheduling and Monitoring comprise project Budget;

Low Voltage Expert Onshore- and/Off Offshore Emirates Certificate EN 50110 (NEN-3140; NEN 50110 1&2; ISSOW certificate Permit to Work (PTW) holder. Expertise International, European, National norms and standards (IEC 61508 and IEC 61511; GOST, PBs and SNIPs etc.) and Authorities approval procedures, Licensed HSE supervisor;

A one has been skilled problem solver with excellent organization and communication skills.

KEY SKILLS:

Experienced user of following computer programs and systems:

•Microsoft Office Pro 2003/XP (Win2000; XP), MS Visio, MS Project, SAP system, Publisher's & HTML's and databases, IN Tools& SQLs, CAD; IEC 61508 and IEC 61511; ISO 9000, 9001,9002 Russian GOST, SNIP etc.; Metric Units System expert.

EMPLOYMENT EXPERIENCE

Company

EMIRATE TECHNICAL ASSOCIATES LLC ABUDHABI,UNITED ARAB EMIRATES,

Experience

7/12/2015_17/7/2016

Projects

POWER PROJECT DIVISION ASAB GASCO POWER GENERATION UNITS RETAIRMENT PROJECT

Position

SENIOR ELECTRICAL ELECTRONICS INSTRUMENTATION ENGINEER

Activities

Managing Hook-up and Commissioning Activities in Gasco 0- S/S 0-Modification of MIMICS Panel and replacement in Gasco 0 -Control room (Shut Down Time) and coordinating the Energen Panel re arrangement.

Blueprint and settling down organisation, deployment plan, include mobilisation camp and offshore marine spread and define management interfaces with Project Control, Chain Supply, and Procurement, HSE, Fabrication and Yard Management, Marine Logistic Department;

Selection of Recourses expatriates and local content, define Roles and Responsibilities (R&R), interview and approval;

Qualification of resources – Contractors and Subcontractors, Chartering Marine spread;

Tender – managing of selection qualified and new one contractors, vendors, managing Technical Bid Evaluation (TBE) and Commercial Bid Evaluation (CBE) liaison with tender board;

Project Planning review Level 3and approval Level 4/5, review and approval reporting ;

Managing preparation of Work Packs multidiscipline;

Managing of Certification by 3rd party Gasco.

Single Point responsibilities of Safety – Review and approval of Project Safety Risk Assessment, Job Safety Analyses (JSA) General and PTW, Area Responsible Person & PIC, review and approval of LOTO system, offshore SIMOPS and marine coordination inside exclusion zone of installation, review and approval Emergency Plan and POB;

Commissioning multidiscipline offshore review and approval of procedures, completion, preservation and handover with operational warranties;

Coordination of weekly and daily meetings kick-off, clarification within on site, progress and closeout walk downs;

Problem shutter for project delayed 1,5 year with liaisons to eliminate LD back charge.

Built Up new S/S-0 in Gasco Asab Transformer irrection and Laying HT cables,LV cables,Instrumentation cables, Panel Board irrection.

Company

CONTROL APPLICATIONS EMIRATES ABUDHABI,UAE.

Experience

7.1.2009-17.6.2015

Projects

Yas Island Marina Circuit, Desalination and Power Project,NGL 4,Gasco-Ruwais, Sewage Treatment Project,Al Ain,Asab Gasco Building Project, Asab Gasco CNIA CAMARA Project,Das Island Fire &Gas Project.Sulpher Project Gasco Ruwais,Amonia Plant.

Position

Senior E&I Engineer

. Activities

Managing Offshore Projects Portfolio Execution Upper Zakum Oil field (16 projects simultaneously) budgets total value +/- 1bln USD.

Direct managing and coordination of 65 Senior professionals such as Construction Manager, Engineering Manager, PMs, PE, Discipline Engineers, Project Control & Services. Responsible for development of team and organisation, interview and approve the candidates.

Reporting to Stakeholders ADNOC ADMA-OPCO, ExxonMobil, JODCO and TB (Tender Board), Decision Board of the Stakeholders, VP ( Vice President) And SVP (Senior Vice President) of the Company. Gate Keeper liaison and managing preparation of the Decision Supporting Package for to proceed, utilise or reject project e.g. GO / NOT to GO and FID (Final Investment Decision).

Managing project execution in line with Company VAP (Value Assurance Process) from Gate 3 till Gate 5 DEFINITION and EXECUTION Stages.

Day to day managing performance of the project execution to meet Master Plan on Tender- prequalification bidders, Technical Bid Evaluation, Commercial Bid Evaluation, EPC award; and EPC stages – from Kick-off till Operation Completion. Coordination of Engineering Manager and Construction Manager and Project Control Manager of the assigned projects portfolio.

