Resume

Sign in

23 years experience in the Field of Construction Management -Pipeline.

Location:
Qibla, Kuwait City, Kuwait
Salary:
as per company policy
Posted:
October 12, 2019

Contact this candidate

Resume:

Page * of *

CURRICULAM VITAE

Mobile No: +965-******** / 65088783 / +91-735*******

E-mail : adaknl@r.postjobfree.com. / adaknl@r.postjobfree.com C. JOTHI BASU

OBJECTIVE:-

To be a part of result oriented professional team that provides challenging innovative work environment and opportunities for carrier and professional development. CARRIER SUMMARY:-

22+ years’ experience in Construction & Commissioning Engineering and Technology in the field like Oil & Gas, Refineries, chemical plant, power plant, Piping, cross country Pipelines and Tankages . EDUCATION :- BACHELOR OF TECHNOLOGY ( MECHANICAL ENGINEERING ) DIPLOMA IN MECHANICAL ENGINEERING.(Pass out April 1996) ASNT LEVEL II IN RT & UT

TRAINING : Managing supervision workshop Training (HSE) Permit To work System (PTW)

Fire & Safety,H2S BA, First Aider,

Certificate of Appreciation (KOC)-On Site Awareness Campaign. PMP (PMI) – Course Completed*

EXPERIENCE SUMMARRY :

S.no From To

No.of

Years Designation Company Name Country

1

Jun

'1996 Dec' 2000 3.5

Assistant

Engineer

ONGC ( Thro' M/s Muruga Agencies –

Construction &Engineering Contractor) INDIA

2

Jan'

2001 Jun '2005 4.5

Construction

Engineer ABAN Constructions (P) Limited - INDIA

3 Jul '2005 Dec' 2008 3.5 Lead Engineer

Reliance Engineering Associates Ltd-

(REAL&RIL) INDIA

4

Feb'

2009 Jul '2010 1.5 Senior Engineer Punj Lloyd Limited -PLL QATAR 5

Sep

'2010 Mar '2011 0.8

Dy. Manager -

Project Titanium Tantalum Products Limited INDIA

6

Mar

'2011 Feb '2012 1.0

Construction

Manager Engineering Maintenance Company - EMCO UAE 7

May

'2012 Oct '2013 1.8

Site

Superintendent Consolidated Contractors Company - CCC KUWAIT 8

Oct

'2013 May '2017 4.5

Assistant

Manager Larsen & Toubro Limited -L&T KUWAIT

9

June

'2017

TILL

DATE 2.0

Dy.Construction

Manager

Heavy Engg Industries & Shipbuilding Co.-

HEISCO(Thro'JML) KUWAIT

Page 2 of 9

EXPERIENCE PROFILE:-

(1) Company : HEISCO( JML through )

Current position : Deputy Construction Manager – Mechanical/Piping Period : June 2017 to Till Date

Main Contractor : Tecnicas Reunidas -TR

PMC : AMEC FOSTER WHEELER

Client : KUWAIT NATOINAL PETROLEUM COMPANY -KNPC.

Project Description :

EPC&C OF GAS TRAIN # 5 PROJECT AT MAA REFINERY –KNPC. HEISCO execute a complete Piping Packages for Pipe Rack and Unit Piping works for GT5- KNPC project. Role and Responsibility Include Commissioning Activities :

Overall Supervision and coordination at Site for Piping Related .Piping Erection, Support Installation and Valve Erection and other Components Erections as per Isometric Drawings and P&IDs.(Refer GAD)

To Attend and Coordinate Project (site) Progress Review meeting. Coordination of Shop Pre-Fabrication in SS, CS, LTCS AS piping materials and Piping supports.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings in Brown field as well as Green filed.

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.(Like Spool tracking and Support Shifting, Issuing of Piping components and Consumables from Store and Check work front and coordinate with other disciplines)

Coordination and Supervision of Erection Equipment (Crane) and Utilizing of without Idle. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.(Close Monitoring the progress meeting with Actual Plan, Project Schedule and Client Requirements)Close coordination with the clients throughout the execution of the project.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness in the Structure and pipe sleepers

Carrying out final P&ID check of installed piping systems in the module. Preparation of “AS BUILT” drawings.

