Alejandrina Ramirez # ***
Tel: *******
Cel: 044***-*-**-**-**
Email: ********@*******.***
Edad: 40Años
José Luis Escobar Dominguez
Objectives: Development within the company in engineering, manufacturing or production for the better development of departments and achieve the goals of the company.
Experience:
2016 to present Continental Corporation
Door Handles Manufacturing Planner
* Lead and manage new projects within the specified time, budget and quality frameworks for customer satisfaction and ensuring success for our company
* PDL procedure following
* Carry effective communication with clients and work team regarding the status of the project
* Develop the process flow diagram of the new products in door handles
* Develop the Manufacturing Plan for the new products models
* Develop PFMEA of the production lines of the new products
* Design work stations (ergonomics) of the production lines of the door handles
* Develop equipment specifications for new production lines
* Quote, Buy and validate the equipment for the production lines of the new product
* Train on the handling of new equipment to the end user
* Record the hours used in each project in the CATS system
* Design the concept of manufacturing for new products; participation in the costing of equipment and labor for new products
* Prepare Layout of production lines together with industrial engineering of new products
* Participate in projects for continuous improvement and problem solving
2010/ to 2016 LEAR Corporation
Process Engineer (New Projects Launch Engineering)
* Manage and coordinate new launching and/or engineering changes to implement in manufacturing process till to normal production.
* Develop and control of Process Area Layout.
* Develop and release of Process flow chart, PFMEA, Visual Aids & Safety warnings for manufacturing purposes.
* New tooling design review and testing (Work Stations, fixtures, testing Equipment.).
* Identify early on potential risks and issues at project.
* Troubleshoot testing equipment and assembly machines when components do not meet specifications.
* Validate correct operation of the equipment, check machining parameters to ensure they are in optimum conditions.
* Diagram Positions Elaboration.
* Work Instructions, visual Aids development.
* Release and validation processes.
* Formats to send PTR's (PSN/non cost/PTA).
* Containments for customer complaints.
* Effective implementation for corrective actions.
* Updates and changes to inspection instructions for containment stations.
* Poke yokes design and validation.
* Participation in PTR, coordinate constructions of new models.
2009 / 2010 AMT (Advanced Molding Technology)
QC Supervisor
* Program set-up's for the mounting of molds in the production area.
* Develop the corresponding stationery from the operation, preventive maintenance schedule for the molds that we have in stock.
* Validation of quality inspection routines.
* Validation of production pieces requested by customer.
* Customer complaints assistance.
* PPAP folder elaboration, Control plan.
* 8 D’s
* 5 W’s
*R&R developments.
2006 / 2009 Joist Structural Systems
Prototypes Coordinate
* Validation of machinery and prototypes areas.
* Support in quality issues from the customers and resolve quality notifications through various problem resolution tools to assure a good reliance on the use of the product.
* Track material and develop inventories for construction of prototype pieces.
* Participation in PTR, coordinate constructions of new structures.
* Containments for customer complaints
2005 / 2006 Specialty Packaging
Engineering Assistant
* In charge on the implementation and updates of visual aids and operation instructions.
* Responsible to provide metrics to Staff (Maintenance, Efficiency & Productivity, etc.)
* Assistance in Control plan and PFMEA.
2002 / 2004 Viasystems ECM Juárez
Manufacturing Assistant
*Activities related with the elaboration of visual aids and operation instructions for the production areas.
* Elaboration of reports for maintenance of the production machinery by means of mp 7.2.
* Responsible for the validation of the calibrations of equipment for the electrical tests.
* In charge of the machinery and equipment installation for production of new model years (Workload balancing).
* Software of electrical tests, press fit and alignments back up.
* In charge of the introduction of new models.
* Check the material in receiving area in the warehouse to approve entrance to the production area.
* Lay out modifications for changes inside / outside the plant.
EDUCATION:
Universidad Tec Milenio
Status: Titled (2018)
Master’s Degree
Business Administration in area of quality and productivity
CU Universidad Cultural
Status: Titled (2010)
Industrial and Systems Engineering
Diploma in production control and Kanban system
* Knowledge:
*Dukane 4000, 4100, 2220 Machines, Mold Man 8000, 8200, EOL’s tester, Torques Atlas Copco, Apollo Seiko, Jenzano Welder, Metrix 5525 strip machine, Z+F equipment, Schleuniger 9600, 8310, 2600, TTI’s tester, Press fit machines.
* PFMEA and Control Plan.
* Design of Error Proofing systems (Poke Yokes) for improving current test methods.
* Development of tools and equipment.
* Development of working methods
* Drawings interpretation.
* Workload balancing
* Lay out modification
* Process Flow diagrams.
*Continuous improvement
Skills: Self directed and Dynamic in the field of the industry, easy by word, guided to the perspectives of the company, team player, problem solver, self-motivated, critical thinker who dependably resolves issues and concerns, interpersonal skills.
Training:
Black Belt
Green Belt (certified)
Statistical Process Control.
Ultrasonic and Vibration Plastic Welding
JIT
SMED
Ergonomics Training.
References:
Javier de la Cruz 656-***-****) Launch Car Leader (LEAR Corporation)
Oscar Gramillo 656-***-****) Car Leader (LEAR Corporation)
Roberto Mendez (656-*******) IE MT Manufacturing Tech (Continental 1)