Ramesh Raja

(India) +91-805*******,(Uzbekistan)+998-********* adaj3l@r.postjobfree.com

Career Goal: Piping Engineer.

Seeking high level assignments in Piping fabrication, Erection, Piping Pressure testing and Piping Pre Commissioning with an organization of repute preferably in onshore/offshore oil& gas Construction sector.

Career Skills

Understanding of PLOT

PLAN Drawing

Understanding of Piping

GA Drawing

Hands on Experience of

erection/installation

Understanding of

Steel Structure

Erection drawings.

Understanding of

P &ID Diagram

Hands on

Experience of

pressure testing

Understanding of Mechanical

Erection drawings.

Understanding of Piping Material

Hands on Experience of Pre

commissioning.

Experience

NAME OF THE COMPANY DURATION

Employer : Enter Engineering Pvt.Ltd (EPC)

Project : Gas To Liquid Project(Uzbekistan)

Piping Engineer

September 2019 to till date

Employer : GS Engineering & Construction (EPC)

Project : KARBALA Refinery Project(Iraq)

Piping Engineer

June 2018 to June 2019

Employer : Satnam Global Infra Project Ltd

Project : MSQ Refinery Project (India)

Piping Engineer

June 2017 to March 2018

Employer : Samsung Engineering (EPC)

Project : Increase Gas Handling Capacity (KSA)

Piping Engineer

January 2014 to February 2017

Employer : Lahoud Engineering Co.Ltd

Project : Shah gas plant Project (Abu Dhabi)

Piping Engineer

February 2013 to September 2013

Employer : Nasser al Hajri corporation, KSA

Project : Saudi Aramco Total Refinery Project

Piping Engineer

July 2008 to October 2012

Education

Bachelor of Engineering in Mechanical Engineering from Xavier's Catholic College Of Engineering, Nagercoil, under Anna University Of Tamil Nadu, India. Duties and Responsibility in Piping / Pre commissioning.

Coordinating with Subcontractor Construction Team & Work permit team on Daily basis.

Following Client / Contractor HSE Rules, Work permit procedures (PTW) & tool Box meeting procedures strictly.

Studying the work based on the scope and referring drawings (Isometrics, GAD drawings, 3D Views &Other Layouts).

Reading the Isometric Drawings with MTO,creating Priority list & providing the requisite support.

Preparation of procedures and method statements for Fabrication & execution of the work.

Planning, scheduling & monitoring the work to achieve the target within specified time and quality.

Checking availability of materials required to complete the work

Involving piping fabrication works for underground piping and above ground piping and manpower allocation of work based on schedule and monitor timely completion of the work

Supervising the arrangement of Tools and Tackles and Equipment required for erection

Involving daily progress report preparation and co-ordination with planning department for manpower and material requirements

Coordination with different disciplines for availability of the work front for piping installation.

Reporting to Mechanical Construction manager, Project manager and Commissioning manager regarding the project progress and various construction activities.

Submitting the Manpower & Equipment requirements to Construction Manager for ongoing & upcoming jobs along with current manpower &equipment status on daily basis.

Handling all piping technical queries and investigating the related problems, including the drawing of field sketches as per the requirements.

Strong abilities to interact with all level of departments and clients to carry out job n time

Coordinate with Quality department for the various inspections during fabrication, erection and Hydro/Pneumatic testing.

To liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site.

Involves with Civil Team & Structural Team, Equipment Team, and Instrumentation Team and Solve the Interface Problems.

To attend the meeting with the client Coordinates with the various team to administer all assignments.

Preparation of as built drawings and test pack, punch list, hydro testing, flange management and box up activities as per applicable codes and standards.

Reinstatement and Final Package Handover for mechanical completion.

Manpower,equipment and material planning for temporary piping, cleaning, gauging, pneumatic testing, drying and leak testing.

Checking pneumatic test equipments and instruments.

Preparation/review of procedures for cleaning, gauging, drying and leak testing.

Execution and supervision of pneumatic testing, air blowing, water flushing, oil flushing and leak testing.

Fully understanding the work to be done and identify the exact plant or apparatus to work on.

Review the system/equipment isolation and the placement of locks and tags based on the respective LOTO work permit clearance form.

Lead and supervise a group of pre commissioning works (e.g.welders, pipe fitters, helpers).

Coordinate with work permit controller and apply for a lockout/tagout(LOTO) permit for the respective system/equipment to work on.

Provide the work permit controller with all pertinent information regarding the work activities to be accomplished under the LOTO.

Other Duties and Responsibility for Static Equipment

Good knowledge about Permit to work systems (PTW) and several kinds of permits like Cold work permit, Hot work permit, etc.

Study of Scope, Work method statement & ITP

Checking the bills of materials and equipment supplied to the contractors.

Material receiving inspection as per ASME section 2 as per client requirement.

Responsible for mobilizing the manpower for various Vessel Internal activities.

Coordination with Quality, Contractor and Company for Inspection and Work Permit.

Responsible for Site Preparation work, Material segregation for the vessels/Columns.

Preparation of foundation padding for static Equipment

Make plan for Equipment delivery and Erection on site, based on available at site condition.

Supervising in static equipment erection and installation of internal parts in pressure vessels

Established QC Procedures.

Ensure the correct direction for fixed and sliding saddles as per drawing.

Ensure the Various alignments of erected Equipment’s along with Surveyor.

Getting clarification from Engineering Department for tq-site technical queries.

Follow-up & Updating work progress to Superiors as per the Schedule.

Pre commissioning activities. (Water flushing, Air Blowing, Air Rupturing) Client Interaction

Interact With Clients To Understand Their Specific Requirements And Execute Projects Accordingly. Update Clients On Project Progress And Submit Timely Reports To Them. Taking Refresher On Day-To-Day New Updates Transferred By The Client. Attending All Meetings Related To Projects. To Help Maintain Client Satisfaction. Personal Details

Name : Ramesh Raja

Age / Gender : 33 Male

DOB : 23 May 1985

Nationality : Indian

Marital Status : Married

Communication : 3-5, Arokyanagar, Muthalakurichy, Thuckalay

(P.O) Kanyakumari District, Tamil Nadu, India.

Passport Details

Passport Number : P5804166

Date of Issue : 22.12.2016

Date of Expiry : 21.12.2026

Place: India Ramesh Raja