Preparing and managing of Recourses Deployment plan, Projects Portfolio Plan within all dedicate Risks Analyses (TECOP).

Developing and Settling up the organisation of the Projects Portfolio Execution, explore justification/s for project/s execution time line.

Preparing projects execution strategy for multi-projects on multi-locations Upstream Brownfield offshore & onshore.

Managing execution of the projects portfolio Management Interfaces & Technical Interfaces for Operational Hydrocarbon Upstream On- and Offshore facilities Upper Zakum Oil fields for assigned projects portfolio (16 projects): SURF, Top Sides Process Facilities, WHPTs, Satellites, OPF (Onshore process Facilities), Infrastructure, IPS (Instrumented Protective Systems).

Identify Shut Down requirements & coordinate preparation Shut Down, Tie-In plans either scenarios.

Coordinate EPCs on behave of Company (Client) identify projects portfolio execution bottlenecking and coordinate project execution on the critical path. Review and approval of Projects Interfaces matrix Brown fields to Greenfields.

Preparing and/or managing of preparation and submission of the PEP (Project Execution Plan), Project Execution Procedures, Project Execution Instruction and PQP/PAP (Portfolio Quality Plan / Portfolio Assurance Plan).

Responsible for assigned Portfolio Projects Delivery Milestones to meet Company master plan within EPC Contractors progress and budgets watch-dog.

Responsible for HSE performance and reporting for all levels of the assigned portfolio include SIMOPS, .

Responsible for bi-directional communication within company departments and interfaced with EPCs.

SPA (Single Point Accountability) for certification “Fit for Purposes” for FEED packages, ITT packages, AFC (Approved for Construction), RFC (Ready for Commissioning), PAC (Provisional Acceptance Certificate), FAC (Final Acceptance Certificate) and Projects Closing Out.

Identify issues, problems, conflicts and propose solutions, whether issuing project/s justification plans to eliminate any risks ALARP based.

Construction of Yas Island Marina Circuits K Race Track .Electrical & Instrumentation work

Al Ain Sewage Treatment Project varies valves and instruments fixed

EDSS system Up gradation in ADCO Al Dhabbiyya and Rumitha field Central power plant

Rhuwais Expansion Project Non Process Building (EPC-6) THAKREER –ED-SUBLIN AG

Cable Laying JB fixing, Glanding & Termination for PAGA Fire Alarm System related work.

Gasco Asab C-3231 Fencing Project CNIA Camera Project CNIA CAMERA Shelter with Panel Board Erection, Cable laying, Camera pole erection, Lighting pole erection, Glanding & Termination of panel boards in GASCO-0, 1 & 2, ADCO Police station, ADCO Switch gear room, OFC cable pulling in ADCO. Peripheral Fence to GASCO. GASCO-0 to PETROFAC Gate. (Lean GAS Station midpoint & Booster Station)

Duration : Jan 2012 - Feb 2014 GASCO- NGL4 RUWAIS

Client : GASCO

Location : Rhuwais, Abu dhabi

Position : Electrical &Instrumentation Supervisor

Job : Monitor cable laying, Cable testing, Cable glanding and Termination, Erection of panel boards, Fixing all kind of instruments for control valves, Fixing all kind of fire and gas detection system, Testing and commissioning of all kind of instrument system, Erection of all kind of electrical and instrument equipment

Project Execution Management Consultant –Abu Dhabi ISTP 2 (Waste Water Treatment Project,Sulphur and CO2 Project. Amonia Plant for ARU Generation

Electrical &Instrumentation Engineer

Execute of the External audit consultancy for Project Execution Management settling up the project in line of Opportunity Process Realisation (ORP) Gate 2 & 3 in offshore shelf of arctic zone of Russian Federation. Review project management work instruction for Feasibility of Assess, Field Development Plan and pre FID. On single orders preparation of recommendations for DE (Decision Executive) / DRB (Decision Review Board).

Client : JV-OTV

Location : Al Ain, Abu Dhabi

Job : Monitor cable laying, Cable testing, Cable glanding and Termination, Erection of panel boards, Fixing all kind of instruments for control valves, Fixing all kind of fire and gas detection system, Testing and commissioning of all kind of instrument system, Erection of all kind of electrical and instrument equipment

Fujairah F2 -2000MW Power & Sea Water Desalination Plant-Alstrom/ Sidom

Electrical & Instrumentation Engineer,CO2 and Suphur plant,Amonia Plant .

