Resume

Sign in

Project Architect

Location:
Fereej Ibn Dirhem, Qatar
Posted:
September 27, 2019

Contact this candidate

Resume:

Page * of *

FERNANDO LUCIANO ESTOPEL

A R C H I T E C T

TELEPHONE: +974-****-****

MOBILE NO.: +974-****-****/31321966

E-MAIL ADD.: adagi1@r.postjobfree.com / adagi1@r.postjobfree.com PROFESSIONAL / WORK HISTORY:

ARCHITECT on VERTICAL & INFRASTRUCTURE:

With 16 years total experience in GC Country (Doha Qatar from July 2003 to Present) and 10 years in Philippines.

PROJECT HIGHLIGHTS:

o Responsibility to managed planning, monitoring & supervise the handled project hotel, apartment, residential, mixed-use, commercial, retail, restaurant for architectural & fit-out. o QA/QC architectural acoustical, interior design & finishes of floor, ceiling and behind drywall, masonry, concrete like wall paneling, painting, tilling, marble, granite, terracotta and other stone type finishes specified.

o Involved management of the architectural external finishes interfacing with internal wall, facade (curtain wall & stone cladding) and landscape in complexity and scope. o Have a Leadership in Energy and Environmental Design (LEED). Abide or complied for new innovation technology required to meet the project specification. o Manage a progressive material and utilities installation as well as Furniture, Fixture, and Equipment (F, F & E) handover phase process.

o Fit-out and architectural finishes Vertical & Infrastructure (LRT) light rail train sub-station and Toll both & Traffic Control Room of North Luzon Express high-way (NLEX). General Duties and Responsibilities:

A. I can provide technical assistance and inputs for execution and implementation of the project, checked & reviewed prepared package drawing from DC1, DC2 up to IFC. B. Manage a progressive shop drawing plans & review specification, BOQ, contract, pre-qualification, material submittal, and formulation of Health, Safety and Environmental plan. C. Manage preparation, review & checking project Methodology (MS), Inspection & Test Plan (ITP) & Risk assessment.

D. Prepared and arranged snag or punch list required to complete the contract and construction project handover process procedure for end user.

E. Manage and tracking of change orders, pay application and other contractual modifications impacted budget and schedule.

F. Oversee selection of building systems and associated documentation. G. Lead project coordination and site meeting with internal team member and external consultant,

(owner) / cient reprecentative, contractor, sub-contractor and supplier. H. Primarily involve in Mock-up inspection and verification that requires oversight, guidance, advises, monitoring and selection associated in various architectural phases. I. Responsible to determine contractor needs and recommend personnel motivating project teams qualification evaluation and approval prior conduct a formal job execution on the site. J. Responsible in architectural site work include the inspections on accomplishment and monitoring daily site progress.

K. Issued the Site Instruction, SDR or NCR to the contractor non-compliance as per methodology, approved shop drawing and project specifications.

L. Analyzed, evaluate, recommendation, and comments upon the assessment drywall, masonry, block works and other architectural aspect such as finishes cladding, paneling, wall curtain, glass, painting and all related in exterior and interior tiles or stone finishes contractor request for inspection. M. Verified material sample and laboratory test like plaster pullout test, blocks compressive test, mortar and masonry test, screed and lightweight concrete, acoustical, fire proofing sealant, expansion joint, water proofing serve as a bench mark.

N. QA/QC surveillance and monitoring Façade, fit-out and installation of architectural glassing, decorative steel and other architectural ceiling, floor and wall finishes tiles, stone, granite, marble, masonry, block work, painting, wall fabric, floor carpet, raise floor, and partion demountable. O. Witness & implementation the HSE for the welfare and safety of the workers on site with the certified and well trained personnel.

EDUCATION

B. S. in Architecture 1992

Technological Institute of the

Philippines

20th ave. Cubao, Quezon City

Philippines

PROFESSION

Registered & License

Architect

NATIONALITY

Filipino

LANGUAGE

English

Tagalog

Arabic (Basic)

LICENSE & REGISTRATION

UAP – (Phil.)