Preparation of field piping system HT Test packages,including system limit on P&ID and piping Isometrics.( Follow Up of punch work)

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project. Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that hydro test reinstatement is to be done as per procedure. Ensure that all punch list items are resolved, client handover is satisfactorily concluded

Ensure work permits and Project HSE Requirements.

Coordinate the Scaffold works and maintain safe working practice at site. Page 3 of 9

EXPERIENCE PROFILE:-

(2) Company : LARSEN &TOUBRO LIMITED

Current position : Asst. Manager – Mechanical

Period : January 2015 to May 2017

PMC : AMEC FOSTER WHEELER

Client : KUWAIT OIL COMPANY (KOC) K.S.C.

Project Description :

NEW GC 30 (Gathering Centre ) PROJECT IN NORTH KUWAIT, EPC CONTRACT OF NEW GC 30 . L&T Hydrocarbon executed a complete Engineer-Procure-Construct contract for a Gathering Center for KOC. The contract valued at approximately $846 million (KWD 239.7 million) Role and Responsibility :

Overall Supervision and coordination of Tank Fabrication and Piping Related .Piping Erection, Support Installation and Valve Erection and other Components Erections as per Isometric Drawings and P&IDs.(Refer GAD)

Well Conversant with the Fabrication and Erection of Storage Tanks- Fabrication and Construction of EPC of the 12 no’s Cone roof Tanks of diameter – (56.140 to 13.270 Mtr and height 17Mtr to 11.Mtr) for KOC GC30

Overall Supervision and coordination of Tank Fabrication and Erection, Support Installation and Valve Erection and other Components Erections as per Approved Drawings.

To Attend and Coordinate Project (site) Progress Review meeting (In-house with other Dept., Subcontractor representatives and Client review -Progress and HSE). Coordination of Shop Pre-Fabrication and Piping supports.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.(Like Spool and Support Shifting, Issuing of Piping components and Consumables from Store and Check work front and coordinate with other disciplines)

Coordination and Supervision of Erection Equipment (Crane) and Utilizing of without Idle. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.(Close Monitoring the progress meeting with Actual Plan, Project Schedule and Client Requirements)Close coordination with the clients throughout the execution of the project.

Assist Design/Engg Department in solving Piping Modification and Technical Problems in the Field Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.

Carrying out final P&ID check of installed piping systems in the module. Preparation of “AS BUILT” drawings.

Preparation of field piping system HT Test packages,including system limit on P&ID and piping Isometrics.( Follow Up of punch work)

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project. Page 4 of 9

Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that hydro test reinstatement is to be done as per procedure. Ensure that all punch list items are resolved, client handover is satisfactorily concluded

Ensure work permits and Project HSE Requirements.

Be a connection between the operating company and the Technology Licensee. Manage and work toward building a cohesive team for the most successful startup possible. Encourage open communication between all parties in the organization.

Attend meetings as required, typically there is a morning meeting to track progress. Answer and give guidance as required.

Issue written guidelines for planned task. The operating company can utilize these guidelines to develop the daily orders.

Manage the commissioning engineer and Supervisor.

Ensure that site processes are monitored and controlled to achieve safe and economical operation while developing all operators to their full potential

EXPERIENCE PROFILE:-

Company : LARSEN &TOUBRO LIMITED

Current position : SR.CONSTRUCTION ENGINEER-Piping/ Pipeline Period : October 2013 to December 2014

EPC Contractor : ALKHORAYEF GROUP COMPANY

Client : KUWAIT OIL COMPANY (KOC) K.S.C.

Project Description :

Construction of New Gathering Centre 16 (GC 16) at West Kuwait -KOC. Mechanical Package of Laying &Installation of Piping and Equipment works . Professional Experience :

Review of Project specification and Drawings.