Client : JV-OTV-SA FAPCO (FUJAIRAH ASIA POWER CORPORATION) ALSTOM, SIDEM

Location : Fujairah

Job : As a Supervisor scope of work, prepare MTO, Planning and execution, Installation & HVAC Testing and Commission of 11KV/415V,3500KVA Transformer, 11KV MV Switch Gear Panel, LV Switch Gear Panel, Flow transmitters, level transmitters Analyzer panels etc. Co-ordination between site manager and clients. Arranging work force and equipment for the project and monitoring daily progress.

Strong knowledge of the Refinery Operation

Strong knowledge of production system and operation

Ability to continuously drive for process improvement

Superior grasp of Instrumentation and chemical Engineering processes, Principles and development technologies.

Sulphur Recovery unit(SRU), Operating DCS from the safety point of view

Continuously monitored operation process parameters of SRU unit

Done Interlock(logic) checking of SULPHUR BLOCK in the DCS panel

Done controller action Test checking of SRU,ARU,SWS Unit

Having very good knowledge of handling and Operating DCS

Coordinate the start-up,shutdown and Operation (normal & Emergency ) with lead operator and field operator from DCS

Having good knowledge about process controller( feed forward, feedback, cascade, split range)

Set controls to adjust process variable,such as flow Temperature and pressure

Responsible for recording,reporting and documenting operating data and monitoring

Process indicator

Done control valve stock checking &Done MOV checking in the DCS . Commissioning and Energising activities Ensures all personnel adhere to a high standard of Safety under the Work to permit system and is responsible for all jobs on the Plant (Cold, Hot).

Conducts of Tool Box Talks on daily basis for jobs on the Plant.\Working in Reside Project as Electrical, Instrumentation,Chemical Engineering (Process/Operations) & preparing Procedures, Scheduling Pre-Commissioning & Commissioning Activities, Organizing requirements for Commissioning, preparing Check lists & uploading it Project Completion System

Preparing Activity risk Assessments( ARA),Method Statements(M S ) for sire jobs .

Having very good knowledge of Reading and Reviewing P&ID & PFD

Field Execution of Pre-commissioning Activities such as Water Flushing, Air Blowing, Drying, Steam Blowing, Card-board Blasting, Leak Test, Purging (Inert), Pigging (in Pipelines)

Checking the field equipment with P&ID preparation of line

Purging all hydrocarbon line with N2(winterization ) and reducing O2 content up to 0.2%

Supervise the witnessing activities of staff within the assigned Unit.

Having very good knowledge mechanical Seal plan 11 /52/53A/53B

Checking and completing format states(system)

Carry out the punch listing activities.

Preparing work plans for the day to day activities.

Completion of activities within the time frame

Coordination with mechanical Electrical and instrument for trouble shooting free commissioning

Maintains records and prepares reports Executing Mechanical Run Test (MRT) for Rotary Equipments (Pumps, Compressors, Blowers, Fans, cooling coils, condenser) and Monitoring & Logging of Equipment Performance Parameters (Vibration, Temperature, RPM, Current, Flow. Two Sulphur Recovery trains(Claus-type)one tail gas treating unit (TGTU) one Sulphur degassing block one thermal incineration block Having very good Process Technical knowledge of each step of SRU(TGTU),ARU,SWS .

Reading and review of P&ID and PFD of SRU (TGTU),ARU,SWS.

Operating SRU block unit with safety point of view

Done box up and internal inspection of thermal Reactor and Incinerator

Having good knowledge of burner operation (during fuel and acid gas cut-in)

Done Dry out of thermal reactor based on temperature graph

Having Experience in inspection of thermal reactor after dry out(Refractory check) Done inter-lock checking and light-up of Incinerator

Done Amine unloading into ARU sump and make it into 40%(conc.)by adding DM then transfer it into lean amine storage tank

Done Amine Degreasing in the ARU unit

Inspection of Charcoal filter and filling charcoal into filter drum

Having very good knowledge in PRDS Pressure reducing valves & de sulphur heating system

Checking boiler feed water(quality) and consumption of steam

Review the availability of the hydrocarbon commodities for the initial start-up

Interface management coordination project directorate level of the 1.5 mlrd Petrochemical Process Facilities Detailed Design, Construction and preparation of the Operational Completion Warranties.