UPDA - (Qatar) A

AIA (Int’l. Member)

CERTIFICATION

LEED GA

CFM

MEMBERSHIP

(UAP) United Architect of the

Philippines

United Filipino Architects Qatar

(UFAQ -Qatar)

IT SKILL

AutoCAD

Microsoft Office

Aconex

Construct ware

POFILE SUMMARY:

Within 26 + years of my journey in Philippines and Qatar I was involved in different prestigious multi-billion-dollar project infra- structures (LRT & High-ways) & vertical structures (bank, hotel, residential, mixed used, hospital/health center, retail, commercial, restaurant, school & recreational resort and facilities). Engage with International & local Consulting Firm and other well-known International Contracting Company shown list of company below. List of COMPANY and project:

DIVERSE CONSULT

Doha, Qatar

June 01’ 2019 – Present

PROJECT HIGHLIGHTS:

Health Care Center - Al Khor, Qatar (Under Al Tawfeeq Contracting Company) ALBAKER ARCHITECTS

Doha, Qatar

December 18’ 2017 – April 30’ 2019

PROJECT HIGHLIGHTS:

DohAlive Hotel (Airport road) - Al Najma Area, Qatar Mixed Used (Hotel, Retail & Commercial)

NATIONAL ENGINEERING BUREAU (NEB)

Doha, Qatar

February 15’ 2016 – September 26’ 2017

PROJECT HIGHLIGHTS:

Doha Oasis Hotel (MSHEIREB) - Al Mushreib Area, Qatar Mixed Used (Hotel, Residential, Commercial, Cinema, Mall & Recreational) GULF ENGINEERING AND INDUSTRIAL CONSULTANCY (GEIC) Under Topaz sponsorship Doha, Qatar

September 18’ 2014 – June 12’ 2015

PROJECT HIGHLIGHTS:

Doha Land (MSHEIREB) - Al Mushreib Area, Qatar

Mixed Used (Hotel, Residential, School, Commercial, Mall & Recreational) DIWAN AL EMARA (under Topaz sponsorship)

Doha, Qatar

November 02’ 2013 – August 12’ 2014

PROJECT HIGHLIGHTS:

Private Diwan Amiri Office (1B+G+1) Al Rayyan, Qatar Hilton Double Tree Hotel (2B+G+M+4) Al Saad, Qatar Sinyar Tower (2B+G+52) West Bay, Qatar

Al Thuraya Tower (3B+G+42) West Bay Area, Qatar

Sudan School Industrial Area, Qatar

TOPAZ CONTRACTING & SERVICES

Doha, Qatar

June 20’ 2015 – January 31’ 2016

May 20’ 2013 – October 30’ 2013

PROJECT HIGHLIGHTS:

Underground Car Parking (B+3) – Doha, Qatar

Qatar Mall – Doha, Qatar, Lusail – Doha, Qatar

BOUYGUES BATIMENT INTERNATIONAL

Doha, Qatar

September 21’ 2010 – April 30’ 2013

PROJECT HIGHLIGHTS:

Qatar Petroleum (QP) District – West Bay Doha, Qatar Nine Towers (16 – 48 storeys average)

409 keys five-star Hotel

Energy Center

Car Parking Building

7-hectare 3-level Basement Parking

PENTA CONSULTANT

Doha, Qatar

December 27’ 2008 – August 20’ 2010

PROJECT HIGHLIGHTS:

Vodafone Cell Site Telecommunication

Green Field Tower (30 meter high)

Roof Tower (9 meters – 12 meters high)

ADIL JAIDAH & ASSOCIATES (AJA)

Doha, Qatar

July 11’ 2003 – December 20’ 2008

PROJECT HIGHLIGHTS:

Doha Bank Head Quarters (3B+G+M+25) – West Bay, Qatar Dunes Hotel (2B+G+M+21) – West Bay, Qatar

Al Hitmi Apartment – 6 Duplex (G+12) Al Hitmi, Qatar Twin Building (G+7) – Al saad, Qatar