As LEAD ENGINEER Execution and co-ordination of Piping works, Fabrication, Painting, Erection Installation &Testing activities in the Stipulated time to complete all aspects.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Coordinating and Monitoring Equipments,other Resources and manpower requirement in time and to get complete the Project in Time.

Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.

Develop Construction Engineering Technology in line with Company Policy and Procedures

Elaborates construction feasibility analysis evaluating the available materials & drawings. Raising MTO(s) for all materials required to additional materials for hydro test etc.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.

Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports Assist Design Department in solving Modification and Technical Problems in the Field.

Preparation of Hydro Test Packages including System & “AS BUILT” drawings.

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

Providing a training plan and procedures providing a system manual for each mechanical system Page 5 of 9

Providing a corrective action plan with procedures, commissioning documentation filing procedure.

Providing a commissioning tracking procedure.

Providing requirements for a commissioning final report

Responsible for checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of activities.

Ensure that hydro test reinstatement is to be done as per procedure.

Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.

Good Managerial Skill at Motivating & Accomplishing given Task through Engineers/supervisor/Labor

Anchoring on site Construction activities to ensure completion of Project with in time and Cost taking full effective of resource utilization to Maximize the Output.

Managing the Subcontractor and Scheduling the construction Activity. Certification of Monthly bills as per work Executed by them.

Preparation of DPR, Weekly and Monthly Reports.

EXPERIENCE PROFILE:-

(3) Company : CONSOLIDATED CONTRACTORS COMPANY W.L.L (CCC) Current position : SITE SUPERINTENDENT (Pipeline Project) Period : May 2012 to October 2013

Client : Kuwait Oil Company (KOC) K.S.C.

Project Description :

Construction of New Export Transit Pipelines from New BS 171 to AGRP at Mina Al Ahmadi. EPC contract of Laying &Installation of pipelines including Civil, Mechanical, Electrical & Instrumentation works .

Job Responsibilities: -

Overall supervision of the Planning,Constructional activity of Pipelines and Piping in EPC Projects.

Supervising & Guiding of Team Engineer/Supervisor/Foremen for various section of Pipe Stringing, Mainline Welding, Field Joint Coating, Cold Field Bending, Crossing (HDD),Trenching, Lowering in, Tie in Welding, Back Filling .

Execution and coordination of piping erection activities and pipe supports.

Execution and coordination of all hydro Static testing activities of Underground Pipelines & Above ground piping including Line History, Pipe book test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Continuous follow up & Coordination for the material to site.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Coordination and Technical guidelines to the Sub-contractors like HDD, Cold Cutting, Coating & Hydrostatic Testing

Manpower planning and mobilization, material planning and its flow control, & consumables arrangements,

safety coordination, attending safety and progress meeting, coordination with client, &permit systems. EXPERIENCE PROFILE:-

(4) Company : ENGINEERING MAINTENANCE COMPANY (EMCO-EDAC-ASCON) Current position : Construction Manager (Pipeline Projects) Period : March 2011 to February 2012.

Client : Abu Dhabi Gas Industries Limited (GASCO)

Page 6 of 9

Project Description :

Replacement of 10” & 16” Gas Pipelines in BAB Area .EPC contract of Laying & Replacement pipelines including Civil, Mechanical, Piping, Electrical & Instrumentation works . Job Responsibilities: -

Overall supervision of the Planning,Constructional activity of Pipelines and Piping in EPC Projects.

Execution and coordination of piping erection activities and pipe supports.

Execution and coordination of all hydro/Pneumatic testing activities, including Line History, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Continuous follow up & Coordination for the material to site.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Coordination and Technical guidelines to the Sub-contractors like HDD, Hot tapping,surveying ( Topographical &Geotechnical),Coating & Hydrostatic Testing .

Manpower planning and mobilization, material planning and its flow control, & consumables arrangements,

safety coordination, attending safety and progress meeting, coordination with client, &permit systems.

Be a connection between the operating company and the Technology Licensee. Manage and work toward building a cohesive team for the most successful startup possible. Encourage open communication between all parties in the organization.

