Resume

Sign in

Electrical Engineer Engineering

Location:
Rawdat Al Khail, Qatar
Posted:
October 15, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

Page */*

PERSONAL DETAILS :

Name : Ahmed Abd Elrahman Mahmoud Hamdy Aly Zidan

Position : Electrical Engineer

Nationality : Egyptian

Date of Birth : 27 Mar, 1977

Telephone (Mobile): (009**-********, 74016556

Email address : adalgc@r.postjobfree.com, adalgc@r.postjobfree.com, KEY QUALIFICATIONS :

) Since 20 November 2017 as QA/QC Electric Engineer at Stream Industrial and Engineering MEP Contractor Company.

) Since 1 February 2014 as an Electrical Site Engineer in Construction Field at CEG Consultant Company.

) 5 years’ experience in designing, manufacturing and installation of Control Panels and electric equipment’s associated with Industrial Gas Burning Systems. EDUCATION AND PROFESSIONAL QUALIFICATIONS:

2006 – 2010: M.Sc. in Scientific Instrumentation, Department of Science and Technology (SciTec), University of Applied Sciences Jena. Jena, Germany.

2000-2006: Premaster courses in partial fulfillment of Master of Science in

“Electrical Power and Machines “, Cairo University. Giza, Egypt.

1995 – 2000: B.Sc. in Electrical and Control Engineering, College of Engineering

& Technology. Arab Academy for Science and Technology and Maritime Transport Alexandria, Egypt.

AFFILIATES AND KEY TRAININGS :

Quality Management System (QMS) Auditing Program in Chicago Training Center (April 20, 2018-May 11, 2018) Doha-Qatar.

Checking the control panels, circuit breakers (SF6), disconnectors at the Asea Brown Boveri (ABB) High voltage company, Cairo-Egypt.

Programmable Logic Controller (PLC, SIEMENS STEP 7) course in SALESIAN INSTITUTE, Cairo-Egypt.

“PLC, Advanced PLC, Electrical Measurements and Director MX” courses at the Arabic Institute for Advanced Technology (AIAT) Center, Cairo-Egypt. LANGUAGE SKILLS :

Arabic – Mother Tongue

English – Very Good

German – Fair

COMPUTER SKILLS :

International Computer Driving License (ICDL) including MS word, excel, power point, Internet.

Information Technology Training Program Super User Project (300 Hours) in the CURRICULUM VITAE

Page 2/3

track of: Hardware and Operating system maintenance. CompTIA A+ Certified Professional.

AutoCAD 2005 (YAT Education Center) software.

Matlab, SnagR, VHDL, C++ programming (basics), Python (basics). TYPES OF PROJECTS :

facilities buildings, industrial Burners systems for Furnaces FIELD OF EXPERIENCE:

2017 to 2018 Stream Industrial and Engineering MEP Contractor Company Period : November 2017 to Present

Position : QA/QC Electric Engineer

Project Title : Msheireb Downtown Doha (Heart of Doha) Phase 1B Project Value :

Project Duration :

Client / End User : Msheireb Properties (MP)

Contractor : Consolidated Contractors Company (CCC) Responsibilities

) Overall Co-ordination of an effective ISO 9001:2008 Quality Management System.

) Prepare the Inspections to be raised to the Consultant and Checking the work done at the site prior to conducting inspections with Consultant.

) Check the installation of electrical equipment’s, devices, SMDBs, DBs, Panels and all the Electrical works done at the site as per as per approved/commented Shop Drawings, Project Specifications, QCS, and KAHRAMAA Regulations

) Carry out Internal and Site Audits and Co- ordination of periodical external audit.

) Preparation of final QA/QC packages related to project.

) Control of non-conformances and Corrective action taken and closing the NCRs.

) Coordination with clients for Shop Drawing approval and any revisions.

) All other activities pertaining to QA/QC department. 2014 to 2017 CEG International - Doha, Qatar (Consultancy) Period : February 2014 to Present

Position : Site Electrical Engineer

Project Title : Ministry Of Interior Headquarters

Project Value : QR. 1,590,750,000.00

Project Duration : 3 Years & 6 Months

Client / End User : Ministry Of Interior

Contractor : WCT Berhad (Qatar Branch)

Responsibilities

Carry-out regular site inspection for electrical works for specification and drawing compliance.

Check the approved material is used for installation.

Check the installation of electrical equipment’s and appliances is as per approved/commented shop drawings.

CURRICULUM VITAE

Page 3/3

Check the latest FCR & RFI.

Check any physical damage internal and/or external of electrical equipment and

/or installation.

Responsible to check and organize the site area and facilities efficiently in order to meet quality workplace.

Check and confirm the quality of workmanship.

Maintains awareness of the project electrical specifications, drawings, design criteria in relation to standard codes and practices.

Assist other electrical engineers for the supervision of electrical aspects of the project.

February 2012

to June 2012

Fraunhofer-Institut for Energy systems “ISE” – Freiburg, Germany Period : February 2012 to June 2012

Position : Researcher assistant

Projects Title : Development of a multi-nozzle dispenser machine Responsibilities

Supporting and performing test executions at the Dispenser machine.

Characterizing test samples using 3D Microscope and incident light Microscope.

Height profile measurements using the Dektak profilometer and supporting Data analysis of Height profile measurements (Matlab, Excel). July 2001 to

September

2006

Arab British Dynamics (ABD) branch of the Arab Organization for Industrialization (AOI) Company, Cairo-Egypt.

Period : July 2001 to September 2006

Position : First Research Engineer

Projects Title : Several Army Factories :

- Helwan Iron Foundries (Factory 9)

- El Maasara Company for Engineering Industries (Factory 45)

- Maadi Company for Engineering Industries (Factory 54)

- Helwan Company for Metallic Appliances (Factory 360) Responsibilities

Visiting the project sites to inspect the type of furnace required (tank furnace, melting pot, heat treatment furnace).

Determining the type of heat processing on metals such as: annealing, tempering, drying, hardening and estimating the consumption and the power of the burner in Kcalorie and Kwatt in order to select the suitable burner for the desired heat process.

Negotiation with the client about the requirements of the burning system that will be established, for instance if the burner system to be controlled manually or on- off control or automatic control by temperature controller. Enquiring about establishing AC Voltage Stabilizers and recorders. CURRICULUM VITAE

Page 4/3

Testing safety & measuring equipment’s that are established at the gas pipes & air pipe (Pressure regulators, pressure switches, pressure indicators, solenoids gas).

Designing the outer control panel depending on how many burners are required. Testing each electric component inside the control panel. Supervising the technicians during wiring the circuit diagrams of the panel.

Altering the parameter settings of the temperature controller. Enter the programs for heat-time curve if required. Checking the entire control panel and make test operation experiments to ensure that it will operate well at the site.



Contact this candidate