Apartment Building (G+6) – Al Jadeeda, Qatar

Office Building (B+G+2) – Al Alsaad, Qatar

Commercial Apartment (G+M+2) – Al Munthaza, Qatar

Commercial Building (G+1) Shakaraba Area

Villa & Ancillaries (G+1) – Perl Qatar Area

Show Room Refurbishment (Ground Flr.) – Bin Mahmud Compound Villa (48 G+1) – Ain Khalid, Qatar

Compound Villa (34 G+1) – Muather, Qatar

ASTETIK DESIGN PHIL.

Quezon, City Philippines

ARCHITECT (Light Rail Transit – LRT Line 2)

October 2001 – June 2003

PROJECT HIGHLIGHTS:

o 11 No. of Station

o 13.8 km. (8.6 miles) Track Length

o 8 – Speed (60-80 km. / H.) 37.50 mph.

Duties and Responsibilities:

Furnished Architectural data or information required to complete the process and document of the project. Monitored closely the progress of construction site activities and do the daily report. Witness the HSE site implementation for the welfare and safety of the workers on site with the certified and well trained personnel. Assigned as site Architect to manage the project but not limited to fit-out, inspection, coordination and monitoring in the whole architectural activities for every LRT Station. Also involve in Architectural finishes interior and exterior monitoring, coordination and supervision of the designated station. FREE LANCE ARCHITECT

December 1999 – September 2001Architect Professional practitioner but not limited to design but also involve in built and project management with own project such as Interior Design & Build, Community Chapel, Residential Apartment and Community Health Center and reimbursements Endoscopy unit in Makati Medical City. Recreational beach Resort composed of swimming pool, SPA, landscape, cottage, clubhouse and other recreational amenities. FNSP (PHILIPPINES)

Pasay, City Philippines

PROJECT MANAGER

June 1997 – December 1999

Duties and Responsibilities:

Managed the project and personnel Staff, liaise and assist the architects and engineers with their respective discipline in monitoring the daily site activities. Conduct a weekly progress and technical meeting with the client representative and contractor and other personnel who may involve on the project. Project monitoring as per planning followed accordingly. And cash flow must be closed monitored too and report on the board the daily, weekly and monthly work progress and budget flows. Handled project was a different hotel in average level is in 35 storey. And water resort in Batangas, City Philippines. DESIGN PROGRAMERS PHIL.

Makati, City Philippines

INFRASTRUCTURE (ARCHITECT)

June 1995 – June 1997

PROJECT HIGHLIGHTS:

Rehabilitation and modernization of the 84 kilometer (NLEX) North Luzon Express. Demolished existing 91 Toll Booths, to give way 145 new Toll Booths and additional 4 Toll Plaza.

o TCRS (Traffic Control Room) system.

o CCTV

o EC LANE

o SWIPE CARD + CASH

Duties and Responsibilities:

Do the architectural task with design and site visit and monitored the daily activities and implementation, as per specification and approved shop drawing. While followed the inspections procedure of one activity prior the next level site activities due the process of implementation of methodology are strictly compliance. Installation of architectural finishes such as stone, tiles, paint, etc. in interior and exterior. And do the landscape as well the hardscape inspections (Curb, Garden, Lime, and Natural stone, Pavement etc.) other structure and Kiosk.

DESIGN ARCHITECT (in Various Companies)

May 1992 – 1995

Site acquisition and zoning compliance and built structure base on the economically and material availability in local area. Do a manual drafting and freehand presentation of various projects to Finalized the schematic design and implementing final design on the site as per client approval. Furnished data and information required to complete the process of project (permit and documentation).

DRAFTING ARCHITECT (in Various Companies)

May 1989 – 1992

Accepted set working drawing as per personal project under professional registered & license Architect supervision. Manage manual drafting and freehand presentation for various projects as per client requirements and approval. And incorporate furnished data and information required to complete the process of project for acquired document for building permit and construction.



Contact this candidate