Attend meetings as required,typically there is a morning meeting to track progress. Answer and give guidance as required.

Issue written guidelines for planned task. The operating company can utilize these guidelines to develop the daily orders.

Manage the commissioning engineer and operator.

Ensure that site processes are monitored and controlled to achieve safe and economical operation while developing all operators to their full potential.

Coach the operators to complete the maximum possible amount of follow-up on their own when items are not as per normal operation. Be an approachable coach to those on your team. Help the operators learn and grow by enthusiastically sharing your knowledge with them and helping them solve problems.

Provide technical leadership and expertise to facilitate safe, reliable, and economical Operation of the site processes

COMMISSIONING ACTIVITIES INVOLVED :

A commissioning plan shall be prepared and shall provide for all activities associated with commissioning.

These activities include the following, Developing a design basis document.

Establishing the commissioning team and their responsibilities.Listing the systems involved.

Providing for project cost and schedule impact resulting from commissioning activities.

Providing a pre-functional test plan with procedures for testing each system.

Providing a functional performance test plan with system test procedures including deferred

Test procedures for each system, corrective action plan with procedures.Providing a commissioning documentation filing procedure.

Providing a commissioning tracking procedure.

Providing requirements for a commissioning final report.

Providing training modules for the operating and maintenance (O & M) staff on each system.

Providing a training plan and procedures providing a system manual for each mechanical system

(5) Company : M/s TITANIUM TANTALUM PRODUCTS LIMITED Current position : Deputy Manager (Project)

Period : September 2010 to March 2011.

Client : Babha Atomic Research Center/KNRPC-Kalpakkam Page 7 of 9

Project Description :

Fabrication and erection of piping subassemblies in RHA process chamber for project P3A In-cell SS 304L/316L Piping at KNRPC-Kalpakkam Tamilnadu.

Job Responsibilities: -

Planning and Execution of the fabrication of piping.

Execution And coordination of piping erection activities.

Execution and coordination of all hydro/Pneumatic testing activities, including Line History, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Coordination with HO for Sequential supply of materials.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Giving the technical guidelines to the subordinates and contractors.

Manpower planning and mobilization, material planning and its flow control, consumables

arrangements,

safety coordination, attending safety and progress meeting, coordination with client, permits. Identify

tools and test instruments required for performing various activities & prepare data sheet for their

procurement. Responsible for daily progress reports and close out reports.

(6) Company : M/s PUNJ LLOYD LIMITED

Current position : Senior Engineer (Construction-Pipeline) Period : February 2009 to July 2010

Client : M/s Qatar Petroleum

Project Description :

Laying of 36" Twin gas pipe line 211km Ras Laffan to Meseaid, EPIC of Strategic Gas Transmission Pipeline Project (SGTP).in Doha, Qatar.

(7) Company : M/s Reliance Engineering Associates Ltd., (REAL&RIL) Current position : Lead Engineer (Construction & Commissioning) Period : June 2006 to Dec 2008.

Contractors : M/s JSC Stroytransgaz – STG Russia

M/s L&T Ltd., & M/s Punj Lloyd Ltd.,

Project Description :

Laying of 48" gas pipe line 1400km Kakinada to Gujarat East West pipe line project (EWPL) including boost up compressor stations. Location : Spread II and Compressor Stations -2 (VJA) Summary of skills and Experience: -

Experienced in laying of cross country pipe lines and off shore pipe lines.

Experienced in Fabrication and erection of piping.

Experienced in Refinery Shutdown piping Works.

Experience in terminal modification and hot tapping's.

Experience in erection of equipments like compressors, turbines, pumps, structural's and boilers.

Experienced in Fabrication of tanks, vessels and piping supports.

Experienced in guiding a team engineers, supervisors, and skilled workers.

Maintain the good relation with contractors.

Page 8 of 9

Job Responsibilities: -

Planning and Execution of the fabrication of piping.

Execution And coordination of piping erection activities.

Execution of all site activities for cross country pipeline as well as above ground piping.

Execution of HDD crossing and major road & railway and River Crossing.

Execution and coordination of all hydro testing activities, including pipe book, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Coordination with HO for Sequential supply of materials.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Giving the technical guidelines to the subordinates and contractors.

Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and Common Areas

Tightness Test and Nitrogen Purging/Inerting, Assist Pre-commissioning and Commissioning Activities

Make/prepare Operational Test Procedure (OTP)

Make/prepare Nitrogen Leak Test Packages with markup P&ID

Make/prepare detailed Nitrogen Leak Test Procedures

Offer to the Client for Witness/Inspection Pre-commissioning and Commissioning activities

Conduct Mechanical Running Test and OTP for all equipment

Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem

Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load up to base load, shutdown sequence.

Company : M/s Reliance Engineering Associates Ltd., (REAL) Designation : Construction Engineer (Mechanical/Piping) Period : July 2005 to June 2006.

Project Description:-

Fabrication and erection of piping for FCCU and COKER Unit, Revamping pre shutdown and shutdown activities, at Reliance Industries Ltd., Jamnagar, Gujarat. Job Responsibilities:-

Execution and coordination of piping erection activities at site as per IFC.

Fabrication and Erection of the pipe support.

Coordination for testing and commissioning of piping.

Co orientation with material management for sequential supply of material.

Giving the technical guidelines to the subordinates and contractors.

Prepare all final documents. Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and

Common Areas

Tightness Test and Nitrogen Purging/Inerting, Assist Pre-commissioning and Commissioning Activities

Make/prepare Operational Test Procedure (OTP)

Make/prepare Nitrogen Leak Test Packages with markup P&ID

Make/prepare detailed Nitrogen Leak Test Procedures

Offer to the Client for Witness/Inspection Pre-commissioning and Commissioning activities

Conduct Mechanical Running Test and OTP for all equipment

Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem Page 9 of 9

Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load

up to base load, shutdown sequence

Ensure Safety, Hazard analysis, Pumps, and Compressors,Piping,Process Control Systems, Electrical Systems Functioning.

Brine and sea Water Systems and Treatment,

Process Utilities, Relief Valve and Flare Systems controlling

(8) Company : M/s ABAN CONSTRUCTIONS (P) LTD

Designation : Construction Engineer.

Period : Jan 2001 to June 2005.

Project Description :-

1.Laying of cross country pipe line various sizes like 12" to 40" and construction of boost up station and valve stations above ground piping.

2.Fabrication and Installation of Oil and Waste Water Storage Tank Project in GSPL and Bharuch Equa and Aqua –Disposal Project

Job Responsibilities:-

Supervising the pipeline construction activities.

Execution the piping fabrication for boost up and valve stations.

Execution of fabrication and erection piping works as per schedule with targeted dates.

Erection of equipments like compressor, pump, fans., turbine.

Fabrication and erection storage tank and associated piping.

(9) Company : M/s MURUGA AGENCIES (ENGINEERING CONTRACTOR) For ONGC & GAIL Cauvery basin Projects

Designation : Asst. Engineer

Period : From June 1996 to Dec 2000

Job Responsibilities:-

Supervising the pipeline construction activities.

Execution the piping fabrication for boost up and valve stations.

Execution of fabrication and erection piping works as per schedule with targeted dates.

Erection of equipments like compressor, pump, fans., turbine.

Fabrication and erection storage tank and associated piping.

Execution and co-ordination of Shut down and Commissioning jobs.

In charge for the Fabrication and Construction of EPC 2 nos Fixed cone Roof tank of diameter – (14.5 Mtr and height 9 Mtr) at Bharuch waste Water Treatment Plant Personnel Profile :

DATE OF BIRTH : 03.01.1975.

FATHER'S NAME : M.Chinnaiyan.

NATIONALITY : Indian

LANGUAGES KNOWN : English, Hindi, Tamil

MARITAL STATUS : Married ( Two Children School Going) PASSPORT DETAILS : P7111547 (Valid up to Dec 2026) C. JOTHIBASU

+965-********/+917*********

+965-********



Contact this candidate