The primary responsibility to support the Company on the interfaces with Authority requirements within the project scope in a time line to meet major milestones defined by project shareholders;

Identify approval procedure, ensure that EPCM has clearly identify all Governmental and TA (Technical Authorities) requirements in multidiscipline scope and their translation into scope of work and design instructions for EPCM; Supervise and play an active role of moderator in the application of the Governmental project statements on the contracts, scope of work, design instructions and project procedures; Coordination within the Company Project team on all Authority issues; Management and coordination of project operator (Company) and EPCM on all authorisation issues include Project Change Management; Liaising with Governmental Authorities as required in full coordination with project Directorate Board Decision Council; Review and Approval of the Project EPCM to provide expertise on authorisation requirements, or to compile required deliverables during all phases of the project; Provides input to the schedule, and to the project budget;

Yas Island F1 - K Race Track Project

Electrical & Instrumentation Engineer

Project activities

Tray and Trunking, Cable Lying, DB Fixing, Glanding and Termination. GI Conducting and Fire Alarm cable wiring, Power Outlet Box Fixing and wiring. Light Fitting smoke detector, Gas Detector sounder and Heat Detector

Project Management of HSSE matter during Shipyard construction HU&C of the Topsides platform till rope-out to location. Position has been assigned by BP VALHALL topsides construction management for safety coordination on site of Herema BV shipyard. Daily managing 8 Field Safety officers and liaison safety issues with 10 field work contractors. Coordination of the work execution more than 1000 men worked shifts on site and setting up the PTW (Permit to Work) system for managing of safely construction field work execution. Coordinate swiftly execution of PTW system and reporting to the Company safety related issues and interfaces SIMOPS complications between Commissioning and Construction activities on site. Management from day to day the Look-Out and Isolation process for multidiscipline on interfaces between Commissioning, Construction, and Functional Equipment Testing.

Company

NPCC (National Petroleum construction Company).Mussafah, Abudhabi, U A E.

Experience

12.4..2002-17.11.2008

Projects

OGD III, AL DHABBIYYA CPP,ONGC PLATFORM,IRAN SPP2.

Position

Project Electrical & Instrumentation Engineer

project

documents in accordance with the EPE EP064 process and the EPCM Contract Manual, department to the ONGC – 6040 (PLATFORM & Helipad)

Client : Oil and Natural Gas Corporation

Location : Abu Dhabi, UAE

Job : panel Board, Solar System and UPS Battery Installation. Internal Wiring, Loop checking, Glanding and Termination, Cable Pulling, Hook up work, Fitting and Tubing all Electrical and Instruments Installation. Cable Megger Testing and Testing and commissioning.

UPS Panel irrection & commissioning

The Position has been delegated by Shell International Upstream as the Company

Representative person for Project Management execution of the appointed projects.

Brownfield projects – simultaneously 5 (five) projects execution management

Responsible for Projects Execution (Green in Brownfield) for aspects such as HSE, budget, discipline engineering input, procurement, construction, commissioning, start-up and final operational warranty. Single point responsibilities for the daily management of the assigned projects from Basic of Design till Project Close-out;

Managing Projects via and together with the been assigned EPCM Project Manager in their organization;

Responsible for Definition of Project execution strategies and development contracting out strategies;

Managing Company interfaces to the project with operations (production & maintenance), Land & Lease,

Appraisal engineering, discipline engineers and other Company departments;

Managing external interfaces with respect to the project such as local authorities;

Prepare

Project Execution Plans (PEP), Order Execution Instructions (OEI) for Contractor;

Managing the preparation of EPC(M) Contractor project deliverables; Ensure that facilities are designed and specified such that they will be manufactured, tested and constructed in such a manner that assures their safety, design integrity, reliability and operability with due respect for life cycle cost considerations and in line with the TA framework;

Monitor and control project budgets, provide input to EPE budget and schedule revisions;

Monitor the overall performance of the EPC(M) Contractor as per agreed reporting, against agreed indicators, on the individual projects;

Managing project change control and variance control on projects – PCM (Project Change Management) include Chain Supply 2nd and 3rd level contracting ; Identify, prevent and/or

Reporting to Company Contract Management team and Issuing of TOR’s (Terms of Reference) eliminate potential or actual quality problems; Inventory and preparation of required legal permits for the projects and further submission by the Company Land & Lease dedicated Authorities;for HEMP studies.

Approval of OEI’s and EPC(M)contractor’s PP (Project Plan) for scope content, project management, cost, BSC

Approval of DCN’s (Design Change Notice) on an Order within the EPC(M) Contract;

Approval of EPC(M) Contractor’s Contract deliverables like monthly reports and Project Close-out Report;

Approval of HSE documents EPC(M) Contractor and Company Operations like: ToR HEMP Studies, HEMP studies, VGM document, Work Safety Plan or CO scripts.

Approval of closeout of HEMP action points;

Approval of EPC Contractor material purchases as per Contract Manual;

Approval of permit submissions like Pre-Design Report, building permit, environmental permit and others.

Accountabilities fields to complete the project within the HSE targets of EPE, to execute Projects in accordance with the defined strategies, to complete the project within the agreed planning and budget, full compliance with the EPE Common Management System (CMS); Execute the Project in line with the EPC Contractor Contract